ISO/TC 67/SC 4 Work Programme - continuously maintained ...



2011-04-15

Secretariat: ANSI (Administered by API)

Chairman: Austin Freeman (austin.freeman@)

Halliburton

2601 Beltline Road

Carrollton, Texas 75006

USA

Tel: + 1 972 418-3982

Fax: + 1 972 418-4409

Email: austin.freeman@

Secretary: Ed Baniak (baniake@)

American Petroleum Institute

1220 L Street NW

Washington, DC 20005

USA

Tel: + 1 202 682-8135

Fax: + 1 202 962-4797

Email: baniake@

Organizational Structure

The organizational structure of ISO/TC 67/SC 4 is as follows:

Workgroup Secretariat Convenor

WG 1 Drilling equipment ANSI (Mr. E. Simon)

eric.simon@

WG 2 Drilling well control equipment AFNOR (Mr. M. Grépinet)

michel.grepinet@wanadoo.fr

WG 3 Wellhead and Christmas tree equipment NEN (Mr. R. Langereis)

Ries.Langereis@c-a-

WG 4 Production equipment NEN (Mr. E. Dijkhuis)

edykhuis@ziggo.nl

WG 6 Subsea equipment SN (Mr. J.H. Neuenkirchen)

JHN@

KEY:

Workgroup 1 – Drilling Equipment Eric Simon, Convenor (eric.simon@)

|10407 |1993 |Drilling and production equipment - Drill |API RP 7G | CEN/TC 12 | | |

| | |stem design and operating limits |WI 4 | | |

|10407-2 |2008 |Rotary drilling equipment - Part 2: |API RP 7G-2 | CEN/TC | | |

| | |Inspection and classification of drill stem |12 WI 93 | | |

| | |elements | | | |

|10424-2 |2007 |Rotary drilling equipment - Part 2: Threading|API Spec 7-2 | CEN/TC |NWI for revision of document closed 2010-10-28. Document under revision |Tony Collins TonyCollins@ |

| | |and gauging of rotary shouldered threaded |12 WI 122 | | |

| | |connections | | | |

|13534 |2000 |Drilling and production equipment | API RP 8B | CEN/TC 12|DIS ballot circulated 2008-02-28, closed 2008-07-23 SC4 Resolution 20 (Delft, |Alf Aker |

| | |-Inspection, maintenance, repair and |WI 35 |2009). ISO/TC 67/SC 4 Chairman to follow up with the WG1 convenor to action the|alf.henry.aker@ |

| | |remanufacture of hoisting equipment | |three ISO standards that are currently on the ISO warning list: ISO DIS 13534, | |

| | | | |ISO DIS 13535 and ISO NP10407-1. Work restarted Feb 2010 | |

|13535 |2000 |Drilling and production equipment - Hoisting | API Spec 8C | CEN/TC |DIS Ballot circulated 2008-02-24, closed 2008-07-23 SC4 Resolution 20 (Delft, |Alf Aker |

| | |equipment |12 WI 36 |2009). ISO/TC 67/SC 4 Chairman to follow up with the WG1 convenor to action the|alf.henry.aker@ |

| | | | |three ISO standards that are currently on the ISO warning list: ISO DIS 13534, | |

| | | | |ISO DIS 13535 and ISO NP10407-1. Work restarted Feb 2010 | |

|13626 |2003 |Drilling and production equipment - |API Spec 4F | CEN/TC | | |

| | |Specification for drilling and well-servicing|12 WI 51 | | |

| | |structures | | | |

|13533 |2001 |Drilling and production equipment - Drill |API Spec 16A | CEN/TC | | |

| | |through equipment |12 WI 39 | | |

|22830 |NEW |Drilling and production equipment – Control |API Spec 16D |NWI (N414) closed 2009-03-18 to reinstate project as CD. N435 Summary issued |Brian Wright |

| | |systems for drilling well control equipment | |2009-06-12 TMB Approval Vote 2010-03-26. CD Ballot closed 2010-07-09. Document|bwright@ |

| | |and diverter systems | |set to Stage 0.0 pending outcome of work from API mirror group. |Ph: 337 - 369 - 3737 |

Workgroup 3 – Wellhead and Christmas Tree Equipment Ries Langereis, Convenor (Ries.Langereis@c-a-)

|10423 |2009 |Drilling and production equipment -Wellhead |API Spec 6A | CEN/TC | | |

| | |and Christmas tree equipment |12 WI 158 | | |

|10432 |2004 |Downhole equipment - Subsurface safety valve|API Spec 14A | CEN/TC |NWI (N458) for Revisions closed 2010-06-11. Under Revision |Darren Bane |

| | |equipment |12 WI 139 | |darren.bane@ Office: |

| | | | | |918-259-2106 |

| | | | | |Cell: 918-232-8781 |

|14310 |2008 |Downhole equipment - Packers and bridge |API 11D1 | CEN/TC 12 WI| | |

