Lakewood Property Owners Association – Making Our ...



PROCEDURES FOR MOBILE HOME APPLICATION$200.00 SINGLE WIDE ONE TIME FEE$400.00 DOUBLE WIDE ONE TIME FEEUnit/Lot:ALL FEES and/or Maintenance dues & Road Assessment must be paid current before application can be approved byACC Director or Committee. Request and approvals must comply with the Deed Restrictions.Office Mgr. initialsProperty must be surveyed, and a copy of Plat of Survey filed in Cherokee County must be attached to form submitted for Move-in.MUST furnish copy of agreement (ON-SITE SEWAGE PERMIT APPLICATION & ON-SITE EVALUATION FORM) to install septic system to meet Cherokee County Environmental Service and Texas Rules and Regulations for septic systems and copy of permits issued. Submit with form.Furnish copy of application from Southern Utilities for water hookup. Submit with form.Furnish copy of application from Cherokee Electric for electricity. Submit with formMust furnish photos with unobstructed view of front/back, and both ends. NO DAMAGED, WRECKED OR DILAPIDATED homes will be permitted. All mobiles homes moved into subdivision must be NEW. Must show distance of each property line of location of home. Any additional driveways, fence, etc. Submit with the form.Property Owner is RESPONSIBLE for damage done to the roads and utilities. A one-time fee of two hundred dollars ($200.00) for a Single wide and Four hundred dollars ($400.00) for a Double wide mobile home will be payable and due at the time of application.Furnish Warranty Deed with this form. Submit with form.Culvert must be installed, unless ACC states culvert is not necessary in writing and attached to form.The Mobile home cannot be occupied temporarily or permanently, until all utilities and Septic system is installed. And Final Inspection by A.C.C. Member will have sixty day(s) to complete.There will be a fifty dollar ($50.00) a day penalty if paperwork is not in office within fifteen days (15).Units 2,3,4,5, & 6 are Site built or Mobile homes combination lots.The A-C.C. can only approve improvements that are following the existing Covenants and Restrictions. All Fees, dues, and assessments must be current and paid before Committee can approve any plans. An approval granted on improvements not meeting the requirements of the Restricted Covenants will not serve as a waiver of the Restricted Covenants and Restrictions. The property owner is liable for any damage to Lakewood POA roads, or facilities which occur due to improvements made to Members property.An On-Site inspection must be made by the property owner and an ACC Committee member prior to approval of Mobile home is moved in.You must give at least five (5) days' notice to ACC before when construction will begin. The entry gate will be opened by appointment ONLY and only during business hours, Monday — Thursday 9:00 am — 3:00 pm.Regardless of the distance traveled, FINAL inspections for approval will be at the front gate before entry will be permitted.You must give at least five (5) days' notice to ACC before Mobile home is to be moved in. The entry gate will be opened by appointment ONLY and only during business hours, Monday — Thursday 9:00 am — 3 pm.NO WEEKENDS OR HOLIDAYS! If a mobile home is bought into subdivision after hours there will be a penalty charge of $100.00.I have read the above procedures and will furnish all documents to the Lakewood POA office in a timely manner.Member signature:Date:

Member File CopyLAKEWOOD ARCHITUREAL CONTROL COMMITTEE MOBILE HOME APPLICATION$200.00 SINGLE WIDE ONE TIME FEE/$400.OO DOUBLE WIDE ONE TIME FEEPROPERTY OWNER(S) NAME:UNIT/LOT(S): DATE:

ADDRESS:CITY:STATE:PHONE NO:MOBILE HOME DESCRIPTIONMAKE:SERIAL NO:COLOR:YEAR:SIZE:NEW/USED?.METAL/WOOD:TYPE OF EXTERIOR:TYPE OF SKIRTING:TOTAL BEDROOMS:TOTAL BATHS:DELIVERY DATE:WILL HOME BE HOMESTEADED? YES NOALL DOCUMENTS MUST BE ATTACHED TO APPLICATION TO BE APPROVED BY ACC COMMITTEEALL FEES and/or Maintenance dues & Road Assessment must be paid current before application can be approved by ACCDirector or Committee. Request and approvals must comply with the Deed Restrictions.Office Mgr. initialsProperty must be surveyed, and a copy of Plat of Survey filed in Cherokee County must be attached to form submitted for Move-in.3.Furnish copy of agreement (ON-SITE SEWAGE PERMIT & ON-SITE EVALUATION FORM) to install septic system to meetCherokee County Environmental Service & Texas Rules & Regulations for septic systems & copy of permits issued. Submit with form.Furnish copy of application from Southern Utilities for water hookup. Submit with form.Furnish copy of application from Cherokee Electric for electricity. Submit with form7010401028706.Must furnish photos with unobstructed view of front/back, and both ends. NO DAMAGED, WRECKED OR DILAPIDATED homes will be permitted. All mobiles homes moved into subdivision must be NEW.Must show distance of each property line of location of home. Any additional driveways, fence, etc. Submit with the form.8.Property Owner is RESPONSIBLE for damage done to the roads and utilities. A one-time fee of two hundred dollars ($200.00) for a Single wide and Four hundred dollars ($400.00) for a Double wide mobile home will be payable and due at the time of application.9.Furnish Warranty Deed with this form. Submit with form.10.Culvert must be installed, unless ACC states culvert is not necessary in writing and attached to form.71018410314111.The Mobile home cannot be occupied temporarily or permanently, until all utilities and Septic system is installed. And Final Inspection by A.C.C. Member will have sixty day(s) to complete.12.There will be a fifty dollar ($50.00) a day penalty if paperwork is not in office within fifteen days (15).Units 2,3,4,5, & 6 are Site built or Mobile homes combination lots. The A.C.C. can only approve improvements that are following the existing Covenants and Restrictions. All Fees, dues, and assessments must be current and paid before Committee can approve any plans. An approval granted on improvements not meeting the requirements of the Restricted Covenants will not serve as a waiver of the Restricted Covenants and Restrictions. The property owner is liable for any damage to Lakewood POA roads, or facilities which occur due to improvements made to Members property.An On-Site inspection must be made by the property owner and an ACC Committee member prior to approval of Mobile home is moved in. Regardless of the distance traveled, FINAL inspections for approval will be at the front gate before entry will be permitted.You must give at least five (5) days' notice to ACC before when construction will begin. The entry gate will be opened by appointment ONLY and only during business hours, Monday — Thursday 9:00 am — 3:00 pm.You must give at least five (5) days' notice to ACC before Mobile home is to be moved in. The entry gate wili be opened by appointment ONLY and only during business hours, Monday —Thursday 9:00 am —3 pm. NO WEEKENDS OR HOLIDAYS! If a mobile home is bought into subdivision after hours there will be a penalty charge of $100.00.I have read the above procedures and wili furnish all documents to the Lakewood POA office in a timely manner.PROPERTY OWNER SIGNATUREDATEACC DIRECTOR/COMMITTEEDATEON-SITE INSPECTION APPROVED:ON-SITE INSPECTION NOT APPROVED:PAID FEE: $LAKEWOOD ARCHdTUREAL CONTROL COMMITTEE MOBILE HOME APPLICATION$200.00 SINGLE WIDE ONE TIME FEE/$400.OO DOUBLE WIDE ONE TOME FEEMEMBER MOBILE HOME MOVE IN CHECK LISTALL DOCUMENTS MUST BE ATTACHED TO APPLICATION TO BE APPROVED BY ACC COMMITTEEALL FEES and/or Maintenance dues & Road Assessment must be paid current before application can be approved by ACC Director or Committee. Request and approvals must comply with the Deed Restrictions.Office Mgr. initials676656110194Property must be surveyed, and a copy of Plat of Survey filed in Cherokee County must be attached to form submitted for Move-in.Furnish copy of agreement (ON-SITE SEWAGE PERMIT & ON-SITE EVALUATION FORM) to install septic system to meet Cherokee County Environmental Service & Texas Rules & Regulations for septic systems & copy of permits issued. Submit with form.Furnish copy of application from Southern Utilities for water hookup. Submit with form.Furnish copy of application from Cherokee Electric for electricity. Submit with form Must furnish photos with unobstructed view of front/back, and both ends. NO DAMAGED, WRECKED OR DILAPIDATED homes will be permitted. All mobiles homes moved into subdivision must be NEW.Must show distance of each property line of location of home. Any additional driveways, fence, etc. Submit with the form.Property Owner is RESPONSIBLE for damage done to the roads and utilities. A one-time fee of two hundred dollars ($200.00) for a Single wide and Four hundred dollars ($400.00) for a Double wide mobile home will be payable and due at the time of application. Furnish Warranty Deed with this form. Submit with form.Culvert must be installed, unless ACC states culvert is not necessary in writing and attached to form.The Mobile home cannot be occupied temporarily or permanently, until all utilities and Septic system is installed. And Final Inspection by A.C.C. Member will have sixty day(s) to complete.There will be a fifty dollar ($50.00) a day penalty if paperwork is not in office within fifteen days (15).Units 2,3,4,5, & 6 are Site built or Mobile homes combination lots. The A.C.C. can only approve improvements that are following the existing Covenants and Restrictions. All Fees, dues, and assessments must be current and paid before Committee can approve any plans. An approval granted on improvements not meeting the requirements of the Restricted Covenants will not serve as a waiver of the Restricted Covenants and Restrictions. The property owner is liable for any damage to Lakewood POA roacls, or facilities which occur due to improvements made to Members property.An On-Site inspection must be made by the property owner and an ACC Committee member prior to approval of Mobile home is moved in. Regardless of the distance traveled, FINAL inspections for approval will be at the front gate before entry will be permitted.You must give at least five (5) days' notice to ACC before when construction will begin. The entry gate will be opened by appointment ONLY and only during business hours, Monday — Thursday 9:00 am — 3:00 pm.You must give at least five (5) days' notice to ACC before Mobile home is to be moved in. The entry gate will be opened by appointment ONLY and only during business hours, Monday —Thursday 9:00 am — 3 pm. NO WEEKENDS OR HOLIDAYS! If amobile home is bought into subdivision after hours there will be a penalty charge of $100.00.Please make sure all forms are turned into Lakewood POA office in a timely manner.Thank you,Lakewood POA A.C.C.Site drawingDu-axtv or Storage shedDraw location of drivewayCompass North, adjacent streets, property lines, property dimensions, locations of buiüding, easements, water lines, and any other structures known. 4. Location of natural, constructed, or proposed drainage ways, (culverts, driveways, etcJ2194569579719

