DETOUR NEED DETERMINATION REPORT - Ohio Department …



DETOUR INFORMATION REPORT Date Prepared: MMM-DD-YYYY

Prepared by: Joe Smith, ODOT

Design Information

Project: CCC-RRR-SS.SS PID #: XXXXXX Sale Date: MMM-DD-YYYY

Begin Construction Date: MMM-DD-YYYY Estimated Construction Cost: $xxx,xxx,xxx

Project Description: Brief project description goes here

Closure Location: Location description here

Current Traffic Data: ADT XXXXX Percentage Trucks XX%

Proposed Detour Route:

Official turn-by-turn directions of the posted detour around the closure point goes here

Estimated Additional Travel Time: xx minutes

(this can be estimated easily using Bing Maps)

Detour Map:

Construction Information (to be provided by Project Engineer)

Is the location as described above? Yes No ____________________________

Is the detour as described above? Yes No ____________________________

Date of Closure: _____________ Date of Reopening: _____________

Time of Closure: _____________ Time of Reopening: _____________

Duration of Closure: ____ Days

OTHER: ________________________________________________________________

_______________________________________________________________________

-----------------------

Add map of closure location and detour route.

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download