Sitewide - Custom - All Projects Info Report (1)

Sitewide - All Projects Info Report

Date Created

Workflow

Project Name

Coordinator

Description

Project Status

10/5/2018 Gainesville Building Workflow

10/5/2018 Gainesville Building Workflow

10/5/2018 Gainesville Building Workflow

10/4/2018 Gainesville Building Workflow

10/3/2018 Gainesville Building Workflow

10/3/2018 Gainesville Building Workflow

10/3/2018 Gainesville Building Workflow

10/3/2018 Gainesville Building Workflow

10/2/2018 Gainesville Building Workflow

10/2/2018 Gainesville Building Workflow

10/2/2018 Gainesville Building Workflow

10/2/2018 Gainesville Building Workflow

10/1/2018 Gainesville Building Workflow

10/1/2018 Gainesville Building Workflow

10/1/2018 Gainesville Building Workflow

10/1/2018 Gainesville Building Workflow

10/1/2018 Gainesville Building Workflow

10/1/2018 Gainesville Building Workflow

BP-18-06995 - Res

Paul Myers

Accessory Structure -

Reinhard

BP-18-06945 Fire Alarm - John Lake

Double Envelope

BP-18-06926 Comm

Paul Myers

Repair (vehicle damage) -

The Plaza

BP-18-06141-02 - Comm Chip Howe

Accessory Structure -

Saddle Cove

BP-18-05462-01 Fire John Lake

Sprinkler - Alachua

County Humane Society

BP-18-06624-01 Fire John Lake

Sprinkler - The

Orthopedic Institute

BP-18-06922 Res

Chip Howe

Alteration - Asfour

BP-18-06917 - New Service

Carson Stanton

BP-18-06646 Comm Alt - Linda Patrick Jenkins Auto

BP-18-06864 Comm Remodel - Stoneridge Unit Q150 BP-18-06848 Res New Aluminum Str - Fiorenza

Paul Myers Chip Howe

BP-18-06847 Solar Pool Linda Patrick Heating - Liles

BP-18-06802 Site Improvements COG Depot Park BP-18-06844 Sign Electrical - Bleu Bird Wings BP-18-06813 Res Alteration - Vala (Historic) BP-18-06776 Res Alteration - Strand

Paul Myers Carson Stanton Chip Howe Chip Howe

BP-18-06775 Fire Alarm - John Lake The Palms

BP-18-06722 Res Alteration - Jones

Chip Howe

26x18 Carport

In Review

Fire Alarm, Transition from In Review POTs to Radio

Repair to block wall from vehicle damage

In Review

Construction of new storage In Review building

Relocate sprinkler heads to In Review accommodate new ceiling and floor layout Rework existing wet sprinkler In Review system

master bathroom remodel In Review

Electrical Service Repair/Upgrade

Commercial Remodel

In Review In Review

Replacement of wood frame In Review

balcony, no additional sqaure

footage

Screen room with insulated In Review

roof panels on existing wood

deck ***FLOOD***

Solar Pool Heating

In Review

Site Work - Depot Park to Old In Review RTS Connection

Installation of raceway channel letters

In Review

Reconstruction of back of the In Review house

Enclose portion of lanai currently under room to be incorporated with interior dining space Fire Alarm

