Please acknowledge the receipt of the same.

be carried out at destination after receipt of materials. 5. Delivery :-The materials should be kept ready for inspection within 30days from the date of issue of the purchase order . The materials should be despatched only after the inspection is conducted and despatch instruction issued by this office. The inspection note with tests certificate as ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download