MUHAMMAD IMRAN ASLAM



MUHAMMAD IMRAN ASLAM

Address: House # P-35, KDA overseas bungalows, Gulistan-e-Johar,

Karachi, Pakistan.

Phone #: 0092-21-34614088(Pakistan)

Cell #: 0092-300-3587857(Pakistan)

S/O: MUHAMMAD ASLAM MAHMOOD (late)

CNIC: 42401-8657891-1

Passport No.: AS1808913

Nationality: Pakistani

D.o.B: 29.12.1980

E-Mail: imranaslam_29@

OBJECTIVE

A stimulating position in a result oriented company that seeks an ambitious and career conscious person, where required skills and qualification will be utilized towards continued growth and advancement, which offers good opportunities and challenging working environment. Hard worker, can function in multi-national environment, and can work under pressure.

SUBJECT

Applied for Drilling/Petroleum Engineer.

SCHOLASTIC SUMMARY

|EXAMINATION PASSED |YEAR |DIVISION |MAJOR SUBJECT/ SPECIALIZATION |NAME AND ADDRESS OF THE |

| | | | |INSTITUTION |

|M.Sc |2004 |First |Petroleum Technology |Petroleum Technology University |

| | | | |of Karachi |

|B.Sc |2000 |First |Maths, Statistics & Computer Science |University of Karachi |

|H.S.C. |1998 |Second |Pre-Engineering | Govt. National College |

|S.S.C. |1996 |First |Science Group |Qureshi Govt. High School |

|I.W.C.F |Driller level (Surface BOP Stack) Valid,2019 |International Petroleum Center |

EMPLOYMENT RECORD

• Since April, 2015 to Dec, 2015

Worked as a Driller for

Abraj Energy Services (Oman) Engaged in drilling operation(Cyber Chair) with BP.

• Since Aug, 2011 to Aug, 2014.

Worked as an Assistant Driller for

Schlumberger (RMG) and Saxon Energy Services (Iraq)

Engaged in drilling operation (Cyber base joystick, touch screen and iD3 {Intelligent drilling data display})

Responsibilities:

• Play/ assist the role of Driller in good manners including all the paper work regarding job function.

• Run or assist in running, special tools into the well bore for the purpose of logging, testing, coring or fishing operation.

• Ensures that the crew is training in the optimum safe performance of their duties and properly takes care of the personnel protective and mechanical equipment by conducting on the job training.

• Assist the Rig Manager when needed or in rig/camp move.

• April, 2006 to September, 2009

Worked as an Assistant Driller for

RAWABI DALMA ENERGY Co. LLC. in Saudi Arabia

Engaged in drilling and work over operations.

Responsibilities

As an Assistant Driller:

• Follow the program under the provision of ARAMCO procedures and policies.

• Assist the driller.

• Write daily IADC report as well as Drillers shift log.

• Expertise of running completion, set and retrieve or mill the packer, running directional drilling tools.

• Selection of fishing and milling tools

• Make inventories.

• Monitoring well while drilling or tripping as well as mud system.

• Lag calculation.

• Prepare for BHA.

As a Derrick Man

• Making all types of mud related to requirement.

• Perform tests related to mud.

• Work on derrick.

As a Floor Man

• Assist the driller on rig floor for make up or break out string.

• Line up stand pipe manifold or cement line while cementing.

• September, 2004 to April, 2006

Worked as a Field Engineer for

Foundation Engineering Pvt. Ltd. (Pakistan)

• July, 2004 to August, 2004

Worked as a NDT Inspector for

Premier Tubular Inspection Services Pvt. Ltd.(Pakistan)

Perform MPI, VTI and UT for tubular for oil and gas companies.

SOFTWARE EXPERTISE

• Microsoft Windows

• Microsoft Office Suite

• Korf 1.2(Pipeline design)

• Surfer (3D view of geological data)

• Free hand

• Biz-Tracker(Related to Accounts activity)

PERSONNEL TRAINNINGS

▪ H2S & SO2 Awareness & Escape

▪ Initial Fire Response & Hazard Identification

▪ Permit to Work System

▪ Deal with Hazards and Risks

▪ Manual Handling

▪ COW (Control Of Work)

▪ DOP (Drop Object Program)

▪ HSE (Health Safety & Environment)

▪ SCBA

▪ BLS (Basic Life support)

▪ SLS (Safety Leadership Skills)

▪ AGT (Authorize Gas testing)

▪ CHA (Chemical Handling Awareness)

▪ PSO (Process Safety Orientation)

▪ MEWP (Men Elevated Working Platform)

▪ Explosives safety

▪ Well integrity and well control

▪ Big Lift (Level-1)

EQUIPMENT USED

TDS: VARCO 11S AND VARIOUS TESCO CDS,

DRAW WORKS: HH JC 70DB,HH JC 50DB(Disk brake), NATIONAL 110-UE(Conventional friction brake).

MUD PUMPS: HH F1600(belt drive), HH F1300, NOV 12P-160 & 10P-130.

ROUGHNECK: CAN RIG TM120, Hawks Jaw.

WELL HEAD: Cameron, FMC and Breda 5K compact wellhead.

BOP: 13 5/8 Cameron 10K, Annular Shaffer 5K, / 20 ¾ Cameron 3K & annular Shaffer 3K, Annular Hydrill 5K.

BRIEF SUMMARY

I have worked in the oil and gas industry since April 2006. During my career, I have worked with TDS, manual rig floor tongs and iron roughneck, Band brakes and disc brakes and various types of drilling fluids.

Although most of my career has been based on Land Rigs in the Gulf States, I am very keen to expand my career experiences.

I take pride in performing my duties well and enjoy guiding those working under my supervision. I speak English, Arabic as well as my native language. My aim is to secure long term employment and progress my career with a major company within the oil and gas drilling industry.

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download