DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL ...

DEPARTMENT OF THE NAVY

OFFICE OF THE CHIEF OF NAVAL OPERATIONS

2000 NAVY PENTAGON

WASHINGTON, DC 20350-2000

OPNAVINST 11010.20H CH-1

N46

24 June 2015

OPNAV INSTRUCTION 11010.20H CHANGE TRANSMITTAL 1

From:

Chief of Naval Operations

Subj:

NAVY FACILITIES PROJECTS

Encl:

(1) Revised Page 1-1

(2) New Pages 1-1a and 1-1b

(3) Revised Pages 1-3, 1-4, and 1-5

(4) Revised Page 2-2

(5) Revised Page 3-2

(6) Revised Pages 3-4, 3-5, 3-6, and 3-7

(7) New Page 3-7a

(8) Revised Page 4-1

(9) Revised Page 5-1

(10) Revised Page 5-5

(11) Revised Page 8-1

(12) New Page 8-1a

(13) Revised Pages B-1, B-2, and B-3

1.

Purpose

a. To transmit new pages 1-1, 1-1a and 1-1b which provide

guidance for the use of Commander Naval Facilities Engineering

Command (COMNAVFACENGCOM) for awarding and administering

contracts for architect-engineer, construction, utilities,

energy, and facilities-related support.

b. To transmit new pages which make corrections and updates

based on regulations and Public Law 113-291 changes to military

construction authority.

2.

Action

a. Remove page 1-1 of the basic instruction and insert

enclosures (1) and (2) of this change transmittal.

b. Remove pages 1-3, 1-4, and 1-5 of the basic instruction

and insert enclosure (3) of this change transmittal.

OPNAVINST 11010.20H CH-1

24 June 2015

c. Remove page 2-2 of the basic instruction and insert

enclosure (4) of this change transmittal.

d. Remove page 3-2 of the basic instruction and insert

enclosure (5) of this change transmittal.

e. Remove pages 3-4, 3-5, 3-6, and 3-7 of the basic

instruction and insert enclosures (6) and (7) of this change

transmittal.

f. Remove page 4-1 of the basic instruction and insert

enclosure (8) of this change transmittal.

g. Remove page 5-1 of the basic instruction and insert

enclosure (9) of this change transmittal.

h. Remove page 5-5 of the basic instruction and insert

enclosure (10) of this change transmittal.

i. Remove page 8-1 of the basic instruction and insert

enclosures (11) and (12) of this change transmittal.

j. Remove pages B-1, B-2, and B-3 of the basic instruction

and insert enclosure (13) of this change transmittal.

3. Records Management. Records created as a result of this

change transmittal, regardless of media or format, must be

managed per Secretary of the Navy Manual 5210.1 of January 2012.

P. H. CULLOM

Deputy Chief of Naval Operations

(Fleet Readiness and Logistics)

Distribution:

Electronic only via Department of the Navy Issuances Web site



2

OPNAVINST 11010.20H

16 May 2014

NAVY FACILITIES

PROJECTS

DEPARTMENT OF THE NAVY

OFFICE OF THE CHIEF OF NAVAL OPERATIONS

2000 NAVY PENTAGON

WASHINGTON, DC 20350-2000

OPNAVINST 11010.20H

N46

16 May 2014

OPNAV INSTRUCTION 11010.20H

From:

Chief of Naval Operations

Subj:

NAVY FACILITIES PROJECTS

Ref:

(a) OPNAVINST 5090.1D

(b) SECNAVINST 11011.47B

(c) DoD 7000.14-R, Department of Defense Financial

Management Regulations

(d) NAVSO P-1000

(e) DoD Instruction 4165.14 of 31 March 2006

(f) NAVFAC P-72

(g) 10 U.S.C.

(h) NAVFACINST 7820.1J

(i) JP 1-02, Department of Defense Dictionary of Military

and Associated Terms, as amended 15 September 2013

(j) DoD Instruction 1015.15 of 31 October 2007

(k) DoD Instruction 7700.18 of 15 December 2004

(l) DoD Instruction 7700.20 of 10 November 2005

(m) DoD Instruction 1330.17 of 8 October 2008

(n) NAVFAC Shore Facilities Planning System Guidebook, 9

Oct 2009

(o) DoD Directive 4275.5 of 15 March 2005

(p) NAVFAC P-73

(q) NAVFAC P-442

(r) OPNAVINST 4100.5E

(s) OPNAVINST 11000.8J

(t) CJCS Instruction 4600.02A

(u) DoD Directive 4510.11 of 12 April 2004

(v) OPNAVINST 11210.2

(w) DLA Instruction 4210 of 22 April 2008

(x) OPNAVINST F3300.53C

(y) NAVFACINST 11010.45

(z) OPNAVINST 11010.33C

(aa) DoD Directive 4105.67 of 2 May 2001

(ab) NAVFAC P-78

(ac) DoD Instruction 7060.03 of 7 December 2005

1. Purpose. To provide policy, guidance, and command

responsibilities for the classification, preparation,

OPNAVINST 11010.20H

16 May 2014

submission, review, programming, approval, and reporting of real

property facilities work at Navy shore installations and sites.

Changes from previous revision:

a. This instruction is considered a complete revision and

should be reviewed in its entirety.

b. Major policy changes from OPNAVINST 11010.20G to

11010.20H:

(1) Clarifies the definition of repair and excludes

repair by replacement of a whole facility (complete facility

replacement is construction). See chapter 3, paragraphs 1a and

1b.

(2) Delegates the authority to determine work

classification within the guidelines of the instruction to Naval

Facilities Engineering Command (NAVFACENGCOM). Specific

examples are maintained on the NAVFACENGCOM portal. See chapter

1, paragraph 2b(7).

(3) Clarifies the definition of real property and

personal property. Specific examples are listed in a new

appendix (appendix A).

(4) Delegates the authority to determine real property

versus personal property within the guidance of this instruction

to NAVFACENGCOM.

(5) Adds a chapter on Navy working capital fund (NWCF)

projects (chapter 10).

(6) Updates funding authority diagram (appendix B) to

include the fiscal year (FY) 2013 National Defense Authorization

Act (NDAA).

(7) Clarifies the definition of funded versus unfunded

costs for all projects (military construction project (MILCON)

and special projects).

(8) No longer requires Assistant Secretary of the Navy

(ASN) approval prior to authority to advertise for special

projects exceeding $7.5 million. (Approval and 14-day

congressional notification prior to award required.)

2

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download