Building Condition Assessment Survey 2019 - 2020
Architectural Inspection
Q053
Asset:
I.S. 53 - QUEENS, 10-45 NAMEOKE STREET, New York, 11691
Inspection Id Inspection Type
Time In
Last Edited
SA : Q053 AA : Q053
Asset Data
Architectural - Senior Architectural - Associate
2020-02-18 8:04 AM 2020-02-18 9:00 AM
2020-03-02 4:14 PM 2020-02-18 2:47 PM
Question
Answer
Was the building fully accessible for inspection Inspection Access Comment
Principal(s) Information
No
Areaway, Security Lights ( Due to construction Fencing and Sidewalk Bridge.) Locker Room, Locker Room Shower, Science Prep Room 279A (Storage.)
Principal Name Organization Did you meet with this Principal? Did this Principal provide feedback?
Zoanne Wilkins I.S. 53 Brian Piccolo School - Queens No No
Principal Name Organization Did you meet with this Principal? Did this Principal provide feedback? Summary of Principal's Feedback
Doris Lee Village Academy - Queens No Yes A Principal questionnaire form was returned with the following comment: Deteriorated heater covers need to be replaced.
Principal Name Organization Did you meet with this Principal? Did this Principal provide feedback? Custodian Fireman Building Square Footage Comments on the Area Comments on the Stories (Floors) plus Basements Comments on the Number of Classrooms Comments on the Year Built Student Population Staff Population Weather
Facade Photo
Jose Rosario Success Academy - Queens No No Raymond Velez Daniel Hourihan 164,000 None 4+B 78 1972 890 157 Fair
PB/A&W
Corner of Dinsmore Avenue and Nameoke Street - South View Page 1 of 39
Print Date: 9/13/2020
Architectural Inspection
Main Entrance Photo
NYC Department of Education Building Condition Assessment Survey 2019 - 2020
Street - South View
Q053
Roof Photo
Facade A - Nameoke Street
Have any Systems/Major Building Components been upgraded? PB/A&W
Roof 1 - East View
Yes Systems:
Year: Systems: Year: Systems: Year: Systems: Year: Systems:
Year: Systems:
Major Construction work underway, including repair and/or replacement of : Exterior Walls/Curtain Walls, Parapets, Plaza Deck, Leaders/Gutters/Downspouts, Roof Barriers, Roofing, Bulkhead, Skylight, Exterior Stairs/Ramps/Railings, Windows and Window Guards. Foundation Walls an Slabs Waterproofing.
Under construction.
Girls Locker Room converted to Exercise Room. Science Room 208 Upgraded.
2018
All Toilet Room renovations 1st - 4th Floors.
2017
Courtyard repairs to Parapets, Coping and Flashing. Roof 4 Railing Replacement.
2013
New Student Toilet Rooms in Cafeteria and 3rd Floor. Partial Coping Replacement. New Window Guards. New Gymnasium Floor.
2008
New Schoolyard.
Page 2 of 39
Print Date: 9/13/2020
NYC Department of Education
Building Condition Assessment Survey 2019 - 2020
Architectural Inspection
Have there been any New Building Additions? Tandem Schools?
Year: No No
2007
Leased Space?
No
Priority Condition
Priority Condition Exist Last Year? Yes
Yes
Priority Category Potential Falling Debris
Tripping Hazard
Condition Description
Deteriorated spalled concrete floor slab with exposed reinforcement is a potential falling debris hazard (on equipment).
Heaving Safety Surfacing is a potential tripping hazard.
Component Affected
INTERIOR | STRUCTURAL | FLOOR STRUCTURE
SITE | PLAYGROUN DS | Safety Surfacing
Location Description
Basement Room B13 Science Lab Acid Tank Storage Room.
