Part number and rule number from which variance is requested R408.40115, Rule 115 (4) & (5) and R408.41113, Rule 1113 (5) (6) (8) & (14), and R408.41140, Rule 1140
PART 1 – General Rules, and STANDARD PART 11 – Fixed & Portable Ladders
Summary of employer's request for variance To allow employee to paint steel lattice and pole towers ranging from 120 kV to 345 kV in the International Transmission Company territory located in Michigan. The work would commence immediately following the variance approvals and continue until the end of the 2015 painting season.
Name and address of employer Location for which variance is requested
Morris Painting various locations in the Internation Transmission Company territory located in Michigan
Published: October 2014
Variances Granted- Construction
Part number and rule number from which variance is requested Part 13 – Mobile Equipment, Rules 1926.602 & 1926.1000
Summary of employer's request for variance
To allow employer to operate a Komatsu PC27 and John Deere 27D without the Roll Over Protection System (ROPS) in the lower level of the building, for the removal of concrete slabs, backfill and replacement of concrete provided the following stipulations are adhered to:
Name and address of employer Location for which variance is requested
Hardman Construction U of M West Quad Hall, Ann Arbor
Part number and rule number from which variance is requested
Part 1 - General Rules: R408.40115, Rule 115 (4) & (5) and
Part 11 – Fixed and Portable Ladders: R408.41113, Rule 1113 (5) (6) (8) & (14), and
R408.41140, Rule 1140
Summary of employer's request for variance To allow employee to paint steel lattice and pole towers ranging from 120 kV to 345 kV in the International Transmission Company territory located in Michigan. The work would commence immediately following the variance approvals and continue until the end of the 2014 painting season.
Name and address of employer Location for which variance is requested
Morris Painting Inc Various locations in the International Transmission t
Territory located in Michigan
Part number and rule number from which variance is requested Part 13 – Mobile Equipment, 1926.602
Summary of employer's request for variance To allow employer to operate a CAT 304C and 303C without the Roll Over Protection System (ROPS) in the lower level of the building, for the removal of concrete slabs, backfill and replacement of concrete provided the following stipulations are adhered to:
Name and address of employer Location for which variance is requested
Eagle Excavation U of M West Quad Hall, Ann Arbor
Part number and rule number from which variance is requested Part 10 – Lifting and Digging Equipment, R408.41065a(1), R408.41065a(2) and R408.41072a(15)
Summary of employer's request for variance
To allow the use of a temporary personnel hoist systems to transport workers, tools, and materials to and from elevated worksites in a personnel cage during chimney construction work provided employer comply with all the requirements set forth in the OSHA chimney-related permanent variance published in the Federal Register as Number 2013-23625 on October 2, 2013 and all the requirements of Construction Safety Standard, Part 10, Lifting and Digging Equipment except for Rules 1065a (1), 1065a (2) and 1072a (15) which are met as follows:
Name and address of employer Location for which variance is requested
International Chimney Corp DTE Energy, Monroe Power Plant, 3500 Front St, Monroe
Published: July 2014
Variances Granted- Construction
Part number and rule number from which variance is requested 32-Aerial Work Platforms, R408.43216, Rule 3216(3) & Rule 3216(4)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach
Name and address of employer Location for which variance is requested
Conti Fire Protection GM Powertrain Center, Pontiac
Conti Mechanical GM Powertrain Center, Pontiac
Motor City Electric Co GM Powertrain Center Pontiac
Pontiac Ceiling & Partition Co LLC Cobo Hall, Detroit
Rival Insulation LLC Cobo Center Phase II, Detroit
Superior Electric Great Lakes Co GM Proving Grounds, Milford
Published: April 2014
Variances Granted- Construction
Part number and rule number from which variance is requested
32-Aerial Work Platforms, R408.43216, Rule 3216(3) & Rule 3216(4)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach
Name and address of employer Location for which variance is requested
Carrier Construction Co WMU, School of Medicine, Kalamazoo
Conti Corporation Consumers Energy,Karn Weadock Power Plant, Essexville
Motor City Electric Co GM Warren Technical Center Campus, Warren
Published: December 2013
Variances Granted – Construction
Part number and rule number from which variance is requested
Part I – General Rules: R408.40115, Rule 115 (4) & (5) and
Part II – Fixed and Portable Ladders: R408.41113, Rule 1113 (5) (6) (8) & (14), and
R408.41115, Rule 1115 (8)
Summary of employer's request for variance
To allow employee to paint steel lattice and pole towers ranging from 120 kV to 345 kV in the International Transmission Company territory (See Exhibit A) located in Michigan. The work would commence immediately following the variance approvals and continue until the end of the 2010 painting season.