In Review In Review

Renovate kitchen and dining In Review area

Review Cycle

Review Due Date

Current Activity

1 10/22/2018 Department Review

1 10/29/2018 Department Review

1 10/12/2018 Department Review

1 10/22/2018 Department Review

1 10/25/2018 Department Review

1 10/29/2018 Department Review

1 10/12/2018 Department Review

1 10/16/2018 Department Review

1 10/25/2018 Department Review

1 10/12/2018 Department Review

1 10/23/2018 Department Review

1

10/9/2018 Department

Review

1 10/15/2018 Department Review

1 10/17/2018 Department Review

1 10/17/2018 Department Review

1 10/10/2018 Department Review

Project Completion

Date

Lifecycle of Project

Contact

0 tonysullivan@minds

0 cogpermit@gatorfir

0 betsychildress@yah

0 smatthews2785@g

0 pramirez@wwgfp.c om

0 pramirez@wwgfp.c om

0 dan@dynamicbuilds .com

0 odparlik@yahoo.co m

0 claPierre@

0 chrishall@emmergr

0 merritt.aluminum@

0 info@caribbeanelect

0 christina@oelrichco

0 kevin@jeffcoatsigns .com

0 alex@

0 robertb.grch@gmail .com

1 10/25/2018 Department Review

1 10/10/2018 Department Review

0 cogpermit@gatorfir

0 lynndale.enterprises @

Sitewide - All Projects Info Report

9/28/2018 Gainesville Building Workflow

9/28/2018 Gainesville Building Workflow

BP-18-05342-01-01 Fire John Lake Sprinkler - Tower Center Phase II BP-18-06835 - Res Alt Chip Howe (Duplex) - Campbell

9/28/2018 Gainesville Building Workflow

9/28/2018 Gainesville Building Workflow

9/28/2018 Gainesville Building Workflow

9/27/2018 Gainesville Building Workflow

BP-18-05626 Sign

Carson Stanton

Electrical - Butler Plaza

West

BP-18-06808 - Comm Linda Patrick

Rem - Nationwide Phase

8 A2 Wing

BP-18-06687 Res Alt - Chip Howe

Fisher

BP-18-06539 Comm Alteration - Quest Diagnostics

Linda Patrick

9/27/2018 Gainesville Building Workflow

9/27/2018 Gainesville Building Workflow

9/26/2018 Gainesville Building Workflow

9/26/2018 Gainesville Building Workflow

9/26/2018 Gainesville Building Workflow

9/26/2018 Gainesville Building Workflow

9/26/2018 Gainesville Building Workflow

9/26/2018 Gainesville Building Workflow

9/25/2018 Gainesville Building Workflow

9/25/2018 Gainesville Building Workflow

9/25/2018 Gainesville Building Workflow

9/24/2018 Gainesville Building Workflow

BP-18-06705 Res Alteration - Errico

Chip Howe

BP-18-06686 Res New Chip Howe

Aluminum Structure -

Parler

BP-18-06714 - Res Shed Chip Howe

Install (Owner Builder) -

Hedgecock

BP-18-06710 - Res

Paul Myers

Demo- Cutter

BP-18-06114 - New SFD -Robin Rentz Finley Woods Lot 92

BP-18-04725-01 New Linda Patrick Apartments - Campus Advantage BP-18-04725-02 New Linda Patrick Parking Garage - Campus Advantage

BP-18-06547 Res

Carson Stanton

Generator Install - Cade

BP-18-06641 - Res Remodel - Ewell

Chip Howe

BP-18-06475 - Demo Residential (partial) Smith BP-18-06659 Comm Remodel - Gator Wesley Coffee Shop BP-18-06633 - Sign Electrical - Rainbow

Paul Myers Linda Patrick Carson Stanton

Fire Sprinkler

In Review

repipe, 2 tankless hotwater In Review

heaters, 2 shower pans,

minor electrical, and electrical

outlets.

New illuminated project

In Review

monument sign

Above ceiling mechanical, electrical, finishes

In Review

Remodel 1 and 2 Family

In Review

interior alteration of existing space inside of Walmart to create professional diagnostics offices for Quest Diagnostics - includes MEP Remodel kitchen

In Review In Review

6X23 Screen room and concrete

install two 12'x24' manufactured sheds

demo - 1 story residence

In Review In Review In Review

Finley Woods Lot 92: New In Review SFD conditioned 2073 total 2780 sqft new construction of a 4-story In Review 232 unit multifamily building total 293,472 sqft new construction of a 6-level In Review precast concrete parking decktotal 177,075 sqft

