Project Cost Estimate U.S. Department of Housing and Urban ...

Project Cost Estimate

U.S. Department of Housing

and Urban Development Office of Housing Federal Housing Commissioner

OMB Approval No. 2502-0029 (Exp. 09/30/2016)

Public Reporting Burden for this collection of information is estimated to average 4 hours per response, including the time foreviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. This agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless that collecton displays a valid OMB control number.

This information is being collected under Public Law 101-625 which requires the Department of to implement a system for mortgage insurance for mortgages insured under Sections 207,221,223,232, or 241 of the National Housing Act. The information will be used by HUD to approve rents, property appraisals, and mortgage amounts, and to execute a firm commitment. Confidentiality to respondents is ensured if it would result in competitive harm in accord with the Freedom of Information Act (FOIA) provisions or if it could impact on the ability of the Department's mission to provide housing units under the various Sections of the Housing legislation.

Effective Cost Date(mm/dd/yyyy) Name of Project Type of Project Building Identification Number of Buildings Structural System Exterior Finish Major Type of Foundation Gross Land Area and SF Cost

Source

Project No. Location

Section of Act

Number of Stories

Number of Units, Beds, Facilities

Floor Sys. (Structural)

2nd

3rd

Number of Basements

Accessory Structure(s)

Comparable Data Bank Projects

Net and Gross Floor Areas

Total Gross Floor Area Net Residential Net Commercial Net Basement & Storage Net Garage (Built-In) Net Lobby

Trade Item Div.

3 Concrete 4 Masonry 5 Metals 6 Rough Carpentry 6 Finish Carpentry 7 Waterproofing 7 Insulation 7 Roofing 7 Sheet Metal 8 Doors 8 Windows 8 Glass 9 Lath and Plaster 9 Drywall 9 Tile Work 9 Acoustical 9 Wood Flooring 9 Resilient Flooring 10 Painting and Decorating 10 Specialties 10 Special Euipment 11 Cabinets 11 Appliances 12 Blinds, Shades & Artwork 12 Carpets 13 Special Construction 14 Elevators 15 Plumbing and Hot Water 15 Heat and Ventilation 15 Air Conditioning 16 Electrical Subtotal (Structures)

Previous versions obsolete

Estimated Cost

$

Col. B

Gross S.F. Cost

Net Halls, Stairs, Elevators

Net

Net

Net

Residual Areas

Col. C

per Unit Cost

L

% of

i n

Total

e

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

100%

32

Page 1 of 2

Miscellaneous Areas (Cost Reflected in Total for all

Improvements)

Description & Area

Dollar Amount

$

$

$

$

$

$

Building Composition

Gar.

C.P.

Baths

Eff.

1-Br

2-Br

.

3-Br

4-Br

5-Br

Onsite Special Exterior Land Improvement

Description

Cost

Total $

Cost Not Attributable

Description

Cost

Total $ form HUD-92326 (03/2003)

Trade Item Div.

Estimated Cost

Accessory Structures

Total (Lines 32 & 33)

$

2 Earthwork

2 Site Utilities

2 Roads and Walks

2 Site Improvements

2 Lawns and Planting

2 Unusual Site Conditions

Total (Land Improvements)

$

Total (Lines 34 & 41) "A"

$

1 General Requirements

Subtotal (Lines 42 & 43)

$

Builder's Overhead

Builder's Profit

Subtotal (Lines 44 thru 46)

$

Architect Fee (Prior to Const.)

Architect Fee (During Const.)

Other Fees

Bond Premium

Subtotal (Lines 45, 46, 48 thru 51)

$

Total for all Improvements (Lines 44 & 52)

*S.F. Costs Based on Gross Land Area

Estimate Prepared by

Estimate Reviewed by

Col. B

Gross S.F. Cost

Col. C

per Unit Cost

Date(mm/dd/yyyy) Date(mm/dd/yyyy)

L

% of

i n

Total

e

Miscellaneous Areas (Cost Reflected in Total for all

Improvements)

33 B $

=

%

34 A $

35 Cost Per Unit, Bed, Facility

36

$

37 Gross Area

38 Unit, Bed, Facility

S.F.

39 Offsite Costs

40

Description

Cost

100% 41

42

% 43

44

Total $

% 45

Demolition

% 46

Description

Cost

47

% 48

% 49

Total $

% 50

Other Fees

% 51

Description

Cost

52

53

Total $

Previous versions obsolete

Page 2 of 2

form HUD-92326 (03/2003)

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download