| | |plugs |95 | | |

|15136-1 |2009 |Progressing cavity pump systems for |CEN/TC 12 WI 80 | | |

| | |artificial lift -- Part 1: Pumps | | | |

|15551 |NEW |Electric submersible pumps | |NWIP 442 Closed 2010-01-07. Document in development. |Shauna Noonan |

| | | | | |Shauna.G.Noonan |

| | | | | |@ |

|16070 |2005 |Downhole equipment - Lock mandrels and |API 14L | CEN/TC 12 WI | | |

| | |landing nipples |162 | | |

|17078-1 |2004 |Drilling and production equipment - Part 1: |API Spec 19G1 | CEN/TC | | |

| | |Side-pocket mandrels |12 WI 117 | | |

|17078-3 |2009 |Drilling and production equipment – Part 3: |API RP 19G3 | | |

| | |Running tools, pulling tools and kick-over |Proposed | | |

| | |tools and latches for side-pocket mandrels | | | |

| | | |CEN/TC 12 119 | | |

|28781 |2010 |Downhole equipment - Subsurface tubing |  | |David McCalvin |

| | |mounted formation barrier valves and related| | |david@ |

| | |equipment | | | |

|13628-1 |2010 |Design and operation of subsea production |API Spec 17A | CEN/TC | |André Maerli |

|AMENDMENT 1 | |systems - Part 1: General requirements and |12 WI 141 | |andmar@ |

| | |recommendations- Amendment 1 | | | |

|13628-7 |2005 |Design and operation of subsea production |API RP 17G |NWI (N416) Submitted for next revision closed 2009-04-29. Will consider |Anthony Muff |

| | |systems - Part 7: Workover/Completion riser | |intervention control issues in next revision. N437 Summary issued 2009-06-12. |anthony.muff@fks. |

| | |systems | |Publication Target Date 2010-12-31 | |

|13628-8 |2002 |Design and operation of subsea production |API RP 17H |Will replace 13628-8 and 13628-9 when published. New Project Approved 2007-05-10.|Eric Luzi |

| | |systems - Part 8: Remotely Operated Vehicles| |SC4 Resolution 13 (Delft, 2009): ISO/TC 67/SC 4 requests WG6 submit 13628-13 |luzi@ |

| | |(ROV) interfaces on subsea production | |directly to DIS. 6) SC4 Resolution 14 (Delft, 2009): ISO/TC 67/SC 4 requests | |

| | |systems | |that ISO CS extend the current timeline by 1 year for 13628-12 and 13628-13 due |Charles White |

| | |(Title change on publication of next | |to the global business needs for these products. |cwhite@doris- |

| | |edition: Design and operation of subsea | |Resolution Required to reassign Part 13 as Part 8 (Revision) | |

| | |production systems - Part 13: Remotely | | | |

| | |operated tools and interfaces on subsea | |DIS ballot closed 2011-04-11. In comment resolution | |

| | |production systems) | | | |

|13628-8 |2005 |Design and operation of subsea production |API RP 17H |NOTE: | |

|TECH CORR 1 | |systems - Part 8: Remotely Operated Vehicles| |DOCUMENT TO BE WITHDRAWN WHEN NEXT EDITION OF 13628-8 IS PUBLISHED | |

| | |(ROV) interfaces on subsea production | | | |

| | |systems | | | |

|13628-14 |NEW |Design and operation of subsea production |API RP 17O |API RP 17O, 1st Edition was published in October 2009. NWIP 461 closed |Chris Curran Christopher.Curran@ |

| | |systems – Part 14: Subsea high integrity | |2010-06-19 for the Direct-to-DIS issuance of this document as Part 14 of the | |

| | |pressure protection systems (HIPPS) | |subsea documents. In development. | |

|13628-15 |NEW |Design and operation or subsea production |API RP 17P (Prop’d) |DIS Ballot closed 2010-03-08 Comments resolved. FDIS submitted to ISO for |Charles White |

| | |systems - Part 15: Subsea structures and | |processing. Waiting for ballot to open. |cwhite@doris- |

| | |manifolds | | | |

|13628-16 |NEW |Design and operation of subsea production |API Spec 17L1 (Prop’d) |DIS Ballot closed 2010-09-01. Comments in resolution |Krassimir Doynov |

| | |systems – Part 16: Specification for | | |krassimir.doynov@ |

| | |flexible pipe ancillary equipment | | | |

|13628-17 |NEW |Design and operation of subsea production |API RP 17L2 (Prop’d) |DIS Ballot closed 2010-09-01. Comments in resolution |Krassimir Doynov |

| | |systems - Part 17: Recommended practice for | | |krassimir.doynov@ |

| | |flexible pipe ancillary equipment | | | |

-----------------------

Shaded Areas Below – Projects Currently Completed (No Activity)

Non-shaded Areas Below – Projects Currently Active

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download