Install 38 kw Generac

In Review

generator with 200 amp

transfer switch

Bathroom remodel, remove In Review

wall in kitchen, adding to

porch with awning

Demo 2nd level down to block In Review

remodel existing building

In Review

Install illuminated wall sign In Review connect to existing electric

1 10/25/2018 Department Review

1

10/8/2018 Department

Review

1 10/16/2018 Department Review

1 10/24/2018 Department Review

1

10/9/2018 Department

Review

1 10/24/2018 Department Review

1

10/9/2018 Department

Review

1 10/15/2018 Department Review

1 10/12/2018 Department Review

1

10/8/2018 Review

Complete

1 10/18/2018 Department Review

2 10/23/2018 Department Review

1 10/22/2018 Department Review

1 10/11/2018 Department Review

1 10/17/2018 Department Review

1 10/10/2018 Department Review

1 10/22/2018 Department Review

1 10/12/2018 Department Review

0 cogpermit@gatorfir

0 fredr@ro-

0 krosenstock@p1sig

0 chadmo@

0

0 brian.s@skylinegrou

0 cjcustomcarp@aol.c om

0

0 ddepatie@ufl.edu

0 rono@osteenbrothe

0 ginney@tommywilli

0 grantcurtan@coreco

0 grantcurtan@coreco

0 s.e.williamselectric @

0 ewelllm@gm.sbac.e du

0 u2meper@gmail.co m

0

0 alysonb@rogerssign

Sitewide - All Projects Info Report

9/24/2018 Gainesville Building Workflow

9/24/2018 Gainesville Building Workflow

9/24/2018 Gainesville Building Workflow

9/21/2018 Gainesville Building Workflow

9/21/2018 Gainesville Building Workflow

9/21/2018 Gainesville Building Workflow

9/20/2018 Gainesville Building Workflow

9/20/2018 Gainesville Building Workflow

9/20/2018 Gainesville Building Workflow

9/20/2018 Gainesville Building Workflow

9/20/2018 Gainesville Building Workflow

9/19/2018 Gainesville Building Workflow

9/19/2018 Gainesville Building Workflow

9/19/2018 Gainesville Building Workflow

9/19/2018 Gainesville Building Workflow

9/19/2018 Gainesville Building Workflow

BP-18-06624 Comm Alt - Paul Myers Orthopaedic Institue

BP-18-06618 - Res Alteration - Mills

Chip Howe

BP-18-06603 - Res

Carson Stanton

Generator Install - Cook

BP-18-06590 - Res

Paul Myers

Swimming Pool (Historic)

- Hessler

BP-18-06574 - Shed - Chip Howe

Bremer

BP-18-05726-01 - Comm Paul Myers New - Wawa

BP-18-04531-04 Comm Gen Set - Traditional Acupuncture BP-18-06563 Res Addition - White

Carson Stanton Chip Howe

BP-18-06554 New SFD Robin Rentz COG Housing - Miller

BP-18-06512 Sign Electrical - Dillards

Carson Stanton

BP-18-06542 -

Chip Howe

Commerical Remodel -

Tumptin Thai Restaurant

BP-18-06487 Interior Paul Myers

Buildout New - Pink

Narcissus

BP-18-06527 Generator Carson Stanton

Install - Signature Health

Care

BP-18-05228-02 Fire John Lake

Alarm - Consortium

BP-18-06483 Res

Carson Stanton

Generator Install - Moses

BP-18-06506-01 - Comm Paul Myers New Hotel - Comfort Suites

9/19/2018 Gainesville Building Workflow

9/18/2018 Gainesville Building Workflow

9/17/2018 Gainesville Building Workflow

BP-18-06506 - Site Work Paul Myers - Comfort Suites (DB-1800067) BP-18-06456 Comm Alt - Paul Myers USDA

BP-18-06406 Comm Alt - Paul Myers Mega Store & Cafeteria Unit B

Commercial Remodel

In Review

Closing in carport ***FLOOD***

Generator Installation

In Review In Review

swimming pool

In Review

16x40 pre-manufactured shed In Review

Construction of new 5,636 Wawa convenience store

Generator Installation

In Review In Review

adding open porch with roof In Review

new SFD heated sq ft 1046 total sq ft 1216. 2 beds/1 bath Sign Electrical

In Review In Review

Remodeling of kitchen & bathrooms, demolition, with electrical and plumbing Interior fit up of new shell space

In Review In Review

generator install in nursing home

In Review

Fire Alarm

In Review

Install a 22-kw Natural gas In Review generator with 200-amp ATS

construct a 5 story, type IIB, In Review fully sprinkled, 106 room, masonry/hollow core hotel

new hotel site. Clearing,

In Review

grubbing, export/import and

pressure grouting.

