Table of Anticipated Temporary and Permanent



Table of Anticipated Temporary and Permanent

Right of Way Acquisitions

Alternative 3E | |

|No. |

|No. |

|No. |

|No. |

|No. |

No. |Reputed Owner |Map &

Parcel # |Acquis.

Type |Purpose |Parcel Size |Acquisition Size | | | | | | |sq.m |ac |sq.m |ac | |1 |Bussert, Roberta L. |L. 1108 P. 223

TM 180.18-1-25 | | |+/-1214 |+/-0.3 | | | |2 |Dake, William P. |L. 1540 P. 579

TM 180.18-1-8 |FEE/WA |Highway

Infrastruct. |+/-1169 |+/-2.76 |+/-20 |+/-0.005 | |3 |LaButta, John J.

(Point Breeze Marina) |L. 998 P. 3

TM 180.18-1-26 |FEE/WA |Highway

Infrastruct. |+/-11331 |+/-2.8 |+/-780 |+/-0.19 | |4 |Stanko, Frances |L. 1609 P. 798

TM 180.18-1-30.1 |FEE/WA |Highway

Infrastruct. |+/-44920 |+/-11.1 |+/-21 |+/-0.005 | |5 |Pravda, George & Gertrude |L. 758 P. 212

TM 180.18-1-2 | | |+/-2550 |+/-0.63 | | | |6 |Pravda, George & Gertrude |L. 758 P. 216

TM 180.18-1-3 | | |+/-1538 |+/-0.38 | | | |7 |NY State Boat Launch |L. 754 P. 538

TM 180.18-1-1 | | |+/-8175 |+/-2.02 |

|

| |8 |JDLC Inc.

(Boat Works) |L. 1568 P. 377

TM 180.00-2-56 | | |+/-9105 |+/-2.25 |

|

| |9 |Ambrozak, Patricia A. |L. 1350 P. 215

TM 180.00-4-8 |FEE/WA |Highway

Infrastruct. |+/-11331 |+/-2.8 |+/-3173 |+/-0.78 | |10 |Saratoga Rowing Association, Inc. |L. 1667 P. 239

TM 180.00-2-63 | | |+/-16552 |+/-4.09 | | | |11 |Golinski, Ann M. |L. 729 P. 490

TM 180.00-4-6 |FEE/WA |Highway

Infrastruct. |+/-3885 |+/-0.96 |+/-895 |+/-0.22 | |

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download