Schoolyard
Person(s) Notified
Person(s) Title
Daniel Hourihan Fireman
Daniel Hourihan Fireman
Q053 PhotoImage
Structural Engineer Required
Structural Condition Type
Condition Description
Component Affected
Location Description
Person(s) Notified
No condition recorded
Accessibility
Accessibility Status Question
Is the primary or secondary entrance on an accessible route? Is the building a multi-story building? Are all floors of the building accessible through compliant means? Accessible classrooms exists on each floor? Boys and Girls or Unisex accessible toilets exist on at least every other floor? If the following spaces exist, are they ALL accessible? Art Room, Auditorium, Cafeteria, Computer, Gymnasiums, Library, Multipurpose Room, Science Labs
Person(s) Title
Response Yes Yes Yes Yes Yes Yes
Physical Breakdown Structure
Exists Required Complies Deficiency
FUNCTIONAL ACCESSIBILITY Exterior Routes Exterior Entrances & Exits Exterior H/C Lifts Exterior Ramps and Railings
Interior Routes Corridor and Lobby H/C Lifts Interior Corridor Doors and Hardware Interior Corridors and Lobbies Interior Elevators Interior Lobby Doors and Hardware Interior Ramps
PB/A&W
Yes
No
Yes
Yes
Yes
No
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Page 3 of 39
PhotoImage
Audio Fire Induction Alarm System Strobe
Print Date: 9/13/2020
Architectural Inspection
Physical Breakdown Structure
NYC Department of Education Building Condition Assessment Survey 2019 - 2020
Exists Required Complies Deficiency
Rooms & Spaces Art Rooms Auditorium Cafeteria Classrooms Computer Rooms Gymnasium Library Main Office
Multi-purpose Room Nurse's Room Pool Science Lab Toilet Rooms (Boys) Toilet Rooms (Girls) Toilet Rooms (Staff)
Room 406
Yes
3rd Floor
Yes
1st Floor
Yes
1st - 4th Floor
Yes
No
1st Floor
Yes
Room 347
Yes
Room 109 (I.S. 53 - Queens), Room 311 Yes ( Success Academy), Room 447B (Village Academy)
No
Room 113
Yes
No
Rooms 408, 279
Yes
1st - 4th Floors
Yes
1st - 4th Floors
Yes
1st - 4th Floors
Yes
Yes
No
H/C Lift Inoperable
Yes
Yes
Yes Yes Yes
Yes
Yes Yes Yes Yes
Q053
Audio Fire Induction Alarm System Strobe
Yes
Yes
Yes
Yes
Yes
Yes
Building Template
Inspection
Question Architectural
EXTERIOR AREAWAY Instance on AW1 Instance Quantity Instance Quantity Uom AWNINGS AND CANOPIES
PB/A&W
Response
Inspected Inspected Inaccessible 1 EACH Does not Exist
Page 4 of 39
Print Date: 9/13/2020
Architectural Inspection
Question EXTERIOR CHIMNEY COPING CORNICE DOORS DOORS AND FRAMES Condition Deficiency
Roof Plan reference
NYC Department of Education Building Condition Assessment Survey 2019 - 2020
Response
Q053
Under Construction Under Construction Does not Exist Inspected Inspected 5 - Poor METAL CLAD: DETERIORATED DOOR AND FRAME - MAJOR DETERIORATION
Deficiency Quantity Quantity Uom Potential Action Urgency of Action Purpose of Action Deficiency Photo1
Violations Deficiency
Roof Plan reference
7 EACH REPLACE PRIORITY 4 LEVEL 2
Facade A No violations recorded. METAL CLAD: DETERIORATED DOOR AND FRAME - MINOR DETERIORATION
PB/A&W
Deficiency Quantity Quantity Uom Potential Action Urgency of Action
2 EACH MAINTENANCE PRIORITY 3
Page 5 of 39
Print Date: 9/13/2020
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related searches
- nyc department of education salary
- nyc department of education website
- nyc department of education payroll
- nyc department of education benefits
- nyc department of education calendar
- nyc department of education jobs
- nyc department of education vendor
- nyc department of education paraprofessional
- nyc department of education form
- nyc department of education offices
- nyc department of education calendar 2019
- nyc department of education schedule