Consolidated Rate Schedules



WESTERN AREA POWER ADMINISTRATIONDESERT SOUTHWEST REGION CONSOLIDATED RATE SCHEDULES – FY 2021PARKER-DAVIS PROJECT ScheduleDescriptionRatesEffective DatePD-F7WHOLESALE FIRM POWER CAPACITY CHARGE$2.99 kW-Month10/1/20 ENERGY CHARGE6.84 mills/kWh10/1/20 COMPOSITE13.67 mills/kWh10/1/20 LCBDF CHARGE4.50 mills/kWh (AZ)10/1/202.50 mills/kWh (CA/NV)10/1/20Click here for Rate SchedulePD-FT7FIRM TRANSMISSION SERVICE$20.64 /kW-Year10/1/20$1.72 /kW-Month10/1/20$0.3969 /kW-Week10/1/20$0.0565 /kW-Day10/1/20Click here for Rate Schedule2.36 mills/kWh10/1/20PD-FCT7TRANSMISSION SERVICE SLCA/IP$10.32 /kW-Season10/1/20Click here for Rate Schedule$1.72 /kW-Month10/1/20PD-NFT7NONFIRM TRANSMISSION SERVICE2.36 mills/kWh10/1/20Click here for Rate SchedulePD-NTS4NETWORK INTEGRATION TRANSMISSION SERVICENetwork customer’s load-ratio share times one-twelfth of the Annual Transmission Revenue RequirementClick here for Rate ScheduleAnnual Transmission Revenue Requirement$53,205,29710/1/20DSW-TL1LOSS ASSESSMENT3.0%10/1/20Click here for Rate ScheduleDSW-UU1UNRESERVED USE PENALTIESSee Rate Schedule10/1/20Click here for Rate SchedulePoint of Contact: Florence BrooksWESTERN AREA POWER ADMINISTRATIONDESERT SOUTHWEST REGIONCONSOLIDATED RATE SCHEDULES – FY 2021BOULDER CANYON PROJECT ScheduleDescriptionRatesEffective DateBCP-F10WHOLESALE POWER SERVICEClick here for Rate Schedule ? BASE CHARGE$65,443,46210/01/20? ENERGY DOLLARS$32,721,73110/01/20? CAPACITY DOLLARS$32,721,73110/01/20? FORECAST ENERGY RATE9.05 mills/kWh10/01/20?Applied for Use of Excess Energy, Unauthorized Overruns & Water Pump Energy? FORECAST CAPACITY RATE$1.69 /kW-Month10/01/20?Applied for Use of Unauthorized Overruns? CALCULATED ENERGY RATEn/a ?Calculated within 90 days after the end of each Rate Year. If the Energy Deemed Delivered is greater than 4,501,001 MWh, then the Calculated Rate shall be applied to each Contractor's Energy Deemed Delivered. A credit or debit shall be established based on the difference between the Contractor's Energy Dollar and the Contractor's Actual Energy Charge.? COMPOSITE18.10 mills/kWh10/01/20? LCBDF CHARGE4.50 mills /kWh (AZ)10/01/20??2.50 mills/kWh (CA/NV)10/01/20?LOSS ASSESSMENTn/a?Point of Contact: Christina MaldonadoWESTERN AREA POWER ADMINISTRATIONDESERT SOUTHWEST REGION CONSOLIDATED RATE SCHEDULES – FY 2021 INTERTIE PROJECT ScheduleDescriptionRatesEffective DateINT-FT5FIRM POINT-TO-POINT TRANSMISSION SERVICE$19.32 /kW-Year5/1/13?$1.61 /kW-Month5/1/13?$0.3715 /kW-Week5/1/13?$0.0529 /kW-Day5/1/13?2.21 mills/kWh5/1/13Click here for Rate Schedule?INT-NFT4NONFIRM POINT-TO-POINT TRANSMISSION SERVICE2.21 mills/kWh5/1/13Click here for Rate ScheduleINT-NTS4NETWORK INTEGRATION TRANSMISSION SERVICENetwork customer’s load-ratio share times one-twelfth of the Annual Transmission Revenue RequirementClick here for Rate ScheduleAnnual Transmission Revenue Requirement$30,607,82610/1/20DSW-TL1LOSS ASSESSMENT3.0%10/1/20?Click here for Rate ScheduleDSW-UU1UNRESERVED USE PENALTIESSee Rate Schedule10/1/20Click here for Rate SchedulePoint of Contact: Kevin Schaefer WESTERN AREA POWER ADMINISTRATIONDESERT SOUTHWEST REGIONCONSOLIDATED RATE SCHEDULES – FY 2020CENTRAL ARIZONA PROJECT ScheduleDescriptionRatesEffective DateCAP-FT3FIRM POINT-TO-POINT TRANSMISSION SERVICE$21.00 /kW-Year1/1/20$1.75 /kW-Month1/1/20$0.40 /kW-Week1/1/20 $0.06 /kW-Day1/1/20Click here for Rate ScheduleCAP-NFT3NONFIRM POINT-TO-POINT TRANSMISSION SERVICE2.40 mills/kWh1/1/20Click here for Rate ScheduleCAP-NITS3NETWORK INTEGRATION TRANSMISSION SERVICENetwork customer’s load-ratio share times one-twelfth of the Annual Transmission Revenue RequirementClick here for Rate ScheduleAnnual Transmission Revenue Requirement$13,229,3751/1/20DSW-TL1LOSS ASSESSMENT3.0%10/1/19Click here for Rate ScheduleDSW-UU1UNRESERVED USE PENALTIESSee Rate Schedule10/1/19?Click here for Rate SchedulePoint of Contact: Florence BrooksWESTERN AREA POWER ADMINISTRATIONDESERT SOUTHWEST REGIONCONSOLIDATED RATE SCHEDULES – FY 2020DSWWALC ANCILLARY SERVICES ScheduleDescriptionRatesEffective DateDSW-SD4Scheduling, System Control and Dispatch$16.48 /Schedule10/1/20Click here for Rate ScheduleDSW-RS4Reactive Supply and Voltage Control$0.054 /kW-Month 10/1/20Click here for Rate ScheduleDSW-FR4Regulation and Frequency Response$0.096 /kW-Month10/1/20Click here for Rate ScheduleDSW-EI4DSW-GI2Energy ImbalanceSee below10/1/20Click here for Rate ScheduleGenerator ImbalanceClick here for Rate ScheduleDeviationsSettlementsOn-PeakOff-PeakLess than or equal to ±1.5% (with a 4 MW minimum)of metered load or generation 100%100%Greater than ±1.5% up to 7.5% (or greater than 4 MW to 10 MW) of metered load or generation110% for underdeliveries 110% for underdeliveries90% for overdeliveries 75% for overdeliveriesGreater than ±7.5% (or 10 MW) of metered load or generation1125% for underdeliveries 125% for underdeliveries 75% for overdeliveries60% for overdeliveries1 An intermittent resource will be exempt from this deviation band but will be subject to the settlement provisions in the second deviation band for all deviations greater than ±7.5% (or 10 MW) of metered generation.DSW-SPR4DSW-SUR4Spinning ReserveNone available210/1/20Click here for Rate ScheduleSupplemental ReserveClick here for Rate Schedule2 Upon request, WALC will purchase at market price and pass-through the cost plus administrative fee.Point of Contact: Todd Statler ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download