I-4 Beyond the Ultimate Stay Informed: 844-ULT-INFO (858 ...
I-4 Beyond the Ultimate
Stay Informed:
?
?
?
?
?
Current and Future Construction Projects
as of August 2020
7
Project Hotline: 844-ULT-INFO (858-4636)
Sign up for email and text alerts at alerts
Subscribe to our monthly newsletter at news
Follow us on Twitter at i4Ultimate
Subscribe to our YouTube channel at i4Ultimate
Current I-4 Beyond the Ultimate North Construction Projects
44
(see reverse for I-4 Beyond the Ultimate South)
6
1
E.E. Williamson Rd. Bridge Reconstruction at I-4
I-4 Beyond the Ultimate NORTH
Lake County
Volusia County
The widening of I-4 requires a rebuild of the E.E. Williamson Road overpass.
Project Start
September 2019
472
2
17
Deltona
3
4
3
5
1
4
Longwood
I-4 Ultimate
434
Apopka
Wekiva Pkwy. (S.R. 429)
Project Start
October 2018
Wrong Way Driving Detection Orlando
Signs,
6
Bundle A
50
408 will install wrong-way driving countermeasures on
This project
408
off-ramps at the following I-4 interchanges: Lake Mary
Blvd.,
435
C.R. 46A, S.R. 46, U.S. 17-92, Dirksen Drive, and Saxon Blvd.
Construction
anticipated in fall
or Phillips
2020 482
Expected Completion
Late 2022
FPID No.
240200-4
Seminole County
Future Construction Projects
Project Start
FPID No.
439682-1
Section 8 of the Wekiva Pkwy. project will build 2.63 miles of limited-access toll road from
Orange Blvd. to east of Rinehart Road. This section will include the new interchange at I-4 that
will connect with S.R. 417.
436
5
Expected Completion
Early 2021
Other I-4 Construction Projects
417
17-92
FPID No.
439682-3
Repaving WB I?4 between from the Seminole-Volusia county line to
Lake Mary Blvd.
Project Start
June 2020
Lake Mary
2
Expected Completion
Summer 2021
Project involves milling and resurfacing WB I-4 from the Seminole-Volusia county line to Lake
Mary Blvd. Project excludes the section of WB I?4 between County Road (C.R.) 46A and State
Road (S.R.) 46 that will be improved during construction of the Wekiva Pkwy.
Sanford
46A
Wekiva
Parkway
EB I-4 Auxiliary Lane from I-4 Ultimate to Lake Mary Blvd.
Project Start
September 2019
46
FPID No.
439682-4
Project includes adding an EB I-4 auxiliary lane, and milling and resurfacing EB I-4 from the
I-4 Ultimate project limits to the EB I-4 exit to Lake Mary Blvd.
DeBary
429
Expected Completion
Summer 2021
Wrong Way Driving Detection Signs,
50
Bundle B
Repaving I-4 from west of Summit Avenue
7 (C.R. 4139) to S.R. 44
This project will install wrong-way driving countermeasures on
off-ramps at the following I-4 interchanges: S.R. 472, Orange
Camp Road, S.R. 44, and U.S. 92.
Expected
Completion
FPID No.
Project Start
TBD441
446159-1
Construction
anticipated in
spring 2021
This project will mill and resurface an approximate 1.5-mile
section of I-4 in Volusia County.
Expected
Completion
FPID No.
Project Start
TBD
446159-2
Construction
anticipated in
summer 2021
Expected
Completion
FPID No.
TBD
434411-1
528
Sign up for I-4 Construction Alerts from the I-4 Beyond the Ultimate,
I-4 Ultimate, and Wekiva Parkway at alerts
a
4159-20210210
535
? Florida Department of Transportation
Learn more about current and future I-4 Beyond the
Ultimate construction projects at
Last Updated 2/10/2021
436
I-4 Beyond the Ultimate
Stay Informed:
?
?
?
?
?
