ATTACHMENT A



ADDENDUM 4

DATE: January 14, 2016

PROJECT: UTPB Sprinkler Head Replacement

ITB NO: ITB 744-B1611

OWNER: University of Texas Health Science Center

Houston, Texas

TO: Prospective Proposers

This Addendum forms part of and modifies Proposal Documents dated,

December 17, 2015, with amendments and additions noted below.

Question(s) that were submitted before the deadline:

1. Please confirm that this project is to follow the Harris County Building Construction Prevailing Wage Rates (Quarter 4 of 2015) found at

Confirmed; that this is the correct wage schedule.

2. Please confirm that a full time superintendent is required for the duration of the project.

Confirmed; a full time superintendent is required for this project.

3. Please confirm that there is no asbestos abatement in this project’s scope of work.

There is no known asbestos materials to be disturbed during this project.  If suspect ACBM is found/identified, work is to stop and the UT Project Manager notified.  Any required abatement would be coordinated and funded by UTHealth.

4. Since there are no sprinklers marked on Addendum 2, are we to assume all the sprinklers on the first floor are to be changed?

This is a false assumption.  Refer to Addendum 2; it shows a total of 64 heads for level 1 to be changed.  The second page includes a floor plan that has the following breakdown: lobby areas (43 heads), mail area (9 heads), and suite 110 (12 heads).

5. Please confirm that the ceiling on the first floor is plaster or drywall?

The first floor ceiling is drywall.

6. Would it be possible for us to get access to floors 2 through 15 to view the existing conditions? Perhaps early in the day this Thursday 1/14 or Friday 1/15?

We understand that we may not be able to access all areas, but would appreciate the opportunity to see a representative sampling of the various conditions.  

Access cannot be granted on those floors in UTPB during the daytime work hours, Monday-Friday 7AM-5PM, since this is a mix of patient care and office spaces. So, a second pre-bid meeting has been scheduled for Thursday, January 14, 2016 at 5PM. Please refer to Addendum 3.

END OF ADDENDUM 4

................
................