Sitewide - Custom - All Projects Info Report (1)
Sitewide - All Projects Info Report
Date Created
Workflow
Project Name
Coordinator
Description
Project Status
10/5/2018 Gainesville Building Workflow
10/5/2018 Gainesville Building Workflow
10/5/2018 Gainesville Building Workflow
10/4/2018 Gainesville Building Workflow
10/3/2018 Gainesville Building Workflow
10/3/2018 Gainesville Building Workflow
10/3/2018 Gainesville Building Workflow
10/3/2018 Gainesville Building Workflow
10/2/2018 Gainesville Building Workflow
10/2/2018 Gainesville Building Workflow
10/2/2018 Gainesville Building Workflow
10/2/2018 Gainesville Building Workflow
10/1/2018 Gainesville Building Workflow
10/1/2018 Gainesville Building Workflow
10/1/2018 Gainesville Building Workflow
10/1/2018 Gainesville Building Workflow
10/1/2018 Gainesville Building Workflow
10/1/2018 Gainesville Building Workflow
BP-18-06995 - Res
Paul Myers
Accessory Structure -
Reinhard
BP-18-06945 Fire Alarm - John Lake
Double Envelope
BP-18-06926 Comm
Paul Myers
Repair (vehicle damage) -
The Plaza
BP-18-06141-02 - Comm Chip Howe
Accessory Structure -
Saddle Cove
BP-18-05462-01 Fire John Lake
Sprinkler - Alachua
County Humane Society
BP-18-06624-01 Fire John Lake
Sprinkler - The
Orthopedic Institute
BP-18-06922 Res
Chip Howe
Alteration - Asfour
BP-18-06917 - New Service
Carson Stanton
BP-18-06646 Comm Alt - Linda Patrick Jenkins Auto
BP-18-06864 Comm Remodel - Stoneridge Unit Q150 BP-18-06848 Res New Aluminum Str - Fiorenza
Paul Myers Chip Howe
BP-18-06847 Solar Pool Linda Patrick Heating - Liles
BP-18-06802 Site Improvements COG Depot Park BP-18-06844 Sign Electrical - Bleu Bird Wings BP-18-06813 Res Alteration - Vala (Historic) BP-18-06776 Res Alteration - Strand
Paul Myers Carson Stanton Chip Howe Chip Howe
BP-18-06775 Fire Alarm - John Lake The Palms
BP-18-06722 Res Alteration - Jones
Chip Howe
26x18 Carport
In Review
Fire Alarm, Transition from In Review POTs to Radio
Repair to block wall from vehicle damage
In Review
Construction of new storage In Review building
Relocate sprinkler heads to In Review accommodate new ceiling and floor layout Rework existing wet sprinkler In Review system
master bathroom remodel In Review
Electrical Service Repair/Upgrade
Commercial Remodel
In Review In Review
Replacement of wood frame In Review
balcony, no additional sqaure
footage
Screen room with insulated In Review
roof panels on existing wood
deck ***FLOOD***
Solar Pool Heating
In Review
Site Work - Depot Park to Old In Review RTS Connection
Installation of raceway channel letters
In Review
Reconstruction of back of the In Review house
Enclose portion of lanai currently under room to be incorporated with interior dining space Fire Alarm
In Review In Review
Renovate kitchen and dining In Review area
Review Cycle
Review Due Date
Current Activity
1 10/22/2018 Department Review
