Quality Assurance Plan / U.S. Department of ...



[pic]

QUALITY

ASSURANCE

PLAN

Project or System Name

U.S. Department of Housing and Urban Development

Month, Year

Revision Sheet

|Release No. |Date |Revision Description |

|Rev. 0 |5/30/00 |Quality Assurance Plan Template and Checklist |

|Rev. 1 |6/13/00 |New section 2.0 (Task and Responsibilities) and additional text in section 3.1 |

|Rev. 2 |4/12/02 |Conversion to WORD 2000 format |

| | | |

| | | |

| | | |

| | | |

| |Quality Assurance Plan Authorization |

| |Memorandum |

I have carefully assessed the Quality Assurance Plan for the (System Name). This document has been completed in accordance with the requirements of the HUD System Development Methodology.

MANAGEMENT CERTIFICATION - Please check the appropriate statement.

______ The document is accepted.

______ The document is accepted pending the changes noted.

______ The document is not accepted.

We fully accept the changes as needed improvements and authorize initiation of work to proceed. Based on our authority and judgment, the continued operation of this system is authorized.

_______________________________ _____________________

NAME DATE

Project Leader

_______________________________ _____________________

NAME DATE

Operations Division Director

_______________________________ _____________________

NAME DATE

Program Area/Sponsor Representative

_______________________________ _____________________

NAME DATE

Program Area/Sponsor Director

QUALITY ASSURANCE PLAN

TABLE OF CONTENTS

Page #

1.0 GENERAL INFORMATION 1-1

1.1 Purpose 1-1

1.2 Scope 1-1

1.3 System Overview 1-1

1.4 Project References 1-2

1.5 Acronyms and Abbreviations 1-2

1.6 Points of Contact 1-2

1.6.1 Information 1-2

1.6.2 Coordination 1-2

2.0 SCHEDULE OF TASKS AND RESPONSIBILITIES 2-1

3.0 SYSTEM DOCUMENTATION 3-1

3.1 Documents by Phase 3-1

3.1.1 Initiate Phase 3-1

3.1.2 Define Phase 3-1

3.1.3 Design Phase 3-2

3.1.4 Build Phase 3-2

3.1.5 Evaluate Phase 3-2

3.1.6 Operate Phase 3-2

3.2 Discipline for Documentation Standard Practices 3-3

4.0 REVIEWS AND AUDITS 4-1

4.1 Review Process 4-1

4.2 Formal Reviews and Audits 4-1

4.2.1 Lifecycle Reviews 4-1

4.2.2 Audits 4-1

4.3 Informal Reviews 4-2

4.4 Review Reports 4-2

4.5 Review and Audit Metrics 4-2

5.0 TESTING 5-1

6.0 PROBLEM REPORTING AND CORRECTIVE ACTION 6-1

6.1 Problem/Issue Documentation 6-1

6.2 Report Metrics 6-1

7.0 TOOLS 7-1

8.0 PROJECT CONTROLS 8-1

8.1 Product Control 8-1

8.2 Supplier Control 8-1

9.0 TRAINING 9-1

1.0 GENERAL INFORMATION

NOTE TO AUTHOR: Highlighted, italicized text throughout this template is provided solely as background information to assist you in creating this document. Please delete all such text, as well as the instructions in each section, prior to submitting this document. ONLY YOUR PROJECT-SPECIFIC INFORMATION SHOULD APPEAR IN THE FINAL VERSION OF THIS DOCUMENT.

This Quality Assurance Plan (QAP) presents a framework for activities, which when followed, will ensure delivery of quality products and services. The SDM provides the project standards and procedures to be used as the basis for the QA group's reviews and audits.

GENERAL INFORMATION

1 1.1 Purpose

Describe the purpose of the Quality Assurance Plan.

2 1.2 Scope

Describe the scope of the Quality Assurance Plan as it relates to the project.