Name and address of employer Location for which variance is requested
MORRIS PAINTING, INC. Various Locations in the
International Transmission Company Territory
Located in Michigan
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41213; Rule 1213 (1)
Summary of employer's request for variance
To allow employer to use a warning line system in addition to the designed guardrail (which does not comply with the requirements of Part 12) of a SafeSpan scaffold under controlled conditions and according to the following stipulations.
Name and address of employer Location for which variance is requested
SEAWAY PAINTING, LLC Mackinac Bridge, Mackinaw City
Part number and rule number from which variance is requested
Part 13 – Mobile Equipment: R1926.602; Rule 1926.1000
Summary of employer's request for variance
To allow employer to operate a CAT 304C and 303C without the Roll over Protection System (ROPS) in the lower level of the building, for the removal of concrete slabs, backfill and replacement of concrete provided certain stipulations are adhered to.
Name and address of employer Location for which variance is requested
EAGLE EXCAVATION U of M south quad Hall Renovation Project, Ann Arbor
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) & Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach due to overhead obstructions
Name and address of employer Location for which variance is requested
BARTON MALOW COMPANY St. Joseph Mercy Oakland Hospital – Campus Regeneration Project, Pontiac
BARTON MALOW COMPANY Crittenton Hospital – Cornerstone South Tower Project, Rochester Hills
BARTON MALOW COMPANY University of Michigan Institute for Social Research
Addition, Ann Arbor
BARTON MALOW COMPANY Consumers Energy D.E. Karn, Essexville
DEE CRAMER U of M South Quad, Ann Arbor
DEE CRAMER Consumers Energy De-Karn Plantm Essexville
DENN-CO CONSTRUCTION INC. Detroit Medical Center Cardiovascular Institute, Detroit
EDWARDS GLASS CO. University of Michigan Institute for Social Research Addition
Ann Arbor
JOHN E. GREEN COMPANY Michigan Automotive Compressor Inc., Parma
LIMBACH COMPANY LLC Western Michigan University School of Medicine, Kalamazoo
SCI/STEELCON WMU Medical School, Kalamazoo
URS CORPORATION DTE Monroe Power Plant FGD and SCR Projects,
Monroe
WESTERN MECHANICAL Cobo Center, Phase II Southside Renovations,
CONTRS, INC. Detroit
WESTERN MECHANICAL St. Joseph Mercy Oakland, South Patient tower &
CONTRS, INC. Regeneration, Pontiac
Published: April 2013
Variances Granted – Construction
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41212; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height of 36 inches, under controlled conditions, with stipulations.
Name of employer Location for which variance is requested
Barton Malow Company Varsity Ann Arbor Project, Ann Arbor
North American Construction Enterprises McKinley Elementary School, Warren
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) & Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach, due to overhead obstructions provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Hoyt, Brumm & Link Inc. General Motors Power Train Facility, Pontiac
Ventcon, Inc. St. Joseph Mercy Oakland Campus Regeneration Project, Pontiac
Published: October 30, 2012
Variances Granted – Construction
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41212; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height of 36 inches under controlled conditions, with stipulations.
