TEXAS LoanSTAR PROGRAM

Loan interest and measurement and verification costs had to be included in ESPC payback calculations. In 2012, clarification was made to the effect that all financing costs and the cost of Utility Assessment Reports (UARs), construction bonding, any owner’s costs, and monitoring costs (claimed in the loan application) had to be included in ... ................
................