Current and Future Construction Projects
as of August 2020
Project Hotline: 844-ULT-INFO (858-4636)
Sign up for email and text alerts at alerts
Subscribe to our monthly newsletter at news
Follow us on Twitter at i4Ultimate
Subscribe to our YouTube channel
at i4Ultimate
Seminole
County
Future I-4 Beyond the Ultimate South Construction
Projects (see reverse forOrlando
I-4 Beyond the Ultimate North)
I-4 Ultimate
50
1 Championsgate50Interchange Improvements
408
A diverging diamond interchange is being designed for the I-4 and County Road
408
(C.R.) 532 interchange.
435
429
Project Start
Expected Completion
FPID No.
Construction anticipated in summer 2021
TBD
444187-1
EB/WB I-4 New Auxiliary Lanes Between S.R. 429 and
2 C.R. 532
441
Doctor Phillips
5
482
4
535
Orange County
417
Osceola County
Project Start
Expected Completion
FPID Nos.
Construction anticipated in fall 2021
TBD
444329-1,
443958-1
3 Daryl Carter Pkwy. and I-4 Interchange
3
Lake Buena
Vista
I-4 Beyond the Ultimate SOUTH
528
New auxiliary lanes are proposed on I-4: one in each direction between the S.R.
429 and C.R. 532 ramps and another on NB S.R. 429 between I-4 and Sinclair
Road. Project also includes milling and resurfacing EB and WB I-4 from the PolkOsceola county line to west of S.R. 417.
192
Three new ramps will connect I-4 to Daryl Carter Pkwy. These include exit
ramps from both directions of I-4 and an entrance ramp to EB I-4. Project will
also convert the existing Daryl Carter Pkwy. overpass to a diverging diamond
interchange.
Project Start
Expected Completion
FPID No.
Construction anticipated in late 2021
TBD
441113-1
4 Wrong Way Driving Detection Signs, Bundle A
Celebration
429
Kissimmee
27 Championsgate
1
This project will install wrong-way driving countermeasures on off-ramps at
the following I-4 interchanges: Central Florida Parkway and Sand Lake Road
(S.R. 482).
2
17
532
Project Start
Expected Completion
FPID No.
Construction anticipated in fall 2020
TBD
446159-1
Sand Lake Road (S.R. 482) and192
I-4 Interchange
lk
Po
5 Improvements
ty
un
Co
The interchange will be reconfigured into a diverging diamond. Left turns from
WB Sand Lake Road to SB Turkey Lake Road will be eliminated. Instead, access to
Turkey Lake Road will be via a new loop ramp.
Project Start
Expected Completion
FPID No.
Construction anticipated in spring 2022
TBD
444315-1
Persons with disabilities who require accommodations under the Americans with Disabilities Act or persons who require translation services (free of charge) should contact Su Hao, P.E., FDOT Project
Manager, at 386-943-5161, or by email at Su.Hao@dot.state.fl.us. If you are hearing or speech impaired, please contact us by using the Florida Relay Service, 1-800-955-8771 (TDD) or 1-800-955-8770 (Voice).
Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons wishing to express their concerns relative to FDOT compliance with
Title VI may do so by contacting Jennifer Smith, FDOT District Five Title VI Coordinator at Jennifer.Smith2@dot.state.fl.us.
4159-20210210
? Florida Department of Transportation
Last Updated 2/10/2021
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
- central florida expressway authority cfx
- capital circle office complex florida department of
- transpðña departmen fpot i er erprise o ned d þyth
- florida city index florida back roads travel
- the northern turnpike connector citrus levy marion and
- florida electric vehicle roadmap
- florida s toll roads and bridges
- florida department of transportation florida s turnpike
- i 4 beyond the ultimate stay informed 844 ult info 858
- campus map and parking guide university of central florida
Related searches
- the cleaner the ultimate body detox
- the ultimate monthly dividend portfolio
- suze orman the ultimate retirement guide
- the ultimate retirement calculator
- beyond the sea of ice
- beyond the ice limit book
- beyond the ice limit
- beyond the ice limit preston
- the ultimate good aristotle
- what lies beyond the universe
- beyond the observable universe
- beyond the ordinary meaning