Name of employer Location for which variance is requested
Acoustic Ceiling & Partition, Inc. University of Michigan East Quad, Ann Arbor
Barton Malow Company Chrysler GLBC, Detroit
University of Michigan Crisler Arena Project, Ann Arbor
Ritsema Associates Spectrum Health United Memorial Hospital, Greenville
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) & Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach, due to overhead obstructions provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Barton Malow Company DTE GO – 9th Floor Auditorium Restoration Project, Detroit
University of Michigan Crisler Arena Project, Ann Arbor
Dee Cramer, Inc. Crittenton Hospital Medical Center, Rochester Hills
John E. Green Company Crittenton Hospital, Rochester Hills
Moote Electrical, Inc. Crittenton Hospital Cornerstone Tower Addition, Rochester
Shaw Electric Company University of Michigan Chrysler Arena Expansion, Ann Arbor
Published: July 27, 2012
Variances Granted– Construction
Part number and rule number from which variance is requested
Part 10 – Lifting & Digging Equipment: Rule 1015a (2) (d)(f)(g)(h)(i), 1015a (3), 1015a (4); 1018a (1)(2)(21); 1019a (1); and 1021a (4)
Summary of employer's request for variance
To allow the use of a suspended work platform to hoist or suspend personnel or to provide access to elevate work areas in a manner that exposed employees to the least hazard practicable. All requirements of Construction Safety Standard, Part 10. Lifting and Digging Equipment except Rule 1015a (2) (d)(f)(g)(h)(i), 1015a (3), 1015a (4); 1018a (1)(2)(21); 1019a (1); and 1021a (4)
Name of employer Location for which variance is requested
Pullman Power LLC St. Clair Power Plant, East China Twp.
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41213, Rule 1213 (1)
Summary of employer's request for variance
To allow employer to use a warning line system in addition to the designed guardrail of a SafeSpan scaffold under controlled conditions and according to certain stipulations. The SafeSpan guardrail does not meet the requirements of Part 12.
Name of employer Location for which variance is requested
Seaway Painting, LLC Ambassador Bridge over the Detroit River, Detroit
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41212; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height of 36 inches under controlled conditions, with stipulations.
Name of employer Location for which variance is requested
Acoustic Ceiling & Partition, Inc. Chelsea Community Hospital Addition, Chelsea
Sterling Contracting, Inc. Broderick Tower, Detroit
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) & Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach, due to overhead obstructions provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Dee Cramer, Inc. Lincoln High School Performing Arts, Ypsilanti
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (21)
Summary of employer's request for variance
To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Davis Construction Lansing Board of Water and Light, Lansing, MI
Milbocker & Sons, Inc. M-223 over the Raisin River, Lenawee County
Published: April 27, 2012
Variances Granted
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41212; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height of 36 inches under controlled conditions, with stipulations.
Name of employer Location for which variance is requested
Acoustic Ceiling & Partition Co. Oakland University Campus, Rochester
Barton Malow Co. BLUnite Project, Detroit
Children’s Specialty Ctr., Detroit Medical Ctr., Detroit
St. Mary Mercy Hospital, Southwest Addition, Livonia
Brinker Team Interiors Finney Crockett High School, Detroit
First National Building, Detroit
Jasman Construction Inc. Greenleaf Trust Building, Birmingham
Ritsema Associates Western Michigan University, Kalamazoo
Turner Brooks Western Michigan University, Kalamazoo
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) & Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach, due to overhead obstructions, provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Conti DMC Pediatric Specialty, Sterling Heights
John E. Green Company Chelsea Hospital Project, Chelsea
Published: February 3, 2012
Construction Variances Granted
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41212; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height of 36 inches under controlled conditions, with stipulations.
Name of employer Location for which variance is requested
Brinker Team Interiors Children’s Specialty Center, Detroit Medical Center, Detroit
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) & Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform for use in areas only where the aerial lift cannot reach, due to overhead obstructions. The platform shall only be used to install Metal Studs, Drywall and finish drywall, provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Brinker Team Interiors Children’s Pediatric Specialty Center, Detroit Medical Center, Detroit
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (21)
Summary of employer's request for variance
To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
C. A. Hull Co., Inc. I-94/I-96, Port Huron
Milbocker & Sons, Inc. M-222, Allegan
Dixie Highway at Cass River, Saginaw County
Published: October 24, 2011
Variances Granted
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: RULE R408.41221; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height of 36 inches, under controlled conditions with stipulations.
Name of employer Location for which variance is requested
Acoustic Ceiling & Partition Co Inc EMU Mark Jefferson Building, Ypsilanti
U of M Alice Lloyd Hall, Ann Arbor
Barton Malow Co. McLaren Proton Treatment Center Project – McLaren Hospital, Flint
Brinker Team Construction Co Chase Building, Detroit
Northwestern High School, Detroit
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided stipulations are adhered to.
