Pennsylvania Department of Transportation



Historic Bridge Rehabilitation AnalysisTABLE OF CONTENTSLIST OF FIGURES AND TABLESAPPENDICESINTRODUCTIONProject LocationCounty FORMTEXT ?????Municipality FORMTEXT ?????State Route/Local Road FORMTEXT ?????Location Description FORMTEXT ?????Bridge InformationOwner FORMTEXT ?????Year Built FORMTEXT ?????Bridge Type FORMTEXT ?????Bridge Length FORMTEXT ?????Number of Spans FORMTEXT ?????Length of Main Span FORMTEXT ?????Deck Width FORMTEXT ?????Additional Information FORMTEXT ?????Historic SignificancePriority Level FORMTEXT ?????NHRP Criterion FORMTEXT ????? due to FORMTEXT ?????PROJECT LOCATION MAPROADWAY AND SITE INFORMATIONType of ServiceNumber of Lanes FORMTEXT ?????Approach Width(s) FORMTEXT ?????Vertical Clearance FORMTEXT ?????Horizontal Clearance FORMTEXT ?????Traffic DataADT FORMTEXT ?????Year FORMTEXT ?????Truck % FORMTEXT ?????Shoulder Width FORMTEXT ?????Functional Classification FORMTEXT ?????Crash HistorySafety Features or DeficienciesBypass ProximitySummary of Performance and Any Geometric or Hydraulic DeficienciesLand Use and Any Anticipated ChangesIdentification of Other Resources in the Project Area or APECONDITION AND LOAD SUFFICIENCY INFORMATIONBMS Condition Code RatingsLoad Rating FORMTEXT ?????Load Posting FORMTEXT ?????Summary of Structural DeficienciesClearly, yet concisely, describe the deficiencies of the structure FORMTEXT ?????PROJECT DETOUR MAPPROJECT PURPOSE AND NEED-472440256540Purpose statement and bulleted list of Need(s) only. The full Purpose and Need document can be saved in Appendices.00Purpose statement and bulleted list of Need(s) only. The full Purpose and Need document can be saved in Appendices.Purpose FORMTEXT ?????Need FORMTEXT ?????3200401203960This should focus on whether the bridge can be rehabilitated to meet the Purpose and Needs while also meeting Secretary of the Interior standards. Do not discuss other alternatives in this report. That will be discussed as part of Section 4(f).00This should focus on whether the bridge can be rehabilitated to meet the Purpose and Needs while also meeting Secretary of the Interior standards. Do not discuss other alternatives in this report. That will be discussed as part of Section 4(f).REHABILITATION ANALYSISCONCLUSIONRehabilitation Option Purpose /NeedSOI StandardsCost Estimate*Comments*If the analysis determines that the bridge cannot be rehabilitated to meet the SOI standards AND meet the project’s Purpose & Need, then cost estimates should not be provided (as there is no design, a cost estimate ultimately cannot be generated).If the analysis determines that the bridge can be rehabilitated to meet the SOI standards AND meet the project’s Purpose & Need, then a cost analysis should be provided; however, no judgment on those costs should be made. In other words, do not state an opinion on whether those costs are reasonable/feasible/cost effective, etc.APPENDICES(…Purpose and Need document, photographs, relevant correspondence, etc.) ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download