1 10/29/2018 Department Review
1 10/12/2018 Department Review
1 10/22/2018 Department Review
1 10/25/2018 Department Review
1 10/29/2018 Department Review
1 10/12/2018 Department Review
1 10/16/2018 Department Review
1 10/25/2018 Department Review
1 10/12/2018 Department Review
1 10/23/2018 Department Review
1
10/9/2018 Department
Review
1 10/15/2018 Department Review
1 10/17/2018 Department Review
1 10/17/2018 Department Review
1 10/10/2018 Department Review
Project Completion
Date
Lifecycle of Project
Contact
0 tonysullivan@minds
0 cogpermit@gatorfir
0 betsychildress@yah
0 smatthews2785@g
0 pramirez@wwgfp.c om
0 pramirez@wwgfp.c om
0 dan@dynamicbuilds .com
0 odparlik@yahoo.co m
0 claPierre@
0 chrishall@emmergr
0 merritt.aluminum@
0 info@caribbeanelect
0 christina@oelrichco
0 kevin@jeffcoatsigns .com
0 alex@
0 robertb.grch@gmail .com
1 10/25/2018 Department Review
1 10/10/2018 Department Review
0 cogpermit@gatorfir
0 lynndale.enterprises @
Sitewide - All Projects Info Report
9/28/2018 Gainesville Building Workflow
9/28/2018 Gainesville Building Workflow
BP-18-05342-01-01 Fire John Lake Sprinkler - Tower Center Phase II BP-18-06835 - Res Alt Chip Howe (Duplex) - Campbell
9/28/2018 Gainesville Building Workflow
9/28/2018 Gainesville Building Workflow
9/28/2018 Gainesville Building Workflow
9/27/2018 Gainesville Building Workflow
BP-18-05626 Sign
Carson Stanton
Electrical - Butler Plaza
West
BP-18-06808 - Comm Linda Patrick
Rem - Nationwide Phase
8 A2 Wing
BP-18-06687 Res Alt - Chip Howe
Fisher
BP-18-06539 Comm Alteration - Quest Diagnostics
Linda Patrick
9/27/2018 Gainesville Building Workflow
9/27/2018 Gainesville Building Workflow
9/26/2018 Gainesville Building Workflow
9/26/2018 Gainesville Building Workflow
9/26/2018 Gainesville Building Workflow
9/26/2018 Gainesville Building Workflow
9/26/2018 Gainesville Building Workflow
9/26/2018 Gainesville Building Workflow
9/25/2018 Gainesville Building Workflow
9/25/2018 Gainesville Building Workflow
9/25/2018 Gainesville Building Workflow
9/24/2018 Gainesville Building Workflow
BP-18-06705 Res Alteration - Errico
Chip Howe
BP-18-06686 Res New Chip Howe
Aluminum Structure -
Parler
BP-18-06714 - Res Shed Chip Howe
Install (Owner Builder) -
Hedgecock
BP-18-06710 - Res
Paul Myers
Demo- Cutter
BP-18-06114 - New SFD -Robin Rentz Finley Woods Lot 92
BP-18-04725-01 New Linda Patrick Apartments - Campus Advantage BP-18-04725-02 New Linda Patrick Parking Garage - Campus Advantage
BP-18-06547 Res
Carson Stanton
Generator Install - Cade
BP-18-06641 - Res Remodel - Ewell
Chip Howe
BP-18-06475 - Demo Residential (partial) Smith BP-18-06659 Comm Remodel - Gator Wesley Coffee Shop BP-18-06633 - Sign Electrical - Rainbow
Paul Myers Linda Patrick Carson Stanton
Fire Sprinkler
In Review
repipe, 2 tankless hotwater In Review
heaters, 2 shower pans,
minor electrical, and electrical
outlets.
