Notices - Ohio Department of Transportation

[Pages:2]Notices

Project: Notice: Date: Let Date:

238008 Late

Location: ROS-Tar Hollow Rd Type: CULVERT REPLACEMENT

7/19/2023

Thursday, August 10, 2023

FOR IMPROVING VARIOUS SECTIONS IN TAR HOLLOW STATE PARK, OF ROSS COUNTY, OF THE STATE OF OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS BY REMOVING AN EXISITING 48-INCH CORRUGATED METAL PIPE CULVERT W/CONCRETE HEADWALLS AND REPLACING WITH A 60-INCH PIPE (EITHER STEEL, PLASTIC, OR REINFORCED CONCRETE) AND NEW REINFORCED CONCRETE HEADWALLS. ALSO PERFORM ALL RELATED WORK.

Project: Notice: Date: Let Date:

233008

Location: FAY-SR 435-01.52

Design-Build Type: MAJOR RECONSTRUCTION

7/10/2023

Thursday, September 28, 2023

FOR IMPROVING VARIOUS SECTIONS IN FAYETTE COUNTY, OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS BY REMOVAL OF TRAFFIC SIGNAL INTERSECTION AND INSTALLATION OF A ROUNDABOUT INCLUDING WIDENING ROADWAYS, REALIGNING ROADWAYS ALONG THE I-71, SR435, US-35 AREA, AND ALL RELATED WORK.

Project: Notice: Date: Let Date:

238006 Late

Location: MOE-SR 7-07.51 Type: SLIDE REPAIR

7/10/2023

Thursday, August 10, 2023

FOR IMPROVING A SECTION OF ST RT 7 IN THE TOWNSHIP IN LEE OF THE COUNTY OF MONROE OF THE STATE OF OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS OF THE DEPARTMENT OF TRANSPORTATION BY REPAIRING A LANDSLIDE BY INSTALLING A 428 FT DRILLED SHAFT SOLDIER PILE AND LAGGING WALL, EXTENSION OF A CULVERT AND ALL RELATED WORK.

Project: PID119007 Location: -

Notice: Other

Type:

Date: 6/5/2023

Let Date:

As referenced in a previous notice, the Request for Qualifications (RFQ) for this project is now posted. Please note the RFQ deadline to submit is July 10, 2023.

Follow this web link to retrieve the document:



The draft design-build scope is found here:



Wednesday, July 19, 2023

Page 1 of 2

Project: PID119007 Location: -

Notice: Other

Type:

Date: 5/25/2023

Let Date:

The Ohio Department of Transportation is anticipating the letting of a District 2 Bridge Rehabilitation DesignBuild Project for WOO-75-29.93. The existing Lime City Road bridge over IR-75, SFN #8704716 is a four (4) span, steel girder bridge that is 475 feet in length. It was originally constructed in 1967 then reconstructed in 1991. The proposed project will include (but not limited to) raising the superstructure and widening the bridge to include a multi-use path.

The Department will advertise the Request for Qualifications for those entities interested in serving as the Design Built Team on June 5, 2023. The project will be procured as a two-step design-build with an intermediate technical proposal and an abbreviated alternative technical concept review process.

The Statement of Qualifications (SOQ) is anticipated for Monday, July 3, 203 with the anticipated shortlist announcement scheduled for Tuesday, August 1, 2023.

Project: 230322

Location: LAK-US 20-19.59 Major Rehab (PART 1 AND PART 2)

Notice: Other

Type: MAJOR RECONSTRUCTION

Date: 4/12/2023

Let Date: Thursday, July 20, 2023

Major Project

FOR IMPROVING VARIOUS SECTIONS IN PAINESVILLE TOWNSHIP, PERRY TOWNSHIP, MADISON TOWNSHIP, AND NORTH PERRY VILLAGE; IN LAKE COUNTY; OF THE STATE OF OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS BY WIDENING APPROXIMATELY 9 MILES OF US-20, RESURFACING, INSTALLING SIDEWALK, DRAINAGE, SIGNALS, AND ALL RELATED WORK.

Wednesday, July 19, 2023

Page 2 of 2

................
................