Interior renovation to existing In Review

office space

Unit B: Alteration to existing In Review building

1 10/22/2018 Department Review

1 10/25/2018 Department Review

1 10/15/2018 Department Review

1 10/18/2018 Department Review

1 10/11/2018 Department Review

1 10/22/2018 Department Review

1 10/15/2018 Department Review

1 10/12/2018 Department Review

1 10/17/2018 Department Review

1

10/5/2018 Review

Complete

1

10/8/2018 Department

Review

1

10/8/2018 Department

Review

1

10/9/2018 Department

Review

1 10/29/2018 Department Review

2 10/17/2018 Department Review

1 10/22/2018 Department Review

1 10/25/2018 Department Review

1

10/8/2018 Department

Review

1 10/11/2018 Department Review

0 holway77@yahoo.c om

0 mosleybuildersinc@

0 superiorec@yahoo.c om

0 dofla51@

0 steve.bremer53@ya

0 jessicah@meconstr

0 s.e.williamselectric @

0 coppergator@yahoo .com

0 lewis@lejaconstruct

0 sales@gainesvillene

0 ivansolbach@gmail. com

0 permits@thebluepri

0

0 pramirez@wwgfp.c om

0 chancey@vintageele

0 TFEASTER@FEASTE

0 TFEASTER@FEASTE

0 annepolo@scherern

0 candace@thebluepri

Sitewide - All Projects Info Report

9/17/2018 Gainesville Building Workflow

9/17/2018 Gainesville Building Workflow

9/17/2018 Gainesville Building Workflow

9/17/2018 Gainesville Building Workflow

9/17/2018 Gainesville Building Workflow

9/17/2018 Gainesville Building Workflow

9/17/2018 Gainesville Building Workflow

9/17/2018 Gainesville Building Workflow

9/17/2018 Gainesville Building Workflow

9/14/2018 Gainesville Building Workflow

9/13/2018 Gainesville Building Workflow

9/13/2018 Gainesville Building Workflow

9/13/2018 Gainesville Building Workflow

9/12/2018 Gainesville Building Workflow

9/12/2018 Gainesville Building Workflow

BP-18-06405 Comm

Paul Myers

Remodel - Chicken Grill

Unit A

BP-18-06441 - New SFD -Paul Myers

Hidden Lake Lot 41

BP-18-06437 - Comm Chip Howe Alt - Hampton Oaks BLDG I BP-18-06436 - Comm Chip Howe Alt - Hampton Oaks BLDG H BP-18-06434 - Comm Chip Howe Alt - Hampton Oaks BLDG G BP-18-06432 - Comm Chip Howe Alt - Hampton Oaks BLDG F BP-18-06430 - Comm Alt Chip Howe - Hampton Oaks BLDG E

BP-18-05726-02 - Comm Paul Myers Canopy - Wawa

BP-18-06418 Generator Carson Stanton Installation - Stump, Eugene & Ayhan BP-18-06356 - Fuel Tank Paul Myers and Canopy Removal University Citgo BP-18-06376 - Res Alt - Chip Howe (OWNER BUILDER) Beck BP-18-06370 Comm Alt - Robin Rentz Bristol Park Ste 1

BP-18-06369 - New SFD -Robin Rentz GNV CoHousing Lot 11

BP-17-07378-11 - Comm Paul Myers

Generator Install -

Medical Exam Office

BP-18-06289 Res

Chip Howe

Addition - Kannan

Unit A - Changing from pharmacy to restaurant

In Review

New SFD, Heated 1664 sqft/ In Review total 2250 sqft

Replace existing siding with In Review new 1250 SQ. Feet

Replace existing siding with In Review new 1100 SQ. Feet

Replace existing siding with In Review new 1000 SQ. Feet

Replace existing siding with In Review new 450 SQ. Feet

Replace existing siding with In Review new 2000 SQ. Feet

Construction of new 5,280 sqft canopy for wawa gas station install standby generator & transfer switch, gas line