New illuminated project
In Review
monument sign
Above ceiling mechanical, electrical, finishes
In Review
Remodel 1 and 2 Family
In Review
interior alteration of existing space inside of Walmart to create professional diagnostics offices for Quest Diagnostics - includes MEP Remodel kitchen
In Review In Review
6X23 Screen room and concrete
install two 12'x24' manufactured sheds
demo - 1 story residence
In Review In Review In Review
Finley Woods Lot 92: New In Review SFD conditioned 2073 total 2780 sqft new construction of a 4-story In Review 232 unit multifamily building total 293,472 sqft new construction of a 6-level In Review precast concrete parking decktotal 177,075 sqft
Install 38 kw Generac
In Review
generator with 200 amp
transfer switch
Bathroom remodel, remove In Review
wall in kitchen, adding to
porch with awning
Demo 2nd level down to block In Review
remodel existing building
In Review
Install illuminated wall sign In Review connect to existing electric
1 10/25/2018 Department Review
1
10/8/2018 Department
Review
1 10/16/2018 Department Review
1 10/24/2018 Department Review
1
10/9/2018 Department
Review
1 10/24/2018 Department Review
1
10/9/2018 Department
Review
1 10/15/2018 Department Review
1 10/12/2018 Department Review
1
10/8/2018 Review
Complete
1 10/18/2018 Department Review
2 10/23/2018 Department Review
1 10/22/2018 Department Review
1 10/11/2018 Department Review
1 10/17/2018 Department Review
1 10/10/2018 Department Review
1 10/22/2018 Department Review
1 10/12/2018 Department Review
0 cogpermit@gatorfir
0 fredr@ro-
0 krosenstock@p1sig
0 chadmo@
0
0 brian.s@skylinegrou
0 cjcustomcarp@aol.c om
0
0 ddepatie@ufl.edu
0 rono@osteenbrothe
0 ginney@tommywilli
0 grantcurtan@coreco
0 grantcurtan@coreco
0 s.e.williamselectric @
0 ewelllm@gm.sbac.e du
0 u2meper@gmail.co m
0
0 alysonb@rogerssign
Sitewide - All Projects Info Report
9/24/2018 Gainesville Building Workflow
9/24/2018 Gainesville Building Workflow
9/24/2018 Gainesville Building Workflow
9/21/2018 Gainesville Building Workflow
9/21/2018 Gainesville Building Workflow
9/21/2018 Gainesville Building Workflow
9/20/2018 Gainesville Building Workflow
9/20/2018 Gainesville Building Workflow
9/20/2018 Gainesville Building Workflow
9/20/2018 Gainesville Building Workflow
9/20/2018 Gainesville Building Workflow
9/19/2018 Gainesville Building Workflow
9/19/2018 Gainesville Building Workflow
9/19/2018 Gainesville Building Workflow
9/19/2018 Gainesville Building Workflow
9/19/2018 Gainesville Building Workflow
BP-18-06624 Comm Alt - Paul Myers Orthopaedic Institue
BP-18-06618 - Res Alteration - Mills
Chip Howe
BP-18-06603 - Res
Carson Stanton
Generator Install - Cook
BP-18-06590 - Res
Paul Myers
Swimming Pool (Historic)
- Hessler
BP-18-06574 - Shed - Chip Howe
Bremer
BP-18-05726-01 - Comm Paul Myers New - Wawa
BP-18-04531-04 Comm Gen Set - Traditional Acupuncture BP-18-06563 Res Addition - White
Carson Stanton Chip Howe
BP-18-06554 New SFD Robin Rentz COG Housing - Miller
BP-18-06512 Sign Electrical - Dillards
Carson Stanton
BP-18-06542 -
Chip Howe
Commerical Remodel -
Tumptin Thai Restaurant
BP-18-06487 Interior Paul Myers
Buildout New - Pink
Narcissus
BP-18-06527 Generator Carson Stanton
Install - Signature Health
Care
BP-18-05228-02 Fire John Lake
Alarm - Consortium
BP-18-06483 Res
Carson Stanton
Generator Install - Moses
BP-18-06506-01 - Comm Paul Myers New Hotel - Comfort Suites
9/19/2018 Gainesville Building Workflow
9/18/2018 Gainesville Building Workflow
9/17/2018 Gainesville Building Workflow
BP-18-06506 - Site Work Paul Myers - Comfort Suites (DB-1800067) BP-18-06456 Comm Alt - Paul Myers USDA
BP-18-06406 Comm Alt - Paul Myers Mega Store & Cafeteria Unit B
Commercial Remodel
In Review
Closing in carport ***FLOOD***
Generator Installation
In Review In Review
swimming pool
In Review
16x40 pre-manufactured shed In Review
Construction of new 5,636 Wawa convenience store
Generator Installation
In Review In Review
adding open porch with roof In Review
new SFD heated sq ft 1046 total sq ft 1216. 2 beds/1 bath Sign Electrical
In Review In Review
Remodeling of kitchen & bathrooms, demolition, with electrical and plumbing Interior fit up of new shell space
In Review In Review
generator install in nursing home
In Review
Fire Alarm
In Review
Install a 22-kw Natural gas In Review generator with 200-amp ATS
construct a 5 story, type IIB, In Review fully sprinkled, 106 room, masonry/hollow core hotel
new hotel site. Clearing,
In Review
grubbing, export/import and
pressure grouting.
