Port of Seattle – Terminal 115

Port of Seattle ? Terminal 115

Seattle, Washington

Client:

Port of Seattle Pier 66, PO Box 1209 Seattle, WA 98111

Client References:

Dave Soike Project Manager

Firm's Contract Price:

$60,000

SAI acquired all the necessary permits for dredging and disposal, prepared the bid documents, and assisted in construction management.

Project Highlights:

? Sediment sampling for PSSDA ? Permit acquisition: 404, Shoreline, Hydraulic permit ? Dredging and disposal analysis ? Engineering design ? Contract document preparation ? Bid evaluation

Firm's Responsibility:

SAI was the prime consultant for the sampling, design and analysis for the Port of Seattle, Terminal 115 dredging study. SAI prepared the sampling and analysis plan for sediment sampling and collection, in accordance with Puget Sound Dredge Disposal Analysis (PSDDA) guidelines. SAI also acquired all the necessary permits (COE 404, Shoreline Permits) for dredging and disposal. Ms. Sanders evaluated dredging and disposal methods, prepared bid documents and assisted as necessary in construction management.

The Port of Seattle ranked SAI highly for the ability to obtain permits under an expedited schedule. SAI also saved the Port thousands of dollars in PSSDA sampling by employing an innovative jet-coring technique.

Firm's Project Personnel:

Carol M. Sanders, Project Manager, Professional Engineer

................
................