In Review In Review

canopy demo and removal of In Review fuel tanks

building 544 sqft addition to In Review home

cutting new door on non load In Review bearing wall

New SFD 818 heated sqft/ 1184 total sqft

In Review

install generator

In Review

Hip style roof tied into

In Review

existing roof w/ shingles to

match, screen walls, concrete

footers. Fan & egress light

9/11/2018 Gainesville Building Workflow

9/11/2018 Gainesville Building Workflow

9/11/2018 Gainesville Building Workflow

9/11/2018 Gainesville Building Workflow

BP-18-06269 Comm

Paul Myers

Alteration - UF Health

(PAUSED)

BP-18-06266 New SFD - Building Review

Finley Woods Lot 82

complete renovation of existing interior space (Existing Sears - Oaks Mall) New SFD heated sq ft 2760 total sq ft 3571

In Review In Review

BP-18-06243 Res Addition - Jagannath (ATF) BP-18-06176 Res Generator Installaton Rodel

Robin Rentz Carson Stanton

***AFTER THE FACT PERMIT*** Bedroom and bathroom addition Installation of back up generator

In Review In Review

1

10/5/2018 Department

Review

1 10/15/2018 Department Review

1

10/8/2018 Department

Review

1

10/8/2018 Department

Review

1

10/8/2018 Department

Review

1

10/8/2018 Department

Review

1

10/8/2018 Department

Review

1 10/22/2018 Department Review

2 10/10/2018 Review Complete

1 10/17/2018 Department Review

1

10/8/2018 Department

Review

1

10/9/2018 Batch

Stamp

1

10/8/2018 Department

Review

2

10/3/2018 Batch

Stamp

1

10/9/2018 Department

Review

1

9/18/2018 Review

Complete

1 10/12/2018 Department Review

1 10/16/2018 Department Review

2 10/16/2018 Department Review

0 candace@thebluepri

0 natasha@carriganco

0 jinnieb@

0 jinnieb@

0 jinnieb@

0 jinnieb@

0 jinnieb@

0 jessicah@meconstr

0 jcomly@windstream .net

0 ktownsel@aetllc.co m

0 gvbldg@

0 tannerconstructiong roup@

0 timflanco@bellsout

0 mdstate4@bellsout

0 alumatecremodeling @

0 permits@

0 cassi@norfleethome

0 JR042446@GMAIL. COM

0 info@caribbeanelect

Sitewide - All Projects Info Report

9/11/2018 Gainesville Building Workflow

9/7/2018 Gainesville Building Workflow

BP-18-06242 Res Addition (Flood & Historic) - Seaver BP-18-06209 Sign NonElectrical - 1805 - Total Home

Paul Myers Chip Howe

9/6/2018 Gainesville Building Workflow

9/5/2018 Gainesville Building Workflow

9/5/2018 Gainesville Building Workflow

9/4/2018 Gainesville Building Workflow

8/31/2018 Gainesville Building Workflow

BP-18-06179 - New SFD -Paul Myers Abington Oaks Phase 2 Lot 24 BP-18-06141 - Site Work Paul Myers - Saddle Cove

BP-18-06128 - Comm Paul Myers Remodel - Nine Spicy Hotpot BP-18-06096 - New SFD -Paul Myers Fieldman

