This solicitation has been awarded to the following vendor(s):

Vendor Name ATLANTIC CONTROL SYSTEMS, INC

PO Number 3395914

Plumbing Services - Rhode Island Collge: 10/1/2014 - 9/30/2017

Scope of Work:

Provide all materials, equipment, tools to make varied plumbing repairs and perform preventative maintenance to eight (8) water main booster pumps including inspection greasing, and cycling of pumps.

Labor Requirements: The vendor shall charge hourly labor rates based on three (3) different category levels;

1) Hourly rate for repairs: Regular hourly rate on site and Overtime hourly rate on site. Both regular and overtime hourly rate shall be considered Public Works per Rhode Island General Laws 37-13-1, and therefore the awarded vendor shall be required to pay his/her employees the applicable prevailing wage rate.

2) Preventative Maintenance does not apply to Public Works requirements.

3) Equipment and Operator: The vendor shall bid additional labor rates for Equipment Operator and Truck Driver to account for hourly labor to be paid at the prevailing wage. Equipment Operator and Truck Drive labor rates shall only apply when the work performed requires operation of the listed equipment items and the work performed pertains to the public works construction per RI General Laws 37-13-1.

The line items in the bid section designate categories for labor and prevailing wage requirements.

Vendor

LINE

DESCRIPTION

10/1/2014 - 6/30/2015: Plumbing Repairs - Master Plumber Labor rate,

1 regular hourly rate on site. (Prevailing Wage)

7/1/2015 - 6/30/2016: Plumbing Repairs Master Plumber Labor rate,

2 regular hourly rate on site. (Prevailing Wage)

7/1/2016 - 9/30/2017: Plumbing Repairs Master Plumber Labor rate,

3 regular hourly rate on site. (Prevailing Wage)

10/1/2014 - 6/30/2015: Plumbing Repairs Master Plumber Labor rate,

4 overtime hourly rate on site. (Prevailing Wage)

7/1/2015 - 6/30/2016: Plumbing Repairs Master Plumber Labor rate,

5 overtime hourly rate on site. (Prevailing Wage)

7/1/2016 - 9/30/2017: Plumbing Repairs Master Plumber Labor rate,

6 overtime hourly rate on site. (Prevailing Wage)

10/1/2014 - 6/30/2015: Equipment Operator regular rate on site

7 (Prevailing Wage) see "Labor Requirements" above.

7/1/2015 - 6/30/2016: Equipment Operator regular rate on site

8 (Prevailing Wage) see "Labor Requirements" above.

7/1/2016 - 9/30/2017: Equipment Operator regular rate on site

9 (Prevailing Wage) see "Labor Requirements" above.

10/1/2014 - 6/30/2015: Equipment Operator overtime rate on site

10 (Prevailing Wage) see "Labor Requirements" above.

7/1/2015 - 6/30/2016: Equipment Operator overtime rate on site

11 (Prevailing Wage) see "Labor Requirements" above.

7/1/2016 - 9/30/2017: Equipment Operator overtime rate on site

12 (Prevailing Wage) see "Labor Requirements" above.

QTY 1800 2000 2200 1500 1800 2000 1000 1100 1200 700 700 700

Atlantic Control Systems Inc.

UNIT

UNIT PRICE

TOAL

HOUR

102.9 $ 185,220.00

HOUR

104.9 $ 209,800.00

HOUR

106.9 $ 235,180.00

HOUR

102.9 $ 154,350.00

HOUR

104.9 $ 188,820.00

HOUR

106.9 $ 213,800.00

HOUR

68.9 $ 68,900.00

HOUR

70.9 $ 77,990.00

HOUR

72.9 $ 87,480.00

HOUR

68.9 $ 48,230.00

HOUR

70.9 $ 49,630.00

HOUR

72.9 $ 51,030.00

10/1/2014 - 6/30/2015: Truck Driver regular rate on site (Prevailing

13 Wage) see "Labor Requirements" above.

1000

7/1/2015 - 6/30/2016: Truck Driver regular rate on site (Prevailing Wage)

14 see "Labor Requirements" above.

1100

7/1/2016 - 9/30/2017: Truck Driver regular rate on site (Prevailing Wage)

15 see "Labor Requirements" above.

1200

10/1/2014 - 6/30/2015: Truck Driver overtime rate on site (Prevailing

16 Wage) see "Labor Requirements" above.

700

7/1/2015 - 6/30/2016: Truck Driver overtime rate on site (Prevailing

17 Wage) see "Labor Requirements" above.

700

7/1/2016 - 9/30/2017: Truck Driver overtime rate on site (Prevailing

18 Wage) see "Labor Requirements" above.

700

10/1/2014 - 6/30/2015: Quarterly Preventative Maintenance to eight (8)

water main booster pumps, including inspection, greasing and cycling of

19 pumps.

3

7/1/2015 - 6/30/2016: Quarterly Preventative Maintenance to eight (8)

water main booster pumps, including inspection, greasing and cycling of

20 pumps.

3

7/1/2016 - 9/30/2017: Quarterly Preventative Maintenance to eight (8)

water main booster pumps, including inspection, greasing and cycling of

21 pumps.

3

HOUR HOUR HOUR HOUR HOUR HOUR

EACH

EACH

EACH

Required Equipment: Please provide a preice per equipment typr/per the individual time periods specified. For the purpose of evaluating the bid, an extended bid price for the mini excavator at 15 dyas and the backhoe at 1 hour will be used as a sample pricing. 22 Mini Excavator (must be capable of digging and grading areas)

? price per hour $50.00 ? price per day $400.00 Skid Steer Loader ? price per hour $50.00 ? price per day $400.00 Tractor w/ front end loader, 1 yard bucket ? price per hour $80.00 ? price per day $960.00 Dump Truck - 6-8 yard capacity or greater ? price per hour $60.00 ? price per day $480.00 Trailer to haul materials and equipment ? price per hour $30.00 ? price per day $240.00 Backhoe (minimum requirement 90 hp w 1.5 yard bucket) ? price per hour $80.00 ? price per day $960.00

10/1/2014 - 9/30/2017: Parts at Manufacturers list price LESS 0 %

15

days

1 HOUR

68.9 $ 68,900.00 70.9 $ 77,990.00 72.9 $ 87,480.00 68.9 $ 48,230.00 70.9 $ 49,630.00 72.9 $ 51,030.00 1900 $ 5,700.00 1900 $ 5,700.00 1900 $ 5,700.00

400 $ 6,000.00

80 $

80.00

0%

................
................