Name of employer Location for which variance is requested
Barton Malow Company McLaren Proton Treatment Center Project – McLaren Hospital, Flint
Bouma Corporation Midland Battery Park, Midland
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (21)
Summary of employer's request for variance
To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
C. A. Hull Co., Inc. M-3 Gratiot Ave. over the Clinton River in
Clinton Township, Macomb County
Published: July 26, 2011
Variances Granted - Construction
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: RULE R408.41221; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height of 30 inches, under controlled conditions with stipulations.
Name of employer Location for which variance is requested
Barton Malow Co. Urban Science Office Suites – Renovation Project, Detroit
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: RULE R408.41221; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height of 36 inches, under controlled conditions with stipulations.
Name of employer Location for which variance is requested
Acoustic Ceiling & Partition Co Inc Pray-Harrold Building, Ypsilanti
St. Joe Hospital, Ypsilanti
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided stipulations are adhered to.
Name of employer Location for which variance is requested
John Darr Mechanical Inc. University of Michigan North Campus Chiller Replacement, Ann Arbor
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (21)
Summary of employer's request for variance
To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Hardman Construction M-21 over the Grand River, Ada
Zenith Tech Inc. US-141 over Menominee River, Dickinson County
Published: April 15, 2011
Variances Granted - Construction
Part number and rule number from which variance is requested
Part 10 – Lifting and Digging Equipment: RULE R408.41015; Rule 1015a (2) (d)(f)(g)(h)(i), 1015a (3), 1015a (4); 1018a (1)(2)(21); 1019a (1); and 1021a (4)
Summary of employer's request for variance
To allow the use of a suspended work platform to hoist or suspend personnel or to provide access to elevated work areas in a manner that exposes employees to the least hazard practicable. All requirements of Construction Safety Standard, Part 10. Lifting and Digging Equipment except Rule 1015a (2) (d)(f)(g)(h)(i), 1015a (3), 1015a (4); 1018a (1)(2)(21); 1019a (1); and 1021a (4) are met under certain stipulations.
Name of employer Location for which variance is requested
Pullman Power Monroe Power Plant, Monroe
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided stipulations are adhered to.
Name of employer Location for which variance is requested
Buist Electric CS Facility Washington Remodel Project, Coopersville
John E. Green Company BPSC Facility, Midland
Limbach Company LLC CS Mott Hospital Children’s & Women’s Hospital Shell Space Completion Project, Ann Arbor
Published: January 21, 2011
Variances Granted - Construction
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided stipulations are adhered to.
Name of employer Location for which variance is requested
American Erectors, Inc. Midland Battery Park, Midland
American Erectors, Inc. Maybury K-8 School, Detroit
American Erectors, Inc. Brightmoor K-8 School, Detroit
American Erectors, Inc. Martin Luther King Jr. High School, Detroit
Brigade Fire Protection, Inc. New Accident Fund Insurance Headquarters, Lansing
Summit Contractors New Accident Fund Insurance Headquarters, Lansing
Published: October 29, 2010
Variances Granted - Construction
Part number and rule number from which variance is requested
Part 10 – Lifting and Digging Equipment: RULE R408.41015; Rule 1015a (2) (d)(f)(g)(h)(i), 1015a (3), 1015a (4); 1018a (1)(2)(21); 1019a (1); and 1021a (4)
Summary of employer's request for variance
To allow the use of a suspended work platform to hoist or suspend personnel or to provide access to elevated work areas in a manner that exposes employees to the least hazard practicable. All requirements of Construction Safety Standard, Part 10. Lifting and Digging Equipment except Rule 1015a (2) (d)(f)(g)(h)(i), 1015a (3), 1015a (4); 1018a (1)(2)(21); 1019a (1); and 1021a (4) are met under certain stipulations.
Name of employer Location for which variance is requested
Hamon Custodis, Inc. Monroe Power Plant, Monroe
Part number and rule number from which variance is requested
Part 12 – Scaffolds and Scaffold Platforms: R408.41221; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height of 36 inches under controlled conditions and according to certain stipulations.