BP-18-06080 - Res Addition - Vinson

Robin Rentz

8/31/2018 Gainesville Building Workflow

8/29/2018 Gainesville Building Workflow

8/29/2018 Gainesville Building Workflow

8/28/2018 Gainesville Building Workflow

8/28/2018 Gainesville Building Workflow

8/27/2018 Gainesville Building Workflow

8/27/2018 Gainesville Building Workflow

8/27/2018 Gainesville Building Workflow

8/27/2018 Gainesville Building Workflow

BP-18-06023 - Comm Alt Paul Myers - Bubble Tea

BP-18-06022 Sign Electrical - Hairport

Carson Stanton

BP-18-06020 Sign

Carson Stanton

Electrical - Liberty Tax

BP-18-05979 -

Dan Starbuck

Occupancy - Trinity's Day

Spa

BP-18-04844 - Tenant Paul Myers

Build-out - Noire the Nail

Bar

BP-18-05943 - New SFD -Paul Myers

Finley Woods Lot 58

BP-18-05843 - New SFD -Paul Myers Ironwood Diggs

BP-18-05870 New SFD - Paul Myers Finley Woods Lot 87

BP-18-05866 - Res Generator - Floyd

Carson Stanton

8/22/2018 Gainesville Building Workflow

8/22/2018 Gainesville Building Workflow

BP-18-05830 - Comm Demo - Gville Airport

Paul Myers

BP-18-05824 - New SFD -Paul Myers Finley Woods Lot 86

extending detached garage In Review

build a sign with a concrete In Review

base with steel members to

support precast concrete sign

and lettering

Abington Oaks Phase 2 - New In Review

SFD: conditioned 2422 total

2985

Site Work for new office

In Review

remodel for new restaurant In Review

New SFD heated sqft 4631/ In Review total sqft 6874

expanding living room, adding In Review free standing deck in backyard and expanding front porch

Interior Remodeling

In Review

Sign Electrical

In Review

Sign Electrical

In Review

Occupancy

In Review

new tenant improvement for In Review nail salon

New SFD 1892sqft heated/ In Review 2633sqft total

New SFD - heated 1205 sqft/ In Review

total 1456 sqft

****FLOOD****

Finley Woods Lot 87: New In Review

SFD conitioned: 1508 total

2253 sqft

hook up 22kw generator with In Review

200amp transfer switch. gas

will pull and obtain separate

gas permit.

demo and haul off two

In Review

buildings

New SFD - heated: 1714 sqft/ In Review total: 2576 sqft

1 10/15/2018 Department Review

1 10/12/2018 Department Review

1

10/9/2018 Department

Review

1 10/18/2018 Department Review

1 10/17/2018 Department Review

1 10/15/2018 Department Review

1 10/19/2018 Department Review

1

10/2/2018 Batch

Stamp

1 10/16/2018 Department Review

1 10/12/2018 Department Review

2 10/24/2018 Department Review

2 10/12/2018 Department Review

2

10/8/2018 Department

Review

2

10/8/2018 Batch

Stamp

2

10/9/2018 Department

Review

1

10/9/2018 Department

Review

1 10/10/2018 Department Review

2 10/10/2018 Department Review

0 david@customdesig

0 alex@anglin.cfcoxm

0 jfrentzn@bellsouth. net

0 smatthews2785@g

0 fudinconstruction@

0 nic.haylett@gmail.c om

0 shawn@goldenham

0 jayz1046@gmail.co m

0 showntellsigns@gm

0 showntellsigns@gm

0 1ebritt@

0 tektonicainc@aol.co m

0 cassi@norfleethome

0 bkurtzman@alachua

0 ginney@tommywilli

0 tanya@trademarkel

0 annepolo@scherern

0 ginney@tommywilli

Sitewide - All Projects Info Report

8/22/2018 Gainesville Building Workflow

BP-18-05060 -

Carson Stanton

Communication Towers -

Verizon

8/17/2018 Gainesville Building Workflow

8/16/2018 Gainesville Building Workflow

8/13/2018 Gainesville Building Workflow

8/9/2018 Gainesville Building Workflow

8/9/2018 Gainesville Building Workflow

8/8/2018 Gainesville Building Workflow

8/8/2018 Gainesville Building Workflow

8/7/2018 Gainesville Building Workflow

BP-18-05695 - Comm Alt Linda Patrick - LHS Dispensary

BP-18-05682 - New SFD -Paul Myers Frazier

BP-18-05555 - Butler Linda Patrick Town Center, Bldg B Shell BP-18-05493 - Res Deck Chip Howe Contruction (ATF & OB) Silver BP-18-05491 - Comm Alt Paul Myers -Total Home Hardware

