Los Angeles Unified School District
San Diego Unified School District
Project Stabilization Agreement (PSA)
Pre-Job Conference Form
|General Contractor Information |
|Prime Contractor: Soltek Pacific Construction |
|Address: 2424 Congress Street, San Diego, CA. 92110 |
|Phone: 619-296-6247 |
|Fax: 619-296-7732 |
|Contractor’s License Number: 886641 |
|Project Information |Meeting Information |
|Project Name: F&I HVAC Systems, Region 2 Phase II (IDIQ) |Meeting Date:2/28/2017 |
|Contract Number: CZ-17-0568-29 |Meeting Time: 11am - 1pm |
|Contract Amount: $84,307,630.62 |Meeting Location: IBEW Training Center |
| |4675 Viewridge Avenue |
| |San Diego, CA. 92123 |
|Construction Start Date: 12/15/2016 | |
|Construction End Date: 12/14/2018 | |
|The Scope of Work to Be Performed |
| |
|Furnish and Install HVAC Systems |
|Equipment to Be Utilized on Job |
|Gradall, reach forklift, scissor lift, generator, kettle, light stands, hand tools, heat welder, crane, forklift, mixer, ladders, lifts, concrete |
|saws, service trucks, negative air machines, hepa vacuum, jackhammers, wall saws, skiploader, skidsteer, motorgrader, 10-12 ton & 3-5 ton double |
|drum rollers, paving machine, |
| |
| |
| |
| |
|Jobsite Information |
|Address: Varies locations |
|Phone: |Jobsite Labor Rep: N/A |
|Fax: |Jobsite Safety Rep: tbd |
|Project Manager: Mark Hofmann |Manpower to be Ordered By: Per subs |
|Job Superintendent: tbd | |
|Jobsite Scheduling Information |
|Number of Shifts:1st and 2nd |Start / Stop Times: Varies |
|Pay Day: monthly |Ending Day of Pay Period: Last day of the month |
|Jobsite Facilities |
|Location(s) of First Aid Facilities: Jobsite office trailer |
|Location(s) of Sanitary Facilities: On jobsite |
|Location(s) of Drinking Water Facilities: Jobsite office trailer |
| Description of Jobsite Parking: Will be determined at part of jobsite Safety Plan |
|Name of Selected Hospital: Will be determined as part of jobsite Safely Plan |
|Address: |
|Phone Number: |
|Manpower Estimates |
|Craft |Peak |Average |
|Boilermakers | | |
|Bricklayers | | |
|Carpenters |20 |10 |
|Cement Mason | | |
|Drywall Finishers |20 |10 |
|Electricians |40 |25 |
|Elevator Constructors | | |
|Fire Sprinkler Fitter | | |
|Floor Covers | | |
|Glaziers | | |
|Heat and Frost Insulators | | |
|Iron Workers |12 |6 |
|Laborers |18 |8 |
|Landscape, Irrigation, Underground and Specialty | | |
|Piping | | |
|Laborers’ International Union of N.A. Highway & | | |
|Street Stripers’ | | |
|Operating Engineering |4 |2 |
|Painters | | |
|Pipefitters | | |
|Plumbers |6 |3 |
|Sheet Metal Workers |12 |4 |
|Plasterers |8 |4 |
|Plaster Tenders |2 |1 |
|Roofers and Water proofers |5 |3 |
|Teamsters | | |
|Tile / Marble / Terrazzo | | |
|Tradeshow and Sign Craft | | |
|T Referrals and Jurisdictional Assignments |
|Referral procedures will be in accordance with Article 3 of the Project Stabilization Agreement. We ask the unions to have these referral procedures|
|posted at their hiring halls in order to be in full compliance with the law. |
| |
|All work assignments below are proposed assignments. Any craft in disagreement with proposed assignments may submit written documentation, within 14|
|days after the Pre-job Conference, to justify their claim to the work involved. The contractors will review all responses, if any. |
| |
|After the review, the contractor(s) shall make all assignment permanent. Any craft who has a disagreement with these final assignment(s) may file a |
|jurisdictional dispute consistent with Article 8, Work Assignments and Disputes of the Project Stabilization Agreement. |
|Jurisdictional Assignments |
|Type of Work |Work Assignment |
|Div #06 Rough carpentry / Abdellatif Ent. |Local 547_Retrofit of roofs to accommodate new AC units |
|Div #07 Roofing/ A Good Roofer |Local 45_Roofing |
|Div #22 Plumbing & Div #23 HVAC /AO Reed |Local 206 Sheet Metals & Local 230_Plumbers/Fitters |
|Div #09 Cement Plaster & Div #05 Gypsum board assembly/ Brady Co of SD |Local 1506_drywall, taping, lath, plaster |
| |Local 1414 Plaster tender |
