RWJ 7th Edition Solutions - Colby College

We would accept the project if cost savings were $400,000, and reject the project if the cost savings were $300,000. The required pretax cost savings that would make us indifferent about the project is the cost savings that results in a zero NPV. The NPV of the project is: ................
................