InPatient Pharmacy Remodeling Tampa General Hospital ...

InPatient Pharmacy Remodeling

DIVISION 0 ? TGH DOCUMENTS

Section 00010 Section 00015

Table of Contents List of Drawings

DIVISION 1 ? GENERAL REQUIREMENTS

Section 00700 Section 01010 Section 01027 Section 01028 Section 01035 Section 01040 Section 01044 Section 01045 Section 01091 Section 01200 Section 012300 Section 01300 Section 01500 Section 01561

Section 01700 Section 01710 Section 01720 Section 01730 Section 01740 Section 018000

General Conditions Summary of Work Applications for Payment Schedule of Values and Project Schedule Modification Procedures Project Coordination Contractor's Requests for Information Cutting and Patching Reference Standards Project Meetings Alternates Submittals Construction Facilities and Temporary Controls Airborne Contaminants Control Appendix: Infection Control Risk Assessment & Worksheet Contract Closeout Final Cleaning Project Record Documents Operation and Maintenance Data Warranties Construction Administration Forms

DIVISION 2 ? SITE CONSTRUCTION Section 020700 Selective Demolition

DIVISION 5 - METALS Section 055000 Metal Fabrications Pages Section 055213 Pipe and Tube Railing

DIVISION 6 ? WOOD & PLASTICS Section 061053 Miscellaneous Rough Carpentry Section 064023 Interior Architectural Woodwork

DIVISION 7 ? THERMAL AND MOISTURE PROTECTION

Section 075216 Section 078100 Section 078413 Pages Section 079200 Section 079500 Pages

Membrane Roofing Applied Fireproofing Penetration Firestopping

Joint Sealants Expansion Control

Tampa General Hospital

4 Pages 2 Pages

9 Pages 4 Pages 1 Page 1 Page 2 Pages 3 Pages 2 Pages 2 Pages 7 Pages 3 Pages 2 Pages 4 Pages 5 Pages 7 Pages 4 Pages 3 Pages 1 Page 2 Pages 2 Pages 2 Pages 21 Pages

4 Pages

3

4 Pages

3 Pages 4 Pages

1 Page 1 Page

4

5 Pages 4

(0909C) TABLE OF CONTENTS

00010 - 1

InPatient Pharmacy Remodeling

DIVISION 8 ? DOORS AND WINDOWS

Section 081113 Hollow Metal Frames Section 081416 Flush Wood Doors Section 083113 Access Door and Frames Section 084229 Automatic Power Operators Section 084229.23 Sliding Automatic Entrances Section 087100 Door Hardware Section 088000 Glazing

DIVISION 9 ? FINISHES

Section 092216 Non-Structural Metal Framing Section 092900 Gypsum Board Section 093000 Tiling Section 095113 Suspended Panel Ceilings Section 096513 Resilient Base and Accessories Section 096516 Resilient Sheet Flooring Section 096516.13 Linoleum Flooring Section 096816 Sheet Carpeting Section 099123 Interior Painting

DIVISION 10 ? SPECIALTIES

Section 102600 Section 102800 Pages Section 104413 Section 104416 Section 105113 Section 109000

Wall and Door Protection Toilet, Bath and Laundry Accessories

Fire Extinguisher Cabinets Fire Extinguishers Metal Lockers Miscellaneous Specialties