3 1.3 System Overview

Provide a brief system overview description as a point of reference for the remainder of the document. In addition, include the following:

1. Responsible organization

2. System name or title

3. System code

4. System category

1. Major application: performs clearly defined functions for which there is a readily identifiable security consideration and need

2. General support system: provides general ADP or network support for a variety of users and applications

5. Operational status

3. Operational

4. Under development

6. System environment and special conditions

4 1.4 Project References

Provide a list of the references that were used in preparation of this document. Examples of references are:

7. Previously developed documents relating to the project

8. Documentation concerning related projects

9. HUD standard procedures documents

10. Quality Assurance Guidelines

5 1.5 Acronyms and Abbreviations

Provide a list of the acronyms and abbreviations used in this document and the meaning of each.

6 1.6 Points of Contact

1 1.6.1 Information

Provide a list of the points of organizational contact (POCs) that may be needed by the document user for informational and troubleshooting purposes. Include type of contact, contact name, department, telephone number, and e-mail address (if applicable). Points of contact may include, but are not limited to, helpdesk POC, development/maintenance POC, and operations POC.

2 1.6.2 Coordination

Provide a list of organizations that require coordination between the project and its specific support function (e.g., installation coordination, security, etc.). Include a schedule for coordination activities.

2.0 SCHEDULE OF TASKS AND RESPONSIBILITIES

SCHEDULE OF TASKS AND RESPONSIBILITIES

Based on the tasks described in your Project Plan, provide a schedule of the QA activities for the duration of the project. Tasks may include, but are not limited to, those listed below. (Refer to the Quality Assurance Guidelines in the SDM for a complete description of these tasks.) A waiver exempting the project from any of these tasks is required.

11. Identify Standards and Guidelines

12. Evaluate Software Tools

13. Evaluate Facilities

14. Evaluate Software Products Review Process

15. Evaluate Project Planning, Tracking, and Oversight Processes

16. Evaluate Requirements Analysis Process

17. Evaluate Design Process

18. Evaluate Code and Unit Testing Process

19. Evaluate Integration Testing Process

20. Evaluate Acceptance Testing Process

21. Evaluate Release Process

22. Evaluate the Corrective Action Process

23. Evaluate Media Certification Process

24. Certify Non-deliverable Software

25. Evaluate Storage and Handling Process

26. Evaluate Deviations and Waivers Process

27. Evaluate Configuration Management Process

28. Evaluate Software Development Library Control Process

29. Evaluate Non-developmental Software

30. Perform Configuration Audits

31. Evaluate Risk Management Process

3.0 SYSTEM DOCUMENTATION

SYSTEM DOCUMENTATION

This section describes all documentation that will be generated, by lifecycle phase, for the project. The identified documentation listed will be that which control the development, verification and validation, use and maintenance of the software.

1 3.1 Documents by Phase

List and briefly describe the documentation expected to be produced during this project. Depending on the size of your project, this may include, but is not limited to, the documents in the following subsections. (Note that some of the documents listed below are updated in subsequent phases.) The HUD SDM Documentation Standards lists the objectives for producing standardized system documentation. The QAP may include any other deliverables cited in the project Work Breakdown Structure (WBS).

1 3.1.1 Initiate Phase

32. Needs Statement

33. Project Plan (including WBS)

34. Configuration Management Plan

35. Quality Assurance Plan

36. Feasibility Study

37. Cost/Benefit Analysis

38. Risk Analysis

2 3.1.2 Define Phase

39. System Support and Acquisition Plan (initial)

40. Functional Requirements Document

41. Data Requirements Document

42. System Security and Privacy Plan

43. Internal Audit Plan

44. Project Plan (updated)

3 3.1.3 Design Phase

45. System/Subsystem Specifications

46. Database Specifications

47. Program Specifications

48. System Support and Acquisition Plan (final)

49. Validation, Verification, and Testing Plan (initial)

50. Training Plan (initial)

51. Project Plan (updated)

4 3.1.4 Build Phase

52. Installation and Conversion Plan (initial)

53. Test Plan

54. User’s Manual

55. Operations Manual

56. Maintenance Manual

57. Validation, Verification, and Testing Plan (final)

58. Training Plan (final)

59. Project Plan (updated)

5 3.1.5 Evaluate Phase

60. Test Results and Evaluation Reports

61. Installation and Conversion Plan (final)

62. Project Plan (updated)

6 3.1.6 Operate Phase

63. Pilot Test Results

64. Training Material

65. Project Plan (updated)

2 3.2 Discipline for Documentation Standard Practices

Describe the criteria that will be applied during review and evaluation of all lifecycle documents. If HUD documentation standard templates are not used in the creation of project documents, describe the alternative. A waiver exempting the project from standard template usage is required.