Name of employer Location for which variance is requested
Acoustic Ceiling & Partition Co. Inc. University of Michigan Law Quad, Ann Arbor
Brinker Group Univ. of Michigan Couzens Hall Renovation, Ann Arbor
Madias Brothers Mott Women’s & Children’s Hospital, Ann Arbor
Published: July 26, 2010
Variances Granted - Construction
Part number and rule number from which variance is requested
Part I – General Rules: R408.40115, Rule 115 (4) & (5) and
Part II – Fixed and Portable Ladders: R408.41113, Rule 1113 (5) (6) (8) & (14) and
R408.41115, Rule 1115 (8)
Summary of employer's request for variance
To allow employee to paint steel lattice and pole towers ranging from 120 kV to 345 kV in the International Transmission Company territory (See Exhibit A) located in Michigan. The work would commence immediately following the variance approvals and continue until the end of the 2010 painting season.
Name of employer Location for which variance is requested
Morris Painting, Inc. Various Locations in the International Transmission Co
Territory located in Michigan
Part number and rule number from which variance is requested
Part 12 – Scaffolds and Scaffold Platforms: R408.41221; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height, under controlled conditions and according to certain stipulations.
Name of employer Location for which variance is requested
Acoustic Ceiling & Partition Co Inc. Ann Arbor City Municipal Center
Acoustic Ceiling & Partition Co Inc. Detroit Arsenal, Warren
Barton Malow Company C. S. Mott Women’s & Children’s Hospital, Ann Arbor
Rajala & Sons Finishes Michigan Tech University Student Apartments, Houghton
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided stipulations are adhered to.
Name of employer Location for which variance is requested
Barton Malow Company A 123 Systems, Livonia
Ferndale Electric Co Inc. A 123 Systems, Livonia
Published: April 26, 2010
Variances Granted - Construction
Part number and rule number from which variance is requested
Part 12 – Scaffolds and Scaffold Platforms: R408.41221; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height under controlled conditions and according to certain stipulations.
Name of employer Location for which variance is requested
Barton Malow Co. A123 Systems, Livonia
Brinker Team Construction Co. Mott Hospital, Ann Arbor
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided stipulations are adhered to.
Name of employer Location for which variance is requested
Brunt Associates Inc. U of M North Quad Dormitory
Dee Cramer General Motors Corporation, Flint
Limbach Co LLC Dearborn Town Center, Dearborn
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216, Rule 3216 (21)
Summary of employer's request for variance
To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Posen Construction Inc. Bridgeview Bridge, Harrison Twp.
Published: January 29, 2010
Variances Granted - Construction
Part number and rule number from which variance is requested
Part 12 – Scaffolds and Scaffold Platforms: R408.41221; Rule 1221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height under controlled conditions and according to certain stipulations.
Name of employer Location for which variance is requested
Acoustic Ceiling & Partition Co. St. Joe hospital, Ypsilanti
Acoustic Ceiling & Partition Co. U of M CS Mott Children & Womens Hospital, Ann Arbor
Denn-Co Construction Inc. University of Michigan Stadium, Ann Arbor
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided stipulations are adhered to.
Name of employer Location for which variance is requested
Ideal Contracting Univ. of MI Mott Childrens & Womens Hospital
Ram Construction Services U of M CS Mott Women & Childrens Hospital, Ann Arbor
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216, Rule 3216 (21)
Summary of employer's request for variance
To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Milbocker & Sons Inc. US 131 over Manistee River, Wexford County
Published: October 26, 2009
Variances Granted - Construction
Part number and rule number from which variance is requested
Part 11 – Fixed and Portable Ladders: R408.41132; Rule 1132 (2)
Summary of employer's request for variance
To allow employer to use stepladders as defined in the ANSI A14.5-1982 with the side rails painted with opaque material for identification purposed, provided certain stipulations are adhered tol.
Name of employer Location for which variance is requested
Soule & Co. Hemlock Semiconductor, Hemlock
Part number and rule number from which variance is requested
Part 12 – Scaffolds and Scaffold Platforms: R408.41221; Rule 1221
Summary of employer's request for variance
To allow employer to use stilts at a maximum height under controlled conditions and according to certain stipulations.
