Crane lift study plan - Laing O'Rourke



-26035000CRANE LIFT STUDY PLAN TEMPLATE Critical Lift Study/ Plan Project DetailsTask Description DateJob Location Area Contact name and Number Start Date Finish date This Critical Lift Study/Plan has been developed using the knowledge available at the time of planning and prior to the lift(s) commencing.In all instances, this Plan/Study must be reviewed by the Appointed Person in consultation with the Crane Operator(s) prior to the lift commencing.* = Mandatory review and sign-offPlan prepared byName:Signature:Date:*Appointed Person* Lift Crew / Crane OperatorName:Signature:Date:Name:Signature:Date: Name:Signature:Date:Mobile Crane Lift Study / Plan Project DetailsTask Description Load DescriptionWork order number Length:Width:Height:Weight: FORMCHECKBOX Single Lift FORMCHECKBOX Dual Crane (+20%) FORMCHECKBOX Triple Crane (+33%) FORMCHECKBOX Multi Crane (+50%)Crane IDRigging WeightHook Weight% allowanceStart weightCrane 1 IDCrane 2 IDCrane 3 IDCrane 4 IDCrane 1Crane 2Crane 1 % of loadCrane 2 % of loadStart weightStart weightLoad ShareLoad weightTotal LoadTotal LoadRadius (m)Radius (m)Capacity at radiusCapacity at radiusTotal Percentage of UtilizationTotal Percentage of UtilizationCrane 3Crane 4Crane 3 % of loadCrane 4 % of loadStart weightStart weightLoad weightLoad weightTotal LoadTotal LoadRadius (m)Radius (m)Capacity at radiusCapacity at radiusTotal Percentage of UtilizationTotal Percentage of UtilizationPrepared by Signature Date Personnel and Equipment Details Personnel NameClassificationCertificate NumberCranesUnit No.MakeCapacityProposed CWTConfigurationLoad ShareTransport Unit NoPrime MoverTrailerReg. No.Max Load CapProposedLoadOther information (workbox/harness, ect) Prepared by Signature Date Lift Plan View – Diagram Project DetailsTask Description Work order number Sketch the load and mark the following: 1Crane standing position 5Radius line at placement 2Outrigger location6Tail swing radius line and clearance 3Centre of rotation 7Barricading/exclusion measures to prevent unauthorised access to lift zone 4Radius line at pickup Prepared by Signature Date Crane Elevation View - DiagramProject DetailsTask Description Work order number Sketch the load and mark the following: 1Crane standing position 4Boom length and angle at placement 2Centre of rotation6Other clearances 3Boom Length and angle pick up Prepared by Signature Date Rigging/Slinging – Diagram Project DetailsTask Description Work order number Sketch the load and mark the following: 1Nominated lift points 4Load sharing calculation 2Weight at each lift point 6Rigging arrangements 3Centre of gravity Prepared by Signature Date Rigging Slinging Equipment Checklist Project DetailsTask Description Work order number ChainsLift Point No.Diam.LengthS.W.L.InspectedLoad ShareDetailsSlingsLift Point No.Diam.LengthS.W.L.InspectedLoad ShareDetailsShacklesLift Point No.SizeS.W.L.InspectedLoad ShareDetailsOtherLift Point No.DescriptionS.W.L.InspectedLoad ShareDetailsPrepared by Signature Date Planning Process checklist FORMCHECKBOX Is access to lifting site is suitable for cranes and transport vehicles? FORMCHECKBOX Have weather conditions been assessed (maximum wind speed, rain, light, potential storms) and deemed suitable for lifting operation to be carried out? FORMCHECKBOX Is the crane(s) standing and working area is level, compacted and suitable for assembly? FORMCHECKBOX Has outrigger packing been identified and prepared to suit ground conditions e.g. Swamp Pads FORMCHECKBOX Has an adequate and suitable area been identified to unload, assemble, handle and store the load? FORMCHECKBOX Have all overhead obstructions, power wires, structures been identified and controlled e.g. Vicinity Permit FORMCHECKBOX Have underground obstructions, pipes, drains, manholes, been considered? FORMCHECKBOX Have all permits, authorities, etc. been identified and organized e.g. Working at Heights? FORMCHECKBOX Are barriers, barricades, signage, warning lights, etc. identified and available? FORMCHECKBOX Have scaffold, ladders, access platforms to all work areas been identified and prepared? FORMCHECKBOX Has a Communication Plan and Handover procedure been established and communicated? FORMCHECKBOX Have clearances for tail swing, boom operation and load movement been confirmed? FORMCHECKBOX Has all appropriate Personal Protective Equipment (PPE) been identified and available? FORMCHECKBOX Have all hazards been identified and control measures prepared (Risk Assessment / JSA)? FORMCHECKBOX Has all the necessary information and instruction is given to all persons involved (Pre-start Talk / JSA)?Prepared by Signature Date Operational Progress checklist Personnel FORMCHECKBOX On arrival at site all personnel are briefed and delegated particular tasks. FORMCHECKBOX The site area is cleared of all persons and equipment not involved. FORMCHECKBOX Barricades, signage, warning devices installed. FORMCHECKBOX Access to work areas installed – P.P.E. observed. FORMCHECKBOX Control measures applied to hazardous areas or situations.Cranes FORMCHECKBOX Crane/s positioned in accordance with plan, radius and S.W.L. confirmed. FORMCHECKBOX Outrigger packing positioned, outrigger beams extended, outrigger jacks extended. FORMCHECKBOX Crane jacked level, locking pins and devices fitted as per crane manual. FORMCHECKBOX Boom assembled or extended to required length, pins, wedges, safety devices, etc. fitted. FORMCHECKBOX Counterweight fitted, hooks reeved, bolts, pins, wedges, safety devices, etc. fitted. FORMCHECKBOX Boom erected, brakes, pawls, lock outs, weigh gauges, etc. tested FORMCHECKBOX Are the wind conditions acceptable? FORMCHECKBOX Tail swing and boom clearances confirmed. FORMCHECKBOX Communication system tested and confirmed working.Load FORMCHECKBOX Item is positioned or assembled, supported and braced, in a safe stable manner. FORMCHECKBOX Rigging / Slinging is fitted, protection for gear installed as per plan. FORMCHECKBOX Load is lifted clear of ground, slinging checked, outriggers checked. FORMCHECKBOX Observance for hazards is made and confirmation to proceed is given. FORMCHECKBOX Will the load be the minimum height above structure or ground? FORMCHECKBOX Load is lifted and placed in final position and safely secured. FORMCHECKBOX Rigging / Slinging equipment disconnected and lowered to ground.Move Out / De-Mobilisation FORMCHECKBOX All equipment is safely disassembled, stowed, loaded and tied on transport. FORMCHECKBOX Cranes are prepared for travel in accordance with manuals and permits. FORMCHECKBOX Inspection made to ensure no hazards remain as a result of activity. FORMCHECKBOX All personnel and equipment depart from site in a safe, orderly manner.Prepared by Signature Date ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download