Interior renovation to existing In Review
office space
Unit B: Alteration to existing In Review building
1 10/22/2018 Department Review
1 10/25/2018 Department Review
1 10/15/2018 Department Review
1 10/18/2018 Department Review
1 10/11/2018 Department Review
1 10/22/2018 Department Review
1 10/15/2018 Department Review
1 10/12/2018 Department Review
1 10/17/2018 Department Review
1
10/5/2018 Review
Complete
1
10/8/2018 Department
Review
1
10/8/2018 Department
Review
1
10/9/2018 Department
Review
1 10/29/2018 Department Review
2 10/17/2018 Department Review
1 10/22/2018 Department Review
1 10/25/2018 Department Review
1
10/8/2018 Department
Review
1 10/11/2018 Department Review
0 holway77@yahoo.c om
0 mosleybuildersinc@
0 superiorec@yahoo.c om
0 dofla51@
0 steve.bremer53@ya
0 jessicah@meconstr
0 s.e.williamselectric @
0 coppergator@yahoo .com
0 lewis@lejaconstruct
0 sales@gainesvillene
0 ivansolbach@gmail. com
0 permits@thebluepri
0
0 pramirez@wwgfp.c om
0 chancey@vintageele
0 TFEASTER@FEASTE
0 TFEASTER@FEASTE
0 annepolo@scherern
0 candace@thebluepri
Sitewide - All Projects Info Report
9/17/2018 Gainesville Building Workflow
9/17/2018 Gainesville Building Workflow
9/17/2018 Gainesville Building Workflow
9/17/2018 Gainesville Building Workflow
9/17/2018 Gainesville Building Workflow
9/17/2018 Gainesville Building Workflow
9/17/2018 Gainesville Building Workflow
9/17/2018 Gainesville Building Workflow
9/17/2018 Gainesville Building Workflow
9/14/2018 Gainesville Building Workflow
9/13/2018 Gainesville Building Workflow
9/13/2018 Gainesville Building Workflow
9/13/2018 Gainesville Building Workflow
9/12/2018 Gainesville Building Workflow
9/12/2018 Gainesville Building Workflow
BP-18-06405 Comm
Paul Myers
Remodel - Chicken Grill
Unit A
BP-18-06441 - New SFD -Paul Myers
Hidden Lake Lot 41
BP-18-06437 - Comm Chip Howe Alt - Hampton Oaks BLDG I BP-18-06436 - Comm Chip Howe Alt - Hampton Oaks BLDG H BP-18-06434 - Comm Chip Howe Alt - Hampton Oaks BLDG G BP-18-06432 - Comm Chip Howe Alt - Hampton Oaks BLDG F BP-18-06430 - Comm Alt Chip Howe - Hampton Oaks BLDG E
BP-18-05726-02 - Comm Paul Myers Canopy - Wawa
BP-18-06418 Generator Carson Stanton Installation - Stump, Eugene & Ayhan BP-18-06356 - Fuel Tank Paul Myers and Canopy Removal University Citgo BP-18-06376 - Res Alt - Chip Howe (OWNER BUILDER) Beck BP-18-06370 Comm Alt - Robin Rentz Bristol Park Ste 1
BP-18-06369 - New SFD -Robin Rentz GNV CoHousing Lot 11
BP-17-07378-11 - Comm Paul Myers
Generator Install -
Medical Exam Office
BP-18-06289 Res
Chip Howe
Addition - Kannan
Unit A - Changing from pharmacy to restaurant
In Review
New SFD, Heated 1664 sqft/ In Review total 2250 sqft
Replace existing siding with In Review new 1250 SQ. Feet
Replace existing siding with In Review new 1100 SQ. Feet
Replace existing siding with In Review new 1000 SQ. Feet
Replace existing siding with In Review new 450 SQ. Feet
Replace existing siding with In Review new 2000 SQ. Feet
Construction of new 5,280 sqft canopy for wawa gas station install standby generator & transfer switch, gas line
In Review In Review
canopy demo and removal of In Review fuel tanks
building 544 sqft addition to In Review home
cutting new door on non load In Review bearing wall
New SFD 818 heated sqft/ 1184 total sqft
In Review
install generator
In Review
Hip style roof tied into
In Review
existing roof w/ shingles to
match, screen walls, concrete
footers. Fan & egress light
9/11/2018 Gainesville Building Workflow
9/11/2018 Gainesville Building Workflow
9/11/2018 Gainesville Building Workflow
9/11/2018 Gainesville Building Workflow
BP-18-06269 Comm
Paul Myers
Alteration - UF Health
(PAUSED)
BP-18-06266 New SFD - Building Review
Finley Woods Lot 82
complete renovation of existing interior space (Existing Sears - Oaks Mall) New SFD heated sq ft 2760 total sq ft 3571
