Report of ISO/TC 67/SC 4/WG 6 - 1999-04-30



|[pic] [pic] | | |

| | | |

| |Our date: - |Our ref.: Per Kristian Lesund |

| | | |

| |Your date: |Your ref.: |

|Secretariat of ISO/TC 67/SC 4/WG 6 |ISO/TC 67/SC 4/WG 6 N 152 | |

|“Subsea equipment” | | |

1999-03-19

ISO/TC 67/SC 4 N 180

STATUS REPORT

ISO/TC 67/sc 4/WG 6 “SUBSEA EQUIPMENT”

1 TITLE AND SCOPE

Title: Subsea equipment.

Scope: Standardisation of subsea equipment for the petroleum and natural gas industries.

2 CONVENORSHIP

|Convenor: |Name: |Olav Inderberg |

| |Company: |Kongsberg Offshore |

| |Address: |P.O.Box 1012, 3601 Kongsberg, Norway |

| |Phone: |+47 32 73 98 98 (direct: +47 32 73 93 75) |

| |Fax: |+47 32 73 93 78 (direct: +47 32 73 96 60) |

| |E-mail: |olav.inderberg@fmc.kos.no |

3 SECRETARIAT

|Secretary: |Name: |Per Kristian Lesund |

| |Company: |Norwegian Technology Standards Institution |

| |Address: |P.O.Box 7072 Majorstua, 0306 Oslo, Norway |

| |Phone: |+47 22 59 01 00 (direct: +47 22 59 01 19) |

| |Fax: |+47 22 59 01 29 |

| |E-mail: |pkl@nts.no |

4 PROJECT AND TARGET DATES

|ISO 13628-1 |Petroleum and natural gas industries - Design and operation of subsea production |

| |systems - |

| |Part 1: General requirements and recommendations |

| |Stage 20.20 |Stage 30.20 |Stage 40.20 |Stage 50.20 |Stage 60.60 |

|Original target | |95/06 |95/12 |96/10 |97/05 |

|Revised target | |96/06 |96/12 |98/04 |99/05 |

|Actual target |95/02 |96/09 |97/06 |98/10 | |

|Project leader: |Mr. William Bakke, Norsk Hydro ASA, Norway |

|ISO/DIS 13628-2 |Petroleum and natural gas industries - Design and operation of subsea production |

| |systems - |

| |Part 2: Flexible pipe systems for subsea and marine applications |

| |Stage 20.20 |Stage 30.20 |Stage 40.20 |Stage 50.20 |Stage 60.60 |

|Original target | |95/06 |95/12 |96/10 |98/05 |

|Revised target | |97/03 |98/06 |99/06 |00/01 |

|Actual target |96/03 |97/03 |98/08 | | |

|Project leader: |Mr. Sijm Last, SIPM, The Netherlands |

|ISO/DIS 13628-3 |Petroleum and natural gas industries - Design and operation of subsea production |

| |systems - |

| |Part 3: Through Flowline (TLF) systems |

| |Stage 20.20 |Stage 30.20 |Stage 40.20 |Stage 50.20 |Stage 60.60 |

|Original target | |99/10 |00/08 |01/06 |02/01 |

|Revised target | | |98/10 |99/12 99/08 |00/07 00/01 |

|Actual target | |98/04 |99/01 | | |

|Project leader: |John Yonker, Halliburton Energy Services, USA |

|ISO 13628-4 |Petroleum and natural gas industries - Design and operation of subsea production |

| |systems - |

| |Part 4: Subsea wellhead and tree equipment |

| |Stage 20.20 |Stage 30.20 |Stage 40.20 |Stage 50.20 |Stage 60.60 |

|Original target | |96/06 |96/12 |97/10 |98/05 |

|Revised target | | | |98/04 |98/09 |

|Actual target |95/06 |96/05 |97/06 |98/11 | |

|Project leader: |Mr. Dave Garnham, CAMERON, UK |

|ISO/CD 13628-5 |Petroleum and natural gas industries - Design and operation of subsea production |

| |systems - |

| |Part 5: Subsea control umbilicals |

| |Stage 20.20 |Stage 30.20 |Stage 40.20 |Stage 50.20 |Stage 60.60 |

|Original target | |96/01 |96/07 |97/05 |97/12 |

|Revised target | |98/04 |99/02 99/05 |99/12 00/03 |00/07 00/10 |

|Actual target |98/02 |98/05 | | | |

|Project leader: |Mr. Fred Brink, SIEP, The Netherlands |

|ISO/DIS 13628-6 |Petroleum and natural gas industries - Design and operation of subsea production |