Name of employer Location for which variance is requested
Barton Malow Co. Crittenton Karmanos Cancer Center, Rochester
Brinker Team Construction Co. St. Joseph Hospital, Pontiac
Part number and rule number from which variance is requested
Part 13 – Mobile Equipment: 1926.602, Rule 1926.1000
Summary of employer's request for variance
To allow employer to operate a Kubota R420 without the Roll Over Protection System (ROPS) in the parking garage to remove concrete forms and transport concrete, provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Burgess Concrete Construction Inc. Blodgett Memorial Medical Center, East Grand Rapids
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform provided stipulations are adhered to.
Name of employer Location for which variance is requested
R. L. Bondy C. S. Mott Children’s & Women’s Hospital, Ann Arbor
Center Line Electric, Inc. U of M Mott Children’s & Women’s Hospital, Ann Arbor
Dynalectric of Michigan U of M Mott Children’s & Women’s Hospital, Ann Arbor
Michigan Mechanical Insulation U of M Women’s & Children’s Hospital, Ann Arbor
Shaw Electric Co. C. S. Mott Women’s & Children’s Hospital, Ann Arbor
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216, Rule 3216 (21)
Summary of employer's request for variance
To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Posen Construction Inc. Sanford Lake, Sanford
Published: July 24, 2009
Variances Granted - Construction
Part number and rule number from which variance is requested
Part I – General Rules: R408.40115; Rule 115 (4) & (5) and
Part II – Fixed and Portable Ladders: R408.41113; Rule 1113 (5) (6) (8) & (14), and
R408.41115; Rule 1115 (8)
Summary of employer's request for variance
To allow employee to paint steel lattice and pole towers ranging from 120 kV to 345 kV in the International Transmission Company territory located in Southeastern Michigan. The work would commence immediately following the variance approvals and continue until the end of the 2009 painting season.
Name of employer Location for which variance is requested
Morris Painting, Inc. Various Locations in the International Transmission Co, Flint & Saginaw Area
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Platforms: R408.41221; Rule 11221 (1) (c)
Summary of employer's request for variance
To allow employer to use stilts at a maximum height of 24 inches under controlled conditions and according to certain stipulations.
Name of employer Location for which variance is requested
Brinker Team Construction Co. University of Michigan Stadium, Ann Arbor
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6), Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform, provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Ann Arbor Ceiling & Partition Co. University of Michigan North Quad Building, Ann Arbor
R. L. Bondy University of Michigan North Quad Complex, Ann Arbor
R. L. Bondy BASF Wyandotte/JPP Project, Wyandotte
Center Line Electric, Inc. BASF Wyandotte, Wyandotte
Conti Electric University of Michigan North Quad Complex, Ann Arbor
Dee Cramer U of M Women’s & Children Hospital, Ann Arbor
Dependent Insulation Co. Inc. University of Michigan North Quad Project, Ann Arbor
John E. Green Co. University of Michigan North Quad Complex, Ann Arbor
Limbach Co., LLC U of M North Quad, Ann Arbor
Mechanical Heat & Frost Insulation U of M North Quad, Ann Arbor
W. J. O’Neil Co. BASF, Wyandotte
Ventcon, Inc. U of M C.S. Mott Women’s & Children Hosp, Ann Arbor
Ventcon, Inc. University of Michigan North Quad Project, Ann Arbor
Wolverine Fire Protection Co. C. S. Mott Children’s Hospital, Ann Arbor
Published: April 15, 2009
Variances Granted - Construction
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (6) and Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform, in areas where a self-propelled elevating work platform cannot reach due to mechanical obstruction, provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Superior Electric Great Lakes Co. General Motors Technical Center, Warren
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216; Rule 3216 (21)
Summary of employer's request for variance
To allow employer to operate an aerial work platform from the deck of a floating vessel, provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Posen Construction, Inc. Sanford Lake, Sanford
Published: January 26, 2009
Variances Granted - Construction
Part number and rule number from which variance is requested
Part 12 – Aerial Work Platforms: R408.41221, Rule 1221
Summary of employer's request for variance
To allow employer to use stilts at a maximum height of 24 inches, under controlled conditions, and according to certain stipulations.