In Review In Review
BP-18-06243 Res Addition - Jagannath (ATF) BP-18-06176 Res Generator Installaton Rodel
Robin Rentz Carson Stanton
***AFTER THE FACT PERMIT*** Bedroom and bathroom addition Installation of back up generator
In Review In Review
1
10/5/2018 Department
Review
1 10/15/2018 Department Review
1
10/8/2018 Department
Review
1
10/8/2018 Department
Review
1
10/8/2018 Department
Review
1
10/8/2018 Department
Review
1
10/8/2018 Department
Review
1 10/22/2018 Department Review
2 10/10/2018 Review Complete
1 10/17/2018 Department Review
1
10/8/2018 Department
Review
1
10/9/2018 Batch
Stamp
1
10/8/2018 Department
Review
2
10/3/2018 Batch
Stamp
1
10/9/2018 Department
Review
1
9/18/2018 Review
Complete
1 10/12/2018 Department Review
1 10/16/2018 Department Review
2 10/16/2018 Department Review
0 candace@thebluepri
0 natasha@carriganco
0 jinnieb@
0 jinnieb@
0 jinnieb@
0 jinnieb@
0 jinnieb@
0 jessicah@meconstr
0 jcomly@windstream .net
0 ktownsel@aetllc.co m
0 gvbldg@
0 tannerconstructiong roup@
0 timflanco@bellsout
0 mdstate4@bellsout
0 alumatecremodeling @
0 permits@
0 cassi@norfleethome
0 JR042446@GMAIL. COM
0 info@caribbeanelect
Sitewide - All Projects Info Report
9/11/2018 Gainesville Building Workflow
9/7/2018 Gainesville Building Workflow
BP-18-06242 Res Addition (Flood & Historic) - Seaver BP-18-06209 Sign NonElectrical - 1805 - Total Home
Paul Myers Chip Howe
9/6/2018 Gainesville Building Workflow
9/5/2018 Gainesville Building Workflow
9/5/2018 Gainesville Building Workflow
9/4/2018 Gainesville Building Workflow
8/31/2018 Gainesville Building Workflow
BP-18-06179 - New SFD -Paul Myers Abington Oaks Phase 2 Lot 24 BP-18-06141 - Site Work Paul Myers - Saddle Cove
BP-18-06128 - Comm Paul Myers Remodel - Nine Spicy Hotpot BP-18-06096 - New SFD -Paul Myers Fieldman
BP-18-06080 - Res Addition - Vinson
Robin Rentz
8/31/2018 Gainesville Building Workflow
8/29/2018 Gainesville Building Workflow
8/29/2018 Gainesville Building Workflow
8/28/2018 Gainesville Building Workflow
8/28/2018 Gainesville Building Workflow
8/27/2018 Gainesville Building Workflow
8/27/2018 Gainesville Building Workflow
8/27/2018 Gainesville Building Workflow
8/27/2018 Gainesville Building Workflow
BP-18-06023 - Comm Alt Paul Myers - Bubble Tea
BP-18-06022 Sign Electrical - Hairport
Carson Stanton
BP-18-06020 Sign
Carson Stanton
Electrical - Liberty Tax
BP-18-05979 -
Dan Starbuck
Occupancy - Trinity's Day
Spa
BP-18-04844 - Tenant Paul Myers
Build-out - Noire the Nail
Bar
BP-18-05943 - New SFD -Paul Myers
Finley Woods Lot 58
BP-18-05843 - New SFD -Paul Myers Ironwood Diggs
BP-18-05870 New SFD - Paul Myers Finley Woods Lot 87
BP-18-05866 - Res Generator - Floyd
Carson Stanton
8/22/2018 Gainesville Building Workflow
8/22/2018 Gainesville Building Workflow
BP-18-05830 - Comm Demo - Gville Airport
Paul Myers
BP-18-05824 - New SFD -Paul Myers Finley Woods Lot 86
extending detached garage In Review
build a sign with a concrete In Review
base with steel members to
support precast concrete sign
and lettering
Abington Oaks Phase 2 - New In Review
SFD: conditioned 2422 total
2985
Site Work for new office
In Review
remodel for new restaurant In Review
New SFD heated sqft 4631/ In Review total sqft 6874
expanding living room, adding In Review free standing deck in backyard and expanding front porch
Interior Remodeling
In Review
Sign Electrical
In Review
Sign Electrical
In Review
Occupancy
In Review
new tenant improvement for In Review nail salon
New SFD 1892sqft heated/ In Review 2633sqft total
New SFD - heated 1205 sqft/ In Review
total 1456 sqft
****FLOOD****
Finley Woods Lot 87: New In Review
SFD conitioned: 1508 total
2253 sqft
hook up 22kw generator with In Review
200amp transfer switch. gas
will pull and obtain separate
gas permit.