| |systems - |

| |Part 6: Subsea production control systems |

| |Stage 20.20 |Stage 30.20 |Stage 40.20 |Stage 50.20 |Stage 60.60 |

|Original target | |96/01 |96/07 |97/05 |97/12 |

|Revised target | |96/12 |98/05 |99/06 |00/01 |

|Actual target |95/06 |97/05 |98/07 | | |

|Project leader: |Mr. Jens Henrik Neuenkirchen, Statoil, Norway |

|ISO/WD 13628-7 |Petroleum and natural gas industries – Design and operation of subsea production |

| |systems – |

| |Part 7: Workover/completion riser systems |

| |Stage 20.20 |Stage 30.20 |Stage 40.20 |Stage 50.20 |Stage 60.60 |

|Original target | |96/01 |96/07 |97/05 |97/12 |

|Revised target |98/03 |98/06 99/06 |98/12 99/12 |99/10 00/10 |00/03 01/03 |

|Actual target |98/07 | | | | |

|Project leader: |Mr. Anthony Muff, Kongsberg Offshore, Norway |

|ISO/WD 13628-8 |Petroleum and natural gas industries - Design and operation of subsea production |

| |systems - |

| |Part 8: Remotely Operated Vehichles (ROV) interfaces on subsea production systems |

| |Stage 20.20 |Stage 30.20 |Stage 40.20 |Stage 50.20 |Stage 60.60 |

|Original target | |96/01 |96/07 |97/05 |97/12 |

|Revised target | |98/11 99/04 |99/05 99/11 |00/03 00/09 |00/08 01/02 |

|Actual target | | | | | |

|Project leader: |Mr. Tim Marsh, Shell UK |

|ISO/DIS 13628-9 |Petroleum and natural gas industries - Design and operation of subsea production |

| |systems - |

| |Part 9: Remotely Operated Tool (ROT) intervention systems |

| |Stage 20.20 |Stage 30.20 |Stage 40.20 |Stage 50.20 |Stage 60.60 |

|Original target | | | | | |

|Revised target | |96/06 |98/06 |99/04 99/05 |99/09 99/10 |

|Actual target |95/11 |97/09 |98/07 | | |

|Project leader: |Mr. Johan Bruun-Olsen, Statoil, Norway |

|ISO/WD 16389 |Petroleum and natural gas industries – Drilling and production equipment - |

| |Dynamic production risers |

| |Stage 20.20 |Stage 30.20 |Stage 40.20 |Stage 50.20 |Stage 60.60 |

|Original target |98/12 |99/10 |00/08 |01/06 |02/01 |

|Revised target | | | | | |

|Actual target |99/02 | | | | |

|Project leader: |Mr. Bernt Leira, SINTEF, Norway |

5 MEETINGS

|Held: |No. |Date |Location |

| |1 |1993-03-03 |Oslo |

| |2 |1993-05-26 |Oslo |

| |3 |1993-06-21 |New Orleans |

| |4 |1993-09-17 |Oslo |

| |5 |1994-08-09 |Oslo |

| |6 |1995-03-22 |Oslo |

| |7 |1995-06-15/17 |The Hague |

| |8 |1995-09-26/27 |Milan |

| |9 |1995-12-13/14 |Houston |

| |10 |1996-03-27/28 |Oslo |

| |11 |1996-06-25/26 |Atlanta |

| |12 |1996-09-18 |Oslo |

| |13 |1997-01-13/14 |Dallas |

| |14 |1997-04-23/24 |The Hague |

| |15 |1997-07-16 |Denver |

| |16 |1997-10-08 |Celle |

| |17 |1998-02-03/04 |Houston |

| |18 |1998-04-22/23 |The Hague |

| |19 |1998-06-16 |Dallas |

| |20 |1998-09-22/23 |The Hague |

| |21 |1999-02-18 |Houston |

|Future: |22 |1999-04-21 |The Hague |

| |23 |1999-06-16 |New Orleans |

| |24 |1999-09- |Oslo ? |

6 ISO/TC 67/SC4/WG 6 members

Brazil: Mr. Cæsar Paulo

Petrobas

CENPES

Cidade Universitaria, Ilema do Funcao

21910 Rio de Janeiro RJ

Brazil

Phone: +55 21 598 6297

Fax: +55 21 598 6793

Email:

France: Mr.Michel Iato

Elf Aquitaine Production

EP/P/PRO/FTS

CSTJF Avenue Laribau

64018 Pau Cedex

France

Phone: +33 5 59 83 51 28

Fax: +33 5 59 83 65 65

Email: michel.iato@elf-p.fr

Italy: Mr. Steven P. Dean

ENI-AGIP/TESO

via Emilia1,

200097 San Donato Milanese

Italy

Phone: +39 2 520 63 827

Fax: +39 2 520 61 887

Email:

Netherlands: Mr.Ron Dee

Shell Internationale Exploration and Production B.v.