|Div #02 Selective Demolition & Asbestos Abatement / Diversified Demolition|Local_89 & Local 300 Demo, Asbestos abatement |
|Co | |
|Div #03 Cast in Place / Diversified Demolition CO |Local 89 & Local 300 Form and place concrete for C.U and utility trenches |
|Div #32 Chain Link Fence & Gates / In-Line Fence and Railing Co | |
|Div #05 Fabrication Structural Steel, Misc. Metals & erection / McMahon |Local 229_Iron work |
|Steel | |
|Div #26 Electrical Neal Electric |Local 569, Local 12 – electrical, excavating for elect duct |
|Div #09 Painting / OHE | |
|Dive #32 Grading & Paving / RAP Engineering |Local 12 & Local 89_Installation of asphalt paving |
|Div #09 Acoustical Ceilings / TP Acoustics |Local 1506 Furnish and Install acoustical tile ceilings |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
|Subcontractors to Be Utilized |
|Subcontractor Name: Abdellatif Enterprises |
|Type/Scope of Work: Rough Carpentry |
|Address: 26071 Merit Circle, Suite 114, Laguna Hill, CA. 92653 |
|Phone Number: 949-215-4790 |License Number: 662128 |
|Estimated Starting Date:4/1/2017 |Estimated Ending Date:730 days |
|Manpower to Be Order By: Hazem |
| |
|Subcontractor Name: A Good Roofer |
|Type/Scope of Work: Roofing |
|Address: 11651 Riverside Drive #145, Lakeside, CA. 92040 |
|Phone Number: 619-561-7600 |License Number:685015 |
|Estimated Starting Date: tbd |Estimated Ending Date: tbd |
|Manpower to Be Order By: Robert or Jack |
| |
|Subcontractor Name: AO Reed |
|Type/Scope of Work: HVAC and Plumbing |
|Address: 4777 Ruffner Street, San Diego, CA. 92111 |
|Phone Number: 858-565-4131 |License Number:7731 |
|Estimated Starting Date:4/1/2017 |Estimated Ending Date: 730 days |
|Manpower to Be Order By: tbd |
| |
|Subcontractor Name: A-Vet Contracting |
|Type/Scope of Work: |
|Address: |
|Phone Number: |License Number: |
|Estimated Starting Date: |Estimated Ending Date: |
|Manpower to Be Order By: |
| |
|Subcontractor Name: Monaco Plumbing |
|Type/Scope of Work: |
|Address: |
|Phone Number: |License Number: |
|Estimated Starting Date: |Estimated Ending Date: |
|Manpower to Be Order By: |
| |
| |
|Subcontractor Name: McMahon Steel Co |
|Type/Scope of Work: Structural Steel and Misc. metals erection |
|Address: 1880 Nirvana Ave, Chula Vista, CA. 91911 |
|Phone Number: 619-671-9700 |License Number: 779638 |
|Estimated Starting Date: tbd |Estimated Ending Date: tbd |
|Manpower to Be Order By: Kevin |
| |
|Subcontractor Name: RAP Engineering, Inc. |
|Type/Scope of Work: Grading /Paving |
|Address: 420 Olive Avenue, Vista, CA. 92083 |
|Phone Number: 760-233-2980 |License Number: 880956 |
|Estimated Starting Date: tbd |Estimated Ending Date: tbd |
|Manpower to Be Order By: Robert |
| |
|Subcontractor Name: TP Acoustics |
|Type/Scope of Work: Acoustical Ceilings tile |
|Address: 9225 Mira Este Ct. Suite A, San Diego, CA. 92126 |
|Phone Number: 858-271-4404 |License Number: 592834 |
|Estimated Starting Date: April 2017 |Estimated Ending Date: 600 days |
|Manpower to Be Order By: tbd |
| |
|Subcontractor Name: Neal Electric |
|Type/Scope of Work: Electrical |
|Address: 2790 Business Park Drive, Vista, CA. 92081 |
|Phone Number: 858-513-2525 |License Number: 802588 |
|Estimated Starting Date: 4/2017 |Estimated Ending Date: tbd |
|Manpower to Be Order By: tbd |
| |
|Subcontractor Name: |
|Type/Scope of Work: |
|Address: |
|Phone Number: |License Number: |
|Estimated Starting Date: |Estimated Ending Date: |
|Manpower to Be Order By: |
| |
| |
|Subcontractor Name: |
|Type/Scope of Work: |
|Address: |
|Phone Number: |License Number: |
|Estimated Starting Date: |Estimated Ending Date: |
|Manpower to Be Order By: |
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
- attendance improvement manual
- los angeles unified school district
- audio video information gathering
- protocol signature page
- professional services agreement
- juvenile court student transition report juvenile court
- section 1 introduction definitions
- continuing education alamance community college
- work experience education guide work experience