E&SC (SOUTH PARKING LOT)
REFERENCES
?ALTA/ACSM SURVEY:
R.B. PHARR & ASSOCIATES, P.A. "ALTA/ACSM LAND TITLE SURVEY PREPARED FOR TOPGOLF USA CHARLOTTE, LLC WEST ARROWOOD ROAD CITY OF CHARLOTTE, STEELE CREEK TOWNSHIP, MECKLENBURG COUNTY, NORTH CAROLINA" PROJECT NO.: 83657 DATED: 04/19/16
?ARCHITECTURAL PLANS:
ARIA GROUP ARCHITECTS INC. TOPGOLF ARROWOOD AND INTERSTATE 485 CHARLOTTE, NORTH CAROLINA 28273 ISSUED FOR PERMIT/GMAX 12/01/15
?GEOTECHNICAL REPORT:
ECS CAROLINAS, LLP "REPORT OF SUBSURFACE EXPLORATION, TOPGOLF CHARLOTTE, CHARLOTTE, NORTH CAROLINA" PROJECT NO.: 08-11102 DATED: 11/04/15
UTILITY RESPONSIBILITY MATRIX FOR THIS PROJECT
GAS
UTILITY/ GOVERNING AGENCIES CONTRACTOR RESPONSIBILITYCONTACTS
?PIEDMONT NATURAL GAS
3901 CRAIG AVE CHARLOTTE, NC 28211 (800)752 - 7504
-COORDINATE CONSTRUCTION ACTIVITIES WITH GAS COMPANY TO ENSURE INSTALLATION OF GAS LINES ARE COMPLETED PRIOR TO ASPHALT OR CURB PLACEMENT (IF APPLICABLE).
-INSTALL BOLLARD PROTECTION AROUND GAS METER AND PER THE GAS COMPANY REQUIREMENTS.
OTHERS RESPONSIBILITY-
-SERVICE FROM THE POINT OF CONNECTION AT THE EXISTING LINE UP TO AND INCLUDING SETTING OF METER WILL BE BY THE GAS COMPANY.
-ANY RELOCATION OF EXISTING LINES WILL BE DONE BY THE GAS COMPANY.
TELEPHONE
?BELL SOUTH TELECOMMUNICATIONS
333 W 24TH ST CHARLOTTE, NC 28206 (704)525-3882
-COORDINATE CONSTRUCTION ACTIVITIES WITH TELEPHONE COMPANY TO ENSURE INSTALLATION OF UNDERGROUND LINES ARE COMPLETED PRIOR TO ASPHALT OR CURB PLACEMENT.
-COORDINATE RELOCATION OF PHONE BOXES WITH TELEPHONE COMPANY WITHIN 10 DAYS OF AWARD OF CONTRACT.
-PROVIDE AND INSTALL 2-4" SCHEDULE 40 PVC CONDUITS WITH PULL ROPES, INCLUDING ALL TRENCHING AND BACKFILLING, FROM THE RISER POLE UP TO THE BUILDING.
-PROVIDE AND INSTALL PULL BOXES AS PER TELEPHONE COMPANY REQUIREMENTS.
-TELEPHONE COMPANY WILL PROVIDE AND INSTALL ALL TELEPHONE CABLES FROM THE POINT OF CONNECTION UP TO THE BUILDING -PRESENT RESPONSIBLE PARTIES.
-ANY RELOCATION OF EXISTING LINES WILL BE DONE BY TELEPHONE COMPANY.
ELECTRIC
?DUKE POWER ENERGY
610 TODDVILLE RD, CHARLOTTE, NC 28214 (704)401-8608
SANITARY SEWER
?CHARLOTTE WATER
600 E 4TH ST CHARLOTTE, NC 28202 (704)336-7600
-COORDINATE CONSTRUCTION ACTIVITIES WITH ELECTRIC COMPANY TO ENSURE INSTALLATION OF UNDERGROUND LINES ARE COMPLETED PRIOR TO ASPHALT OR CURB PLACEMENT.
-COORDINATE RELOCATION OF UTILITY POLES WITH ELECTRIC COMPANY WITHIN 10 DAYS OF AWARD OF CONTRACT.
-PROVIDE AND INSTALL 2-4" SCHEDULE 40 PVC CONDUITS WITH PULL ROPES, INCLUDING TRENCHING AND BACKFILLING, FOR THE UNDERGROUND PORTIONS OF THE PRIMARY FROM THE RISER POLE UP TO THE TRANSFORMER. SCHEDULE 80 PVC CONDUITS SHALL BE USED ON THE RISER POLE AND RIGID METAL, LONG RADIUS ELBOWS SHALL BE USED WHERE THE UNDERGROUND PORTION MEETS THE RISER POLE AND TRANSFORMER.
- REMOVE EXISTING TRANSFORMER PAD AS PER THE ELECTRIC COMPANY'S SPECIFICATIONS.
-CONSTRUCT TRANSFORMER PAD AS PER THE ELECTRIC COMPANY'S SPECIFICATIONS.
-PROVIDE AND INSTALL ALL SECONDARY SERVICE AND MATERIALS. -RELOCATE UTILITY POLES AND OVERHEAD LINES AS REQUIRED.
-PROVIDE AND INSTALL SANITARY SEWER LINES AND ASSOCIATED APPURTENANCES PER THE PLANS AND SPECIFICATIONS.
-ALL PUBLIC AND PRIVATE SANITARY SEWER LINES SHALL MEET SPECIFICATIONS.
-COORDINATE REQUIRED INSPECTION SERVICES WITH ENGINEER OF RECORD AND THE UTILITIES DIVISION. SEE UTILITY PLAN FOR REQUIREMENTS.