demo and haul off two
In Review
buildings
New SFD - heated: 1714 sqft/ In Review total: 2576 sqft
1 10/15/2018 Department Review
1 10/12/2018 Department Review
1
10/9/2018 Department
Review
1 10/18/2018 Department Review
1 10/17/2018 Department Review
1 10/15/2018 Department Review
1 10/19/2018 Department Review
1
10/2/2018 Batch
Stamp
1 10/16/2018 Department Review
1 10/12/2018 Department Review
2 10/24/2018 Department Review
2 10/12/2018 Department Review
2
10/8/2018 Department
Review
2
10/8/2018 Batch
Stamp
2
10/9/2018 Department
Review
1
10/9/2018 Department
Review
1 10/10/2018 Department Review
2 10/10/2018 Department Review
0 david@customdesig
0 alex@anglin.cfcoxm
0 jfrentzn@bellsouth. net
0 smatthews2785@g
0 fudinconstruction@
0 nic.haylett@gmail.c om
0 shawn@goldenham
0 jayz1046@gmail.co m
0 showntellsigns@gm
0 showntellsigns@gm
0 1ebritt@
0 tektonicainc@aol.co m
0 cassi@norfleethome
0 bkurtzman@alachua
0 ginney@tommywilli
0 tanya@trademarkel
0 annepolo@scherern
0 ginney@tommywilli
Sitewide - All Projects Info Report
8/22/2018 Gainesville Building Workflow
BP-18-05060 -
Carson Stanton
Communication Towers -
Verizon
8/17/2018 Gainesville Building Workflow
8/16/2018 Gainesville Building Workflow
8/13/2018 Gainesville Building Workflow
8/9/2018 Gainesville Building Workflow
8/9/2018 Gainesville Building Workflow
8/8/2018 Gainesville Building Workflow
8/8/2018 Gainesville Building Workflow
8/7/2018 Gainesville Building Workflow
BP-18-05695 - Comm Alt Linda Patrick - LHS Dispensary
BP-18-05682 - New SFD -Paul Myers Frazier
BP-18-05555 - Butler Linda Patrick Town Center, Bldg B Shell BP-18-05493 - Res Deck Chip Howe Contruction (ATF & OB) Silver BP-18-05491 - Comm Alt Paul Myers -Total Home Hardware
BP-18-05462 - Comm Alt Paul Myers - Alachua County Humane Society BP-18-05456 - New SFD -Paul Myers Strawder
BP-18-05443 -
Linda Patrick
Occupancy - Pop A Top
Depot Park Bldg
8/2/2018 Gainesville Building Workflow
8/2/2018 Gainesville Building Workflow
8/1/2018 Gainesville Building Workflow
7/30/2018 Gainesville Building Workflow
7/18/2018 Gainesville Building Workflow
7/17/2018 Gainesville Building Workflow
7/12/2018 Gainesville Building Workflow
7/12/2018 Gainesville Building Workflow
7/12/2018 Gainesville Building Workflow
BP-18-05349 Res Solar Carson Stanton Panels - Cornman
BP-18-05348 Res Solar Carson Stanton Panels - Stofer
BP-18-05286 Interior Buildout New - Village Jeweler BP-18-05257 Comm Remodel - Swamp Boil
Linda Patrick Paul Myers
BP-18-04857 - Interior Buildout New - Opus Coffee Unit 100 BP-18-04906 - Mobile Home Set Up - Whitney Lot 49 BP-18-04880 - Campus Circle bldg 9 Umbrella Pavilion BP-18-04879 - Campus Circle bldg 8 Trash Compactor BP-18-04878 - Campus Circle bldg 7 Maintenance Shed
Linda Patrick Paul Myers Paul Myers Paul Myers Paul Myers
Remove and replace (6)
In Review
antennas, add (3) RRU's, add
(1) OVP, and add (1) Hybrid
Fiber Cable
Interior Build Out for Liberty In Review
Health Sciences
New SFD total sqft 1305, heated sqft 1305
In Review
Building Shell for BTC - Phase In Review B Area
ground wood deck 180 sqft, In Review highest point above ground is 21 inches. (ATF) exterior elevation remodel/ In Review interior remodel.