EPT - DD

P.O.Box 60

2280 AB Rijswijk

The Netherlands

Phone: +31 70 311 xxxx

Fax: +31 70 311 2085

Email: r.dee@sidsbv.

Norway: Mr. Christopher Fougner

Norsk Hydro ASA

P.O.Box 200

1321 Stabekk

Norway

Phone: +47 22 73 81 00

Fax: +47 22 73 95 37

Email: christopher.fougner@nho.

Mr. Helge Kristiansen

Kværner Oilfield Products a.s

P.O.Box 9357 Grønland

0135 Oslo

Norway

Phone: +47 22 66 61 96 (direct line)

Fax:

Email: helge.kristiansen@ken.

Mr. Bernt Leira

SINTEF Civil and Environmental Eng.

7034 Trondheim

Norway

Phone: +47 73 59 59 89

Fax: +47 73 59 20 66

Email: bernt.leira@civil.sintef.no

Mr. Ove Magne Kallestad

Statoil

4035 Stavanger

Norway

Phone: +47 51 80 80 80

Fax: +47 51 80 62 70

Email: ovka@statoil.no

United

Kingdom: Mr. Tim Marsh

UESC/9

Shell U.K. Exploration and Production

1 Altens Farm Road

Aberdeen AB9 2HY

Scotland

Phone: +44 1 224 88 2087

Fax: +44 1 224 88 2018

Email: t.r.marsh@openmail1.uesc9.sukepabe.

Mr.Dave Garnham

CAMERON

Cooper Cameron (U.K.) Ltd.

Queen Street, Stourton

Leeds LS10 1SB

United Kingdom

Phone: +44 113 270 1144

Fax: +44 113 276 4348

Email: garnhamd@

USA: Mr. Jason Beckstrom

American Petroleum Institute

1220 L Street NW

Washington, D.C. 20005 - 4070

USA

Phone: +1 202 682 8494

Fax:

Email: beckstromj@

Mr. Brian D. Boles

Exxon Production Research

P.O.Box 2189

Houston, TX 77252-2189

USA

Phone: +1 713 431 7231

Fax: +1 713 431 6194

Email: brian.boles@exxon.

Mr. George K. Wolfe

Southwest Research Institute

P.O.Drawer 28510

6220 Culebra Road (78228-0510)

San Antonio, TX 78284

USA

Phone: +1 210 522 2428

Fax: +1 210 522 3042

Email: gwolfe@swri.edu

Mr. John Yonker

Halliburton Energy Services

PO Box 819052

Dallas, Texas 75381-9052

USA

Phone: +1 972 418 3000

Fax: +1 972 418 4051

Email: jyonker@

Interested parties (receipt of papers only):

Mr. Sjoerd F. Schuyleman

The Institute of Petroleum

61 New Cavendish Street

London W1M 8AR

England

Phone: +44 171 465 7132

Fax: +44 171 255 1472

Email: sfs@instpet.co.uk

AREAS OF CONCERN

7.1 General

Preparation of drafts, concensus building and commenting have revealed to be more time consuming than it was possible to foresee when the project started. Most of the project leaders

have experienced that they have not been given the necessary resources and time to prepare the draft standards as originally planned. The main reason for the delay of some parts of the standard

is therefore delayed input to the WG 6 secretariat. There are no hold-backs related neither to the ISO/TC 67/SC 4 secretariat nor the WG 6 secretariat.

2. ISO 13628-7

ISO/WD 13628-7 is severely delayed due to the following reasons:

The basis for the developement of ISO/WD 13628-7 was API RP 17G. At an early stage it was recognised that API RP 17G would need considerable changes to convert it from a recommended

practice to a standard. In addition at the start of the project it was observed that there were limited published design guide rules for dynamic risers. It was considered by the task group that the new ISO standard should be applicable for present well completions in shallow to moderate waters dephts and for future deep water operations. It was decided therefore, to base the new ISO standard on the JIP for ”Design Rules for deep Water Riser”. This is a joint DNV, SINTEF and SeaFlex project supported by the major oil companies. The JIP was planned to be complete by the summer of 1998, but unfortunately has over run and will not be complete until the summer of 1999.

The next revision of the ISO standard will be released from the task group in April 1999. It will include the relevant design rules and requirements from the JIP plus functional requirements on

API RP 17G, NORSOK and comments from the review of previous revisions.

The task group would like to take this opportunity to apologise for the delay in releasing the committee draft of ISO standard, but it is considered that if this new ISO standard is going to provide a contribution to the industry, premature publication would not benefit the development of the standard.

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download