Back to Work Plan - Active Learner
-914400000Back to Work PlanLeverage the skills learned and support continuous learning by discussing the skill module objectives with your supervisor to develop a personalized plan to implement on the job. Some suggestions are as follows:Drill String Components and their PurposeDiscuss with a Drill Site Lead / Manager the following for a drill string used in your wells:Drill pipe tube OD and ID Drill pipe tube nominal wall thicknessTool joint OD and ID, and are these API recommended “Standard” dimensions?What tool joint style is used on the drill pipe?Drill pipe adjusted weight per footDrill pipe grade and marking system used to verify same What drill collars are used in the current well? What are the OD, ID and length of each?What heavy weight drill pipe is used in the current well? What are the OD, ID and length of each?What stabilizers are used in the current well? What are the OD, ID, length and style of each?What crossovers are used in the current well? What are the OD, ID, length and connections for each?What directional tools are used in the current well? What are the OD, ID and length of each?Drill String Operation and Failure PreventionDiscuss with a Drill Site Lead / Manager the following for a drill string used in your wells:What challenges routinely arise in operating the drill pipe? What processes exist to address these challenges?What safe operating limits have been established for the drill string components so that applied stress due to tension, torque and pressure loads does not exceed the yield stress?What is the Tensile Capacity (lb) for the drill pipe tube and is this adequate for the current well?What is the Torsional Capacity (ft-lb) for the drill pipe tube and is this adequate for the current well?What is the makeup torque for the drill pipe and is this adequate for the current well?What measures are in place to (a) combat fatigue failures, and (b) resist H2S?What hydraulics parameters have been established for the drill string?What was the most recent drill string failure? What was the cause and response?Your Personalized PlanDevelop a personalized Back to Work plan that outlines how to apply the learning objectives on the job. Signature of Supervisor Signature of ParticipantDate ................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
- homepage texas commission on environmental quality
- back to work plan active learner
- a completed standard inspection report is to be submitted
- section 328423 01 planting irrigation automatic
- scope american petroleum institute
- section 220517 sleeves seals and ecutcheons for
- section 334100 storm utility drainage piping
- texas commission on environmental quality
Related searches
- back to work monday quotes
- active learner log in
- active learner plains
- report back to work letter
- going back to work letter
- back to back stem and leaf calculator
- release back to work letter
- return back to work letter
- release back to work form
- back to back yeast infections
- aarp back to work 50 plus
- release back to work note