interior renovation to create more admin offices, exam area, and surgery suite New SFD heated sqft 1205/total sqft 1977
In Review In Review
Pop-a-Top Kitchen Expansion In Review into PreTenant space including Cooking equipment and plumbing work
7.68kw roof mounted solar In Review array
new 3.52 kw roof mounted In Review solar
interior Build out in existing In Review new shell Bldg A, Suite 50
LEVEL 2 ALTERATION Swamp Boil Restaurant
In Review
Interior buildout on 1st floor In Review of 800 Second Bldg Suite 100
Mobile Home Set Up Flood Zone X
In Review
Accessory Structure Commercial
In Review
Accessory Structure Commercial
In Review
Accessory Structure Commercial
In Review
1 10/16/2018 Department Review
2
10/9/2018 Department
Review
2 10/12/2018 Department Review
2 10/10/2018 Department Review
2
10/5/2018 Review
Complete
2 10/12/2018 Department Review
1 10/12/2018 Department Review
1 10/16/2018 Department Review
2
10/5/2018 Department
Review
1 10/22/2018 Department Review
1 10/15/2018 Department Review
1
10/8/2018 Department
Review
2 10/10/2018 Department Review
2 10/12/2018 Department Review
1 10/15/2018 Department Review
1
8/7/2018 Batch
Stamp
1
8/7/2018 Batch
Stamp
2
9/18/2018 Batch
Stamp
0 VERONICA.CARMEA N@ASCENDWIRELE
0 info@
0 sarentz@slconstruct
0 ccobern@
0 woodysil@hotmail.c om
0 ben@anglin.cfcoxm
0 gingerw@jedeckerc
0 mosleybuildersinc@
0 mytop@
0 richie.wilhoit@solari
0 richie.wilhoit@solari
0 info@
0 lzhang22@
0 john@conceptcomp
0 olinstransport@gma
0 bgaherty@bainbridg
0 bgaherty@bainbridg
0 bgaherty@bainbridg
Sitewide - All Projects Info Report
7/12/2018 Gainesville Building Workflow
7/12/2018 Gainesville Building Workflow
7/11/2018 Gainesville Building Workflow
7/9/2018 Gainesville Building Workflow
7/9/2018 Gainesville Building Workflow
BP-18-04877 - Comm New - Campus Circle Gym (bldg 2) BP-18-04876 - Comm New - Campus Circle Clubhouse (bldg 1) BP-18-04738 Sign Electrical - Jacobs
Paul Myers Paul Myers Carson Stanton
BP-18-04733 - The
Dan Starbuck
Zensory Experience -
Occupancy
BP-18-04725 Site Work - Paul Myers
Campus Advantage (DB-
18-00014)
7/3/2018 Gainesville Building Workflow
BP-18-04010 - Res Alt - Chip Howe Thias Properties
6/28/2018 Gainesville Building Workflow
BP-18-04409-01 Campus Paul Myers Circle Apartments (MASTER PLANS)
Commercial New
In Review
Commercial New
In Review
Reverse lit and face lit channel letters
Occupancy
In Review In Review
Site Work - Campus
In Review
Advantage***NEED DEMO
PERMITS*** 18-05931, 5930,
5927
Water heater, heat and range In Review
from gas to electric. New
kitchen and bath, new roof
shingles.