BP-18-05462 - Comm Alt Paul Myers - Alachua County Humane Society BP-18-05456 - New SFD -Paul Myers Strawder

BP-18-05443 -

Linda Patrick

Occupancy - Pop A Top

Depot Park Bldg

8/2/2018 Gainesville Building Workflow

8/2/2018 Gainesville Building Workflow

8/1/2018 Gainesville Building Workflow

7/30/2018 Gainesville Building Workflow

7/18/2018 Gainesville Building Workflow

7/17/2018 Gainesville Building Workflow

7/12/2018 Gainesville Building Workflow

7/12/2018 Gainesville Building Workflow

7/12/2018 Gainesville Building Workflow

BP-18-05349 Res Solar Carson Stanton Panels - Cornman

BP-18-05348 Res Solar Carson Stanton Panels - Stofer

BP-18-05286 Interior Buildout New - Village Jeweler BP-18-05257 Comm Remodel - Swamp Boil

Linda Patrick Paul Myers

BP-18-04857 - Interior Buildout New - Opus Coffee Unit 100 BP-18-04906 - Mobile Home Set Up - Whitney Lot 49 BP-18-04880 - Campus Circle bldg 9 Umbrella Pavilion BP-18-04879 - Campus Circle bldg 8 Trash Compactor BP-18-04878 - Campus Circle bldg 7 Maintenance Shed

Linda Patrick Paul Myers Paul Myers Paul Myers Paul Myers

Remove and replace (6)

In Review

antennas, add (3) RRU's, add

(1) OVP, and add (1) Hybrid

Fiber Cable

Interior Build Out for Liberty In Review

Health Sciences

New SFD total sqft 1305, heated sqft 1305

In Review

Building Shell for BTC - Phase In Review B Area

ground wood deck 180 sqft, In Review highest point above ground is 21 inches. (ATF) exterior elevation remodel/ In Review interior remodel.

interior renovation to create more admin offices, exam area, and surgery suite New SFD heated sqft 1205/total sqft 1977

In Review In Review

Pop-a-Top Kitchen Expansion In Review into PreTenant space including Cooking equipment and plumbing work

7.68kw roof mounted solar In Review array

new 3.52 kw roof mounted In Review solar

interior Build out in existing In Review new shell Bldg A, Suite 50

LEVEL 2 ALTERATION Swamp Boil Restaurant

In Review

Interior buildout on 1st floor In Review of 800 Second Bldg Suite 100

Mobile Home Set Up Flood Zone X

In Review

Accessory Structure Commercial

In Review

Accessory Structure Commercial

In Review

Accessory Structure Commercial

In Review

1 10/16/2018 Department Review

2

10/9/2018 Department

Review

2 10/12/2018 Department Review

2 10/10/2018 Department Review

2

10/5/2018 Review

Complete

2 10/12/2018 Department Review

1 10/12/2018 Department Review

1 10/16/2018 Department Review

2

10/5/2018 Department

Review

1 10/22/2018 Department Review

1 10/15/2018 Department Review

1

10/8/2018 Department

Review

2 10/10/2018 Department Review

2 10/12/2018 Department Review

1 10/15/2018 Department Review

1

8/7/2018 Batch

Stamp

1

8/7/2018 Batch

Stamp

2

9/18/2018 Batch

Stamp

0 VERONICA.CARMEA N@ASCENDWIRELE

0 info@

0 sarentz@slconstruct

0 ccobern@

0 woodysil@hotmail.c om

0 ben@anglin.cfcoxm

0 gingerw@jedeckerc

0 mosleybuildersinc@

0 mytop@

0 richie.wilhoit@solari

0 richie.wilhoit@solari

0 info@

0 lzhang22@

0 john@conceptcomp

0 olinstransport@gma

0 bgaherty@bainbridg

0 bgaherty@bainbridg

0 bgaherty@bainbridg

Sitewide - All Projects Info Report

7/12/2018 Gainesville Building Workflow

7/12/2018 Gainesville Building Workflow

7/11/2018 Gainesville Building Workflow

7/9/2018 Gainesville Building Workflow

7/9/2018 Gainesville Building Workflow

BP-18-04877 - Comm New - Campus Circle Gym (bldg 2) BP-18-04876 - Comm New - Campus Circle Clubhouse (bldg 1) BP-18-04738 Sign Electrical - Jacobs