Name of employer Location for which variance is requested
B. R. D. INC. Oakwood Rd., Brandon Twp.
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43205, Rule 3205.1 (a)
Summary of employer's request for variance
To allow employer to operate a vehicle mounted elevating and rotating aerial device as defined in ANSI Standard A92.2-202 without the manufacturer’s operator manual available for the aerial device used to elevate employees, and catch material during bridge construction provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Walter Toebe Construction Co. Gateway Project, Detroit
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216, Rule 3216 (6) and Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform, in areas where a self-propelled elevating work platform cannot reach due to mechanical obstruction, provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Barton Malow Company William Beaumont Hospital, Sterling Heights
R. L. Bondy William Beaumont Hospital, Sterling Heights
Brinker Team Construction Co. Mott Hospital, Ann Arbor
Ferndale Electric William Beaumont Hospital, Troy
John E. Green Company Troy Beaumont Hospital, Sterling Heights
John E. Green Company University of Michigan Mott Children’s & Women’s Hospital, Ann Arbor
John E. Green Company Hemlock Semiconductor Plant, Hemlock
Western Mechanical Contractors William Beaumont Hospital EC/CCT, Sterling Heights
Published: October 24, 2008
Variances Granted - Construction
Part number and rule number from which variance is requested
Part I – General Rules: R408.40115, Rule 115 (4) & (5) and
Part II – Fixed and Portable Ladders: R408.41113, Rule 1113 (5) (6) (8) & (14), and
R408.41115, Rule 1115 (8)
Summary of employer's request for variance
To allow employee to paint steel lattice and pole towers ranging from 120 kV to 345 kV in the International Transmission Company territory located in Southeastern Michigan. The work would commence immediately following the variance approvals and continue until the end of the 2008 painting season.
Name of employer Location for which variance is requested
Morris Painting, Inc. Various Locations in the
International Transmission Company territory located in
The Flint & Saginaw area
Part number and rule number from which variance is requested
Part 10 – Lifting and Digging Equipment: R408.41021, Rule 1021 (a)
Summary of employer's request for variance
To allow employer to rig certain loads to the load line of the crane above the overhaul weight in accordance with certain stipulations.
Name of employer Location for which variance is requested
W. J. O’Neil Company BASF, Wyandotte
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41212, Rule 1212 (5) & Rule 1212 (6)
Summary of employer's request for variance
To allow employer to erect a scaffold closer to 110/220 volt insulated service conductors than the clearances prescribed, provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Davenport Masonry, Inc. Zaragon Place, Ann Arbor
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41221, Rule 1221
Summary of employer's request for variance
To allow employer use stilts at a maximum height of 24 inches under controlled conditions and according to certain stipulations.
Name of employer Location for which variance is requested
Barton Malow Co. William Beaumont Hospital, Sterling Heights
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216, Rule 3216 (6); Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled elevating work platform, provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
J. B. Cain Co. St. John Hospital, Detroit
W. J. O’Neil Company BASF, Wyandotte
Pipe Systems, Inc. University of MI Eye Center Expansion, Ann Arbor
Ventcon William Beaumont Hospital, Troy
Ventilation Systems, Inc. St. John Hospital, Detroit
Published: July 31, 2008
Variances Granted - Construction
Part number and rule number from which variance is requested
Part 10 – Lifting and Digging Equipment: R408.41021, Rule 1021 (a)
Summary of employer's request for variance
To allow employer to rig certain loads to the load line of a crane above the overhaul weight in accordance with certain stipulations.
Name of employer Location for which variance is requested
W. J. O’Neil Company Chrysler – Trenton Plant, Trenton
Part number and rule number from which variance is requested
Part 12 – Scaffolds & Scaffold Platforms: R408.41221, Rule 1221
Summary of employer's request for variance
To allow employer to use stilts at a maximum height of 24 inches, under controlled conditions, and according to certain stipulations.