3297936176838UNIT:LOT(S):LOT SIZE:l/We are liable for any damage to the Subdivisions roads. Water system, facilities, etc., which may occur as a result of my, or anyone in my employment of any contractor during the improvement of my lot. That all improvements and/or buildings must be approved by the ACC before construction begins.250545691468DateProperty Owner signature

ACC Member/Committee Member signatureDate5026152-19024County Baviron=ental Servüce21641 Sorrell DriveTX 757899034424sg62621289134576304801609832Mai)jqg?bone Site O±er

Mai)jqg

?bone

Site

O±er

601065687839500484779S.-he CONSTRUCT.eE9ECE?EüSIA&ZE00ge I (Soil & Site Evaluation)Date Performed:0? a-ty Owner:

ite Location:Proposed Excavation Depth:EQUREMENTS?.Soil Boring Number:Depth(Feet)Texture ClassGravel Analysis(If Applicable)Drainage (Mottles/Water TableRestrictive HorizonObservations1 FT.3 FT.4 FT.090766475273040937544101893382At least two soil excavations must?be performed on the site, at opposite ends of the proposed disposal area. Locations of soil orings or dug pits must be shown on the site drawing. For subsurface disposal , soil evaluations must be performed to a depth of at :ast two feet below the proposed disposal field excavation depth. For surface disposal, the surface horizon must be evaluated. )escribe each soil horizon and identify any restrictive features on this form. Indicate depths where features appear.FEATURES OF SITE AREA657148817074060380881798876050280515269resence of 100 year flood zoneYes resence of upper water shedYes resence of adj acent ponds, streams, water impoundments Yes listing 01' proposed water well in nearby area (within 150 feet) Yes round Slopecertify that the findings of this report are based on my field observations and are accurate to the best of mv bility.(Signature of person performing evaluation) (Date) Registration Number and ype orlTL # PA3/2-2004-Revised-Fina1V .11COUNTY OFTATE OF TEXASCERTIFICATION OF OSSF EQTJIRTNG MAINTENANCEccording to Texas Commission on Environmental Quality Rules for On-Site Sewage Facilities, this document is filed in Deed Records of County Texas.1.he Texas Health and Safety Code, Chapter 366 authorizes the Texas Commission on Environmental Quality (TCEQ) tc regulate n-site sewage facilities (OSSFs). Additionally, the Texas Water Code (TWC), s; 5.012 and S 5.013, gives the TCEQ primary sponsibility ?for implementing the laws of the State of Texas relating to water and adopting rules necessary to carry out its powers nd duties under the TWC. The TCEQ under the authority of the TWC and the Texas Health and Safety Code, requires owners to rovide notice to the public that certain types of OSSFs are located on specific pieces of property. To achieve this notice: the TCEQ niL1ires a deed recording. Additionally, the owner mUSt provide proof of the recording to the OSSF permitting authority. This deed ertification is not a representation or warranty by the TCEQ or the Permitting Authority of the suitability of this OSSF: nor does it onstitate any guarantee by the TCEQ or the Permitting Authority that the appropriate OSSF was installed. 11.kn OSSF requiring maintenance contract, according to 30 Texas Administrative Code S285.91(12) will be installed on the property lescribed as (insen legal description):Block

Block

Act-eaeeSurvey NameAbstractDeed VolumePageTractSectionGEO Number:The property is ownecl by (insert owner's full name):

09302267

05545993

06722877

07475962

08168068

This OSSF nnust be covered by a continuous maintenance contract. All maintenance on this OSSF must be performed by an approved maintenance company, and a signed maintenance contract must be submitted to the Permitting Authority within 30 days after the property has been transferred.The owner will, upon any sale or transfer of the above-described property, request a transfer of. the permit for the OSSF to the buyer or new owner. A copy of the planning materials for the OSSF can be obtained from the Permitting AuthorityWITNESS BY I-LAND(S) ON THIS DAY OF(Owner signature(s))TO AND SUBSCRIBED BEFORE ME ON THISDAY OFI otary Public, State of Texasotaryl s Printed NanneIy Col-nmission Expires:orm PA5/2-2004-?vised-Final ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download