4.0 REVIEWS AND AUDITS

REVIEWS AND AUDITS

This section discusses quality assurance’s role in the reviews and audits that will be conducted during the lifecycle of the project to ensure the quality, consistency, comprehension, and completeness of the project documentation and activities.

1 4.1 Review Process

Define the steps of the review process and the procedures that will be used to conduct reviews. Address management and attendee responsibilities with respect to the review process.

2 4.2 Formal Reviews and Audits

This subsection addresses the formal, scheduled reviews and audits that will be conducted on the project. Reviews are a monitoring mechanism to assess the progress and well being of the project.

1 4.2.1 Lifecycle Reviews

Identify the types of SDM associated lifecycle or non-lifecycle reviews that will be conducted within each project lifecycle phase. Include a schedule of reviews and include how the results of each review will be used on the project. Typically, the lifecycle reviews include:

66. Requirements Review

67. Preliminary Design Review

68. Specification Review

69. Design Review

70. Critical Design Review

71. Test Readiness Review

72. Formal Qualification Review

73. Production Readiness Review

74. Acceptance Test Review

75. Post-Implementation Review

2 4.2.2 Audits

Describe the audits that will be conducted on the project and when they will be scheduled. Audits are independent examinations of a deliverable or a set of deliverables. Audits are accomplished by comparing the actual characteristics of a deliverable with those required or specified.

3 4.3 Informal Reviews

Outline the types of informal reviews that will be conducted. Types of reviews may include walkthroughs, desk check codes, peer reviews, and quality control reviews.

4 4.4 Review Reports

Identify QA reports that will be produced throughout the project lifecycle and their uses. These reports may include:

76. Review issues list

77. Review summary report

78. Action tracking report

5 4.5 Review and Audit Metrics

Describe the metrics that will be used to capture management information, and how they will be analyzed and reported.

5.0 TESTING

TESTING

Identify the roles and responsibilities of the QA function in relation to testing throughout the various stages of the project. These include but are not limited to:

79. Unit testing

80. System testing

81. Integration testing

82. Regression testing

83. Acceptance testing

6.0 PROBLEM REPORTING AND CORRECTIVE ACTION

PROBLEM REPORTING AND CORRECTIVE ACTION

Discuss QA responsibilities and activities concerned with the reporting and tracking of project-related problems and resolutions.

1 6.1 Problem/Issue Documentation

Explain how problems and issues will be documented.

2 6.2 Report Metrics

Describe how metrics from the above reports will be collected and analyzed to determine and coordinate corrective actions.

7.0 TOOLS

TOOLS

This section discusses QA responsibilities and activities concerned with the reporting and tracking of project related problems and resolutions.

Describe the tools that will be used for QA and the methodology employed to implement usage of the mentioned tools. The tools may include, but are not limited to:

84. Operating system utilities

85. Debugging aids

86. Documentation tools

87. Code and structure analyzers

88. Monitors

89. Statistical analysis packages

90. Static or dynamic test tools

8.0 PROJECT CONTROLS

PROJECT CONTROLS

1 8.1 Product Control

Identify how QA will monitor the methods and tools used to maintain and store controlled versions of system products.

2 8.2 Supplier Control

Describe the provisions for assuring that products provided by suppliers meets established requirements. In some cases, projects do not foresee purchasing certain products. If that is the case, the following paragraph may be used:

All supplier products have been operationally tested in the target system. No future product acquisition is planned.

9.0 TRAINING

TRAINING

Identify the training activities that will be provided to meet the needs of QA on this project. Suggested training may include:

91. Project orientation on roles, responsibilities, and quality assurance staff authority

92. Software engineering skills and practices

93. Project standards, procedures, and methods

94. Understanding and using automated tools

95. Interpersonal communications

................
................