There Is No Legitimate Nondiscriminatory Reason For The CO ...

The Draft Report(s) shall reference and include all backup materials. The Draft Report(s) must be provided and presented to the TOM. Unless required otherwise by the SOW, the TOA Contractor must plan within their Work Plan to incorporate the TOM’s recommended edits into a Final Report (for each contract) due within ten (10) working days of the delivery and presentation to the TOM of the ... ................
................