Campus Circle Bldg 3, 4, 5, 6 - In Review
4-Story Apartments R-2/VA
(THRESHOLD) DB-18-00062
6/20/2018 Gainesville Building Workflow
6/13/2018 Gainesville Building Workflow
6/7/2018 Gainesville Building Workflow
6/1/2018 Gainesville Building Workflow
4/26/2018 Gainesville Building Workflow
3/16/2018 Gainesville Building Workflow
2/6/2018 Gainesville Building Workflow
12/28/2017 Gainesville Building Workflow
7/20/2017 Gainesville Building Workflow
BP-18-04225 New Comm Linda Patrick - Perm-a-Fix Tank Farm
BP-18-04062 - Comm Paul Myers Rem - 39th Ave - Bldg D Units 25-32
BP-18-03917 Res Alt - Chip Howe Boose
BP-18-03732-01 - Comm Paul Myers New - Zion Lutheran Church BP-18-02793 Comm Alt - Paul Myers Working Foods
BP-18-01808 Sign
Carson Stanton
Electrical - Fairfield Inn
Monument Sign
BP-17-04559 One
Paul Myers
College Park - Phase 1A -
Mixed Use & Dorm Area
BP-17-08137 Site Work - Paul Myers
Integra 24 (DB-17-
00072)
Testing Default Owner Gael Baughman
Commercial New Perm-a-Fix Masonry Wall & Holding Tanks ***(Flood)*** Bldg D - Units 25-32 replacing water damaged wood on the balconies in the rear Remodel 1 and 2 Family ***FLOOD***
In Review In Review In Review
construction of a new church In Review
building, connecting walkways
and parking areas
Add Kitchen area to Existing In Review
Assembly Use & Location
approval only for Ext. Cooler
Sign Electrical
In Review
Commercial Remodel
In Review
sitework
In Review
Testing BLDG Owner
In Review
3 10/15/2018 Department Review
3 10/19/2018 Department Review
3
10/8/2018 Review
Complete
1 10/26/2018 Department Review
1
7/18/2018 Batch
Stamp
1
10/8/2018 Department
Review
3
10/8/2018 Department
Review
2 10/12/2018 Department Review
1
7/2/2018 Batch
Stamp
1 10/23/2018 Department Review
5 10/10/2018 Department Review
1
10/5/2018 Review
Complete
1 10/18/2018 Department Review
2
10/4/2018 Department
Review
1
7/11/2018 Department
Review
1
7/24/2018 Department
Review
0 bgaherty@bainbridg
0 bgaherty@bainbridg
0 service@gainesville
0 thezensoryexperien ce@
0 grantcurtan@coreco
0 macombsenterprise sllc@
0 bgaherty@bainbridg
0 ryan@rmurphyllc.co m
0 josh@americanmeta
0 cherokee_boose@li
0 qualitylinehomes@a
0 info@
0 billy@gainesvilleneo
0 astrickland@
0
0
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
- re max realty group
- how to complete your validated biometric screening blood
- for lease loopnet
- baycare surgery center trinity ameripath a quest
- florida blue provider lisiting for urgent care walk in
- sitewide custom all projects info report 1
- appointmen 1 888 277 8772 24 hours
- florida blue blue options provider lisiting for urgent
- important phone numbers naples nephrology
- raising the minimum wage to 15 00 per hour and its effect
Related searches
- all minecraft crafting recipes 1.14
- all crafting recipes minecraft 1.14
- all minecraft crafting recipes 1.13
- all minecraft crafting recipes 1 14
- info on type 1 diabetes
- all crafting recipes minecraft 1 14
- all crafting recipes mod 1 12 2
- all minecraft crafting recipes 1 13
- all minecraft crafting recipes 1 15
- all recipes in minecraft 1 14 4
- all potions in minecraft 1 14
- all of the amendments 1 27