DIVISION 12 - FURNISHINGS

Section 122113 Horizontal Louver Blinds

DIVISION 13 - SPECIAL CONSTRUCTION

Section 130650 Bullet Resistant Products

Tampa General Hospital

5 Pages 4 Pages 3 Pages 5 Pages 7 Pages 12 Pages 5 Pages

4 Pages 4 Pages 4 Pages 4 Pages 4 Pages 4 Pages 4 Pages 3 Pages 6 Pages

4 Pages 3

3 Pages 3 Pages 4 Pages 2 Pages

3 Pages

5 Pages

(0909C) TABLE OF CONTENTS

00010 - 2

InPatient Pharmacy Remodeling

Tampa General Hospital

DIVISION 15 - MECHANICAL

Section 15010 Basic Mechanical Requirements Section 15015 Product Substitutions Section 15020 Shop Drawings and Submittals Section 15060 Pipes and Pipe Fittings Section 15100 Valves Section 15120 Piping Specialties Section 15135 Meters and Gauges Section 15140 Supports and Anchors Section 15150 Medical Gas Section 15170 Motors Section 15190 Mechanical Identification Section 15250 Mechanical Insulation Section 15300 Fire Protection Section 15411 Water Distribution Piping Section 15420 Drainage and Vent Systems Section 15440 Plumbing Fixtures Section 15510 Hydronic Piping Section 15850 Air Handling Section 15855 Air Handling Units Section 15857 Variable Frequency Drives Section 15890 Duct Cleaning Section 15891 Metal Ductwork Section 15910 Ductwork Accessories Section 15932 Air Outlets and Inlets Section 15933 Air Terminals Section 15975 Energy Management and Automatic Temperature Control System Section 15990 Testing, Adjusting and Balancing

DIVISION 16 - ELECTRICAL

Section 16010 Section 16110 Section 16120 Section 16135 Section 16142 Pages Section 16143 Section 16190 Section 16195 Section 16452 Section 16460 Section 16470 Section 16475 Section 16515 Section 16721 Section 16740

Basic Electrical Requirements Raceways Wires and Cables Electrical Boxes and Fittings Electrical Connections for Equipment

Wiring Devices Supporting Devices Electrical Identification Grounding Transformers Panelboards Surge Protection Devices (SPD) Lighting Fixtures Fire Alarm Systems Telephone and Data Systems

END OF SECTION 00010

5 Pages 3 Pages 4 Pages 6 Pages 9 Pages 5 Pages 3 Pages 4 Pages 3 Pages 3 Pages 6 Pages 5 Pages 6 Pages 4 Pages 5 Pages 3 Pages 9 Pages 10 Pages 7 Pages 9 Pages 7 Pages 7 Pages 4 Pages 2 Pages 2 Pages 8 Pages 7 Pages

5 Pages 6 Pages 3 Pages 4 Pages

3

3 Pages 3 Pages 2 Pages 4 Pages 2 Pages 3 Pages 4 Pages 3 Pages 4 Pages 1 Page

(0909C) TABLE OF CONTENTS

00010 - 3

InPatient Pharmacy Remodeling DRAWING TABLE OF CONTENTS

Tampa General Hospital

GENERAL

--A0.1

COVER SHEET TABLE OF CONTENTS, SYMBOLS AND LEGEND, ABBREVIATIONS AND SITE MAP

ARCHITECTURAL

A1.2

LIFE SAFETY PLAN ? SECOND FLOOR

A2.0 A2.1 A2.2 A2.3 A2.4

DEMOLITION PLAN ? PARTIAL SECOND FLOOR FLOOR PLAN - PARTIAL SECOND FLOOR PLAN ENLARGED FLOOR PLAN FLOOR PLAN ? PARTIAL SECOND PHASING FLOOR PLAN FLOOR PLAN -PARTIAL 3RD, 4TH, 5TH, 6TH FLOOR PLAN & ROOF PLAN