Paul Myers Paul Myers Carson Stanton

BP-18-04733 - The

Dan Starbuck

Zensory Experience -

Occupancy

BP-18-04725 Site Work - Paul Myers

Campus Advantage (DB-

18-00014)

7/3/2018 Gainesville Building Workflow

BP-18-04010 - Res Alt - Chip Howe Thias Properties

6/28/2018 Gainesville Building Workflow

BP-18-04409-01 Campus Paul Myers Circle Apartments (MASTER PLANS)

Commercial New

In Review

Commercial New

In Review

Reverse lit and face lit channel letters

Occupancy

In Review In Review

Site Work - Campus

In Review

Advantage***NEED DEMO

PERMITS*** 18-05931, 5930,

5927

Water heater, heat and range In Review

from gas to electric. New

kitchen and bath, new roof

shingles.

Campus Circle Bldg 3, 4, 5, 6 - In Review

4-Story Apartments R-2/VA

(THRESHOLD) DB-18-00062

6/20/2018 Gainesville Building Workflow

6/13/2018 Gainesville Building Workflow

6/7/2018 Gainesville Building Workflow

6/1/2018 Gainesville Building Workflow

4/26/2018 Gainesville Building Workflow

3/16/2018 Gainesville Building Workflow

2/6/2018 Gainesville Building Workflow

12/28/2017 Gainesville Building Workflow

7/20/2017 Gainesville Building Workflow

BP-18-04225 New Comm Linda Patrick - Perm-a-Fix Tank Farm

BP-18-04062 - Comm Paul Myers Rem - 39th Ave - Bldg D Units 25-32

BP-18-03917 Res Alt - Chip Howe Boose

BP-18-03732-01 - Comm Paul Myers New - Zion Lutheran Church BP-18-02793 Comm Alt - Paul Myers Working Foods

BP-18-01808 Sign

Carson Stanton

Electrical - Fairfield Inn

Monument Sign

BP-17-04559 One

Paul Myers

College Park - Phase 1A -

Mixed Use & Dorm Area

BP-17-08137 Site Work - Paul Myers

Integra 24 (DB-17-

00072)

Testing Default Owner Gael Baughman

Commercial New Perm-a-Fix Masonry Wall & Holding Tanks ***(Flood)*** Bldg D - Units 25-32 replacing water damaged wood on the balconies in the rear Remodel 1 and 2 Family ***FLOOD***

In Review In Review In Review

construction of a new church In Review

building, connecting walkways

and parking areas

Add Kitchen area to Existing In Review

Assembly Use & Location

approval only for Ext. Cooler

Sign Electrical

In Review

Commercial Remodel

In Review

sitework

In Review

Testing BLDG Owner

In Review

3 10/15/2018 Department Review

3 10/19/2018 Department Review

3

10/8/2018 Review

Complete

1 10/26/2018 Department Review

1

7/18/2018 Batch

Stamp

1

10/8/2018 Department

Review

3

10/8/2018 Department

Review

2 10/12/2018 Department Review

1

7/2/2018 Batch

Stamp

1 10/23/2018 Department Review

5 10/10/2018 Department Review

1

10/5/2018 Review

Complete

1 10/18/2018 Department Review

2

10/4/2018 Department

Review

1

7/11/2018 Department

Review

1

7/24/2018 Department

Review

0 bgaherty@bainbridg

0 bgaherty@bainbridg

0 service@gainesville

0 thezensoryexperien ce@

0 grantcurtan@coreco

0 macombsenterprise sllc@

0 bgaherty@bainbridg

0 ryan@rmurphyllc.co m

0 josh@americanmeta

0 cherokee_boose@li

0 qualitylinehomes@a

0 info@

0 billy@gainesvilleneo

0 astrickland@

0

0

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download