Web1.eng.famu.fsu.edu



[pic][pic]

-----------------------

I-10 ESCAMBIA BAY BRIDGE REPLACEMENT

Pensacola, FL

Further Information

Tidewater Skanska, Inc.

809 South Military Highway

Virginia Beach, VA 23464

Phone 757 420 4140

Fax 757 420 3551

Owner

Florida Department of Transportation

Project Type

Bridge

Contract Value

$243,000,000.00

Completion

December 2007

The Project

The Project

The Project

Tidewater Skanska has secured a contract to design and construct two bridges in Florida. The contract is valued at (USD 243 million), of which Skanska's portion is 60 percent and Flatiron Constructors' is 40 percent. The customer is the Florida Department of Transportation.

The contract includes twin high-level bridges on the I-10 Interstate Highway across Escambia Bay in Pensacola, Florida. The total length of the bridges is about 4.2 kilometers (13,867 feet). The project includes demolition of the two existing bridges that are now being replaced.

The proposal developed by the Skanska-managed joint venture received the highest possible technical score by the Florida Department of Transportation.

Preparatory work for construction starts immediately and work is scheduled to be completed in 29 months.

[pic]

[pic]

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download