A3.1 A3.2

ROOM FINISH SCHEDULE & WALL PARTITION SCHEDULE UL LISTING ? FOR REFERENCE ONLY

A4.1

DOOR AND FRAME SCHEDULE

A9.1

DOOR AND FRAME DETAILS

A10.1

RATED DETAILS

A11.1

REFLECTED CEIILNG PLAN ? PARTIAL SECOND FLOOR

A12.1 A12.2 A12.3 A12.4

CASEWORK ELEVATIONS CASEWORK ELEVATIONS AND DETAILS CASEWORK DETAILS CASEWORK DETAILS

ID1.1

FLOOR PATTERN AND ACCENT PAINT LOCATION

STRUCTURAL

S1.1

GENERAL STRUCTURAL NOTES, PLANS AND DETAILS

PLUMBING

P1.00

PLUMBNG DEMOLITION AND NEW CONSTRUCTION

P2.00

PLUMBING RISERS DETAILS, NOTES AND SCHEDULES

MECHANICAL

M1.0

MECHANICAL PHASE 1 DEMOLITION HVAC PLAN

M2.0

MECHANICAL PHASE 1 NEW CONSTRUCTION PLAN

(0909) DRAWING TABLE OF CONTENTS

W:\0909\SPECS\SHORT\00015-DWG TOC.doc

00015 - 1

InPatient Pharmacy Remodeling

Tampa General Hospital

M3.0

MECHANICAL PHASE 2 DEMOLITION AND PHASE 1 NEW CONSTRUCTION PLAN

M4.0

MECHANICAL PHASE 2 NEW CONSTRUCTION PLAN

M5.0

MECHANICAL PARTIAL 3RD, 4TH, 5TH, 6TH FLOOR PLANS, ROOF PLAN AND SCHEDULE

M6.0

MECHANICAL DETAILS

FIRE PROTECTION

FP1.00

FIRE PROTECTION DEMOLITION AND NEW CONSTRUCTION PLAN

FP2.00

FIRE PROTECTION NOTES

ELECTRICAL

E0.0

ELECTRICAL SYMBOL, LEGEND AND DETAILS

E1.0

ELECTRICAL DEMOLITION PLAN

E2.0

LIGHTING PLAN

E3.0

POWER AND PARTIAL SYSTEMS PLAN

E4.0

HVAC EQUIPMENT POWER PLAN

E5.0 E5.04 E5.05

FIRE ALARM CONTROL, DIAGRAM AND PARTIAL SYSTEMS PLAN FOURTH FLOOR PLAN - SYSTEMS FIFTH FLOOR PLAN ? SYSTEMS

E6.0

EXISTING ONE ? LINE DIAGRAM

E7.0

NEW ONE-LINE DIAGRAM AND LOAD SUMMARIES

E8.0

PANEL SCHEDULES

(0909) DRAWING TABLE OF CONTENTS

W:\0909\SPECS\SHORT\00015-DWG TOC.doc

00015 - 2

InPatient Pharmacy Remodeling

Tampa General Hospital

SECTION 00700 - GENERAL CONDITIONS PART 1 - GENERAL

1. 1 GENERAL PROVISIONS

A. "Work" means all necessary and reasonably inferable construction and services required by the Contract Documents, whether completed or partially completed, and includes all other labor, materials, equipment and services provided or to be provided by the Contractor to fulfill the Contractor's obligations. The Work may constitute the whole or a part of the Project. The Contractor shall provide all work and materials, which any part of the Contract Documents requires him to provide.

1. The term Contractor shall mean in direct contract with the Owner. Subcontractors have an indirect relationship to the Owner by being in agreement directly with the Contractor. The terms may appear to be interchanged within the documents, with the use defined by the relationship of one with the Owner.

B. Execution of the Contract by the Contractor is a representation that the Contractor has visited the site, become familiar with local conditions under which the Work is to be performed and correlated personal observations with requirements of the Contract Documents. By executing the Contract, the Contractor acknowledges that he has satisfied himself as to the nature and location of the Work, the general and local conditions, including those bearing upon transportation, disposal, handling and storage of materials and waste, availability of labor, water, electric power, roads and uncertainties of weather, ground water table or similar physical conditions of ground, the character, quality and quantity of surface and sub-surface materials to be encountered, the character of equipment and facilities needed prior to and during the execution of the Work and all other matters which can in any way affect the work or the cost thereof under this Contract. Any failure by the Contractor to acquaint himself with all the available information concerning these conditions will not relieve him from any obligations with respect the Contract Documents.

C. The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work by the Contractor. In the event of a conflict or inconsistency among the Contract Documents, or between the Contract Documents and applicable codes, the Contractor shall provide the greatest quantity, largest degree of safety, highest quality or most stringent material or work.

1. 2 DEFAULT

If the Contractor defaults or neglects to carry out the Work in accordance with the Contract Documents and fails within a seven-day period after written notice from the Owner to commence and continue correction of such default or neglect with diligence and promptness, the Owner may without prejudice to other remedies the Owner may have, correct such deficiencies. In such case the Owner may deduct from payments then or thereafter due the Contractor the entire cost of correcting such deficiencies, including compensation for additional services and expenses and heating, engineering, accounting, consulting services, attorneys' and legal assistants' fees and expenses made necessary by such default, neglect, or failure. If payments then or thereafter due the Contractor are not sufficient to cover such amounts, the Contractor shall pay the difference to the Owner. The Owner's actions pursuant to this Subparagraph shall not operate as a release of any obligation of a surety.

(0909) GENERAL CONDITIONS

00700-1

................
................