Name of employer Location for which variance is requested
Barton Malow Company St. John Hospital, Detroit
Rajala & Sons Finishes University of Michigan, Flint
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43216, Rule 3216 (6) and Rule 3216 (7)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the intermediate rail of the guardrail system of a self-propelled aerial lift for use as a work platform, in areas where a self-propelled elevating work platform cannot reach due to mechanical obstruction, provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Barton Malow Company St. John Hospital, Detroit
Michigan Metal Walls, Inc. GM Powertrain Engineering Consolidation Project, Pontiac
Pontiac Ceiling & Partition Co. LLC Henry Ford Hospital, West Bloomfield
Published: February 29, 2008
Variances Granted - Construction
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43209, Rule 3209 (8) (b), and Rule 3209 (9)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the top of the intermediate rail of the guardrail system for use as a work platform, in areas where a self-propelled elevating work platform cannot reach due to mechanical obstruction, provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Michigan Mechanical Insulation General Motors Powertrain Lab Consolidation, Pontiac
Hoyt, Brumm, & Link, Inc. General Motors Power Train Facility, Pontiac
Shambaugh & Son L.P. General Motors Powertrain Lab Consolidation, Pontiac
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43209, Rule 3209 (29)
Summary of employer's request for variance
To allow employer to operate an aerial work platform from the deck of a floating vessel, provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Anlaan Corporation 7th Street over Black River, Port Huron
Published: November 27, 2007
Variances Granted: Construction
Part number and rule number from which variance is requested
Part 1 – General Rules: R408.40115, Rule 115 (4) & (5) and
Part 11 – Fixed & Portable Ladders: R408.41113, Rule 1113 (5) (6) (8) & (14)
Summary of employer's request for variance
To allow employee to paint steel lattice and pole towers ranging from 120 kV to 345 kV in the International Transmission Company territory located in Southeastern Michigan. The work would commence immediately following the variance approvals and continue until the end of the 2007 painting season.
Name of employer Location for which variance is requested
Morris Painting, Inc. Various Locations in the International Transmission Company territory located in Southeastern Michigan
Part number and rule number from which variance is requested
Part 10 – Lifting and Digging Equipment: R408.41025, Rule 1025a (12)
Summary of employer's request for variance
To allow employer to make Multi-Lifts of up to four bundles of re-steel at one time, provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Colasanti Specialty Services, Inc. Greektown Expansion Project
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43209, Rule 3209, Rule 3209 (8) (b), Rule 3209 (8) (c), and Rule 3209 (9)
Summary of employer's request for variance
To allow employer to firmly secure scaffold planks to the top of the intermediate rail of the guardrail system for use as a work platform, in areas where a self-propelled elevated work platform cannot reach due to mechanical obstruction, provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Allied Ventilation, Inc General Motors Powertrain Lab Consolidation, Pontiac
Bristol Steel & Conveyor Corp. 2010 MY Phoenix Engine Program Chrysler-Trenton Plant, Trenton
Conti Electric GM Powertrain Engineering Consolidation Project, Pontiac
De-Cal Mechanical Inc. GM Powertrain Engineering Consolidation Project, Pontiac
Denn-Co Construction, Inc. GM Powertrain One Lab, Pontiac
Denn-Co Construction, Inc. J P Morgan Chase Data Center, Belleville
Dependent Insulation Company, Inc. St. John Hospital, Detroit
Pace Mechanical Services, Inc. General Motors Powertrain Lab Consolidation, Pontiac
Pontiac Ceiling & Partition Co. LLC United States Postal Service NE Metro P&DC, Pontiac
Part number and rule number from which variance is requested
Part 32 – Aerial Work Platforms: R408.43209, Rule 3209 (29)
Summary of employer's request for variance
To allow employer to operate an aerial work platform from the deck of a floating vessel provided certain stipulations are adhered to.
Name of employer Location for which variance is requested
Milbocker & Sons, Inc. Lincoln Bridge over the Cheboygan River, Cheboygan
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
- aa1314 aa1314
- rhm administration of monoclonal antibodies
- saint joseph mercy slashes energy costs in midst of
- st joseph front v2
- trinity health physician opportunities
- st joseph mercy ann arbor st joseph mercy
- for more information
- trinity health livonia michigan mi hospitals
- the list sba lenders
- archived construction variances granted
Related searches
- ny times archived crosswords
- how to see archived emails gmail
- archived files in windows 10
- how to access archived gmail
- section 301 exclusions granted ustr
- how to retrieve archived email in gmail
- accidentally archived email in gmail
- archived mail windows 10
- how do i find archived emails gmail
- how do i retrieve archived gmail
- how to find archived websites
- my archived items