1 Technical Requirements - PG&E

The water source onsite storage tank shall be designed to store fire protection water in the lower portion and water for the other systems in the upper portion. The tank shall be sized for 8 hours of facility operation at full load (this does not include the water required per NFPA requirements). ................
................