LIST OF DRAWINGS (MULTI CONTRACT) [FJS:ack]
NOTE: THIS IS A COMMON DOCUMENT ON A MULTI-CONTRACT PROJECT.
LIST OF DRAWINGS
USE ARTICLE BELOW IF A TITLE SHEET (WITH THE LIST OF DRAWINGS) IS INCLUDED WITH THE SET OF DRAWINGS.
1.01 DRAWINGS
A. The Contract Drawings, which accompany this Project Manual and form a part of the Contract Documents, are listed on the Title Sheet of the Drawings.
B. The drawings for related contracts are listed on the Title Sheet for reference only. Examine the drawings for related contracts to ascertain the relationship of the Work to the related contracts.
DELETE ARTICLE ABOVE AND USE ARTICLE BELOW IF A TITLE SHEET (WITH THE LIST OF DRAWINGS) IS NOT INCLUDED WITH THE SET OF DRAWINGS.
1.01 DRAWINGS
A. The Contract Drawings, which accompany this Project Manual and form a part of the Contract Documents, are listed by number below under the appropriate heading.
B. The drawings for related contracts are listed under the other contract designations for reference only. Examine the drawings for related contracts to ascertain the relationship of the Work to the related contracts.
THE SPECIFICATIONS WRITER FOR THE CONTROLLING CONTRACT MUST CIRCULATE THIS TO THE OTHER DISCIPLINES FOR EDITING. FOLLOW THE GUIDELINES SET FORTH IN CHAPTER 5.4 OF THE DESIGN PROCEDURES MANUAL FOR NAMING DRAWINGS.
|CONSTRUCTION |HVAC |PLUMBING |ELECTRICAL |
|WORK |WORK |WORK |WORK |
BOUND SEPARATELY:
|______ |______ |______ |______ |
|______ |______ |______ |______ |
|______ |______ |______ |______ |
|______ |______ |______ |______ |
|______ |______ |______ |______ |
|______ |______ |______ |______ |
|______ |______ |______ |______ |
|______ |______ |______ |______ |
|______ |______ |______ |______ |
|______ |______ |______ |______ |
|______ |______ |______ |______ |
LIST 8-1/2 x 11 DRAWINGS BOUND IN THE PROJECT MANUAL BELOW.
BOUND HEREIN:
|______ |______ |______ |______ |
|______ |______ |______ |______ |
|______ |______ |______ |______ |
C. OTHER REFERENCE DRAWINGS: The Drawings listed by number below were prepared for other projects and are furnished only to show related conditions. Examine the Reference Drawings to ascertain the relationship of the Work to the indicated conditions.
BOUND SEPARATELY:
_____, Project No. ______
_____, Project No. ______
_____, Project No. ______
END OF LIST
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
- substitute teacher packet scholastic
- section 07 22 00 roof and deck insulation
- elements of the short story notes auburn school district
- writing my recovery story worksheet
- southwestern academy you belong san marino ca and
- list of drawings multi contract fjs ack
- training and education implementation plan
- on line writer s revision tool
- microsoft word apa sample paper with
- grantham university
Related searches
- python list sort lambda multi key
- list of list in java
- list of c list actors
- list of list in python
- sort a list of list python
- the hrning moment diagram of a multi cylinder engine is drawn with a scale of 1
- list of government contract companies
- list of list java
- convert list of list to numpy array
- transpose list of list python
- list of a list python
- create list of list python