-ELECTRIC COMPANY WILL PROVIDE AND INSTALL ALL MATERIALS NEEDED TO ESTABLISH PRIMARY OVERHEAD SERVICE FROM POINT OF CONNECTION AT THE EXISTING LINE UP TO THE TRANSFORMER.
-ELECTRIC COMPANY WILL PROVIDE AND INSTALL PRIMARY CABLE FOR ALL UNDERGROUND LINES UP TO THE TRANSFORMER.
-RELOCATE UTILITY POLES AND OVERHEAD LINES AS REQUIRED. -ELECTRIC COMPANY WILL PROVIDE TRANSFORMER.
WATER
?CHARLOTTE WATER
600 E 4TH ST CHARLOTTE, NC 28202 (704)336-7600
-PROVIDE AND INSTALL ALL WATER MAINS AND ASSOCIATED APPURTENANCES PER THE PLANS AND SPECIFICATIONS.
-ALL PORTIONS OF THE FIRE PROTECTION WATER SYSTEM SHALL BE INSTALLED BY A LICENSED FIRE SPRINKLER CONTRACTOR.
-ALL PORTIONS OF OTHER NON FIRE PROTECTION RELATED LINES MAY BE INSTALLED BY THE PLUMBING CONTRACTOR.
-COORDINATE REQUIRED INSPECTION SERVICES WITH ENGINEER OF RECORD AND THE UTILITIES DIVISION. SEE UTILITY PLAN FOR REQUIREMENTS.
-CONTRACTOR SHALL PROVIDE AND INSTALL WATER METER WITH UTILITY DIVISION.
311 UTILITIES ?CHAR-MECK UTILITY DEPARTMENT
DIAL 311 OR (704)336-7600
STORM SEWER
?CHAR-MECK STORM WATER SERVICES
600 EAST FOURTH STREET 12TH AND 14TH FLOORS CHARLOTTE, NC 28202 (704) 336-5385 CONTACT: ROBERT ZINK
-PROVIDE AND INSTALL ALL STORM SEWER LINES AND ASSOCIATED APPURTENANCES PER THE PLANS AND SPECIFICATIONS.
-REFER TO GRADING PLAN FOR INFORMATION ON ALLOWABLE STORM SEWER MATERIALS.
-PIPE JOINTS TO BE SILT TIGHT. -CLEAN EXISTING PIPES IMMEDIATELY DOWNSTREAM OF
CONNECTION.
THIS MATRIX HAS BEEN PROVIDED FOR INFORMATIONAL PURPOSES. THE CONTRACTOR SHALL PROVIDE ANY AND ALL APPURTENANCES, TRENCHING AND BACKFILL, AND OTHER INCIDENTALS TO MEET OR EXCEED THE SPECIFICATIONS OF THE ITEMS LISTED.CONTRACTOR SHALL VERIFY
RESPONSIBILITIES PRIOR TO BID. CONTRACTOR SHALL CONTACT PROVIDER WITH SUFFICIENT LEAD TIME TO NOT IMPACT PROJECT SCHEDULE.
TM
BALTIMORE, MD SOUTHERN MARYLAND NORTHERN VIRGINIA CENTRAL VIRGINIA CHARLOTTE, NC RALEIGH, NC WASHINGTON, DC
SITE CIVIL AND CONSULTING ENGINEERING
SITE PLAN DOCUMENTS
REVISION
APPROVED FOR
CONSTRUCTION
CHARLOTTE-MECKLENBURG PLANNING DEPARTMENT
By: Joshua Weaver 2-7-2017 1 of 3
FOR
TOPGOLF CHARLOTTE
LOCATION OF SITE
MOODY LAKE OFFICE PARK WEST ARROWOOD ROAD
CITY OF CHARLOTTE, NORTH CAROLINA MECKLENBURG COUNTY
FINAL APPROVAL
ENGINEERING
PCO / DETENTION / DRAINAGE PLAN
EROSION CONTROL URBAN FORESTRY
TREE ORDINANCE
CDOT
NOTE: SCHEDULE PRE-CONSTRUCTION MEETING AT LEAST 48 HRS. PRIOR TO ANY LAND DISTURBING ACTIVITY USING THE ONLINE FORM AT
By Kelly Robertson at 4:41 pm, Feb 06, 2017
14
LOCATION MAP
COPYRIGHT 2008 DELORME STREET ATLAS 2009 PLUS USA
SCALE: 1"=2000'
OWNER
MOODY LAKE OFFICE PARK DEVELOPMENT LIMITED PARTNERSHIP
5950 FAIRVIEW ROAD, SUITE 200 CHARLOTTE, NC 28210
DEVELOPER
TOPGOLF USA 8750 N. CENTRAL EXPRESSWAY,
SUITE 1200 DALLAS, TX 75231 CONTACT: TED HEILBRON PHONE: (214) 535-0550
CONTRACTOR
ARCO/MURRAY NATIONAL CONSTRUCTION COMPANY, INC.
3110 WOODCREEK DRIVE DOWNERS GROVE, IL 60515
CONTACT: BILL KROL PHONE: (331) 251-2726
PREPARED BY
PCCO SUMMARY
Original Parcel ID Number(s): Development Type: Subject to PCCO? Y/N
If NO, why?
20145118, 20145114, 20145105
Commercial Y -- Click for Dropdown --
Watershed: Disturbed Area (ac): Site Area (ac):
Central Catawba 20 15.63
Total on-site Drainage Area (ac): Existing Built-upon-area (SF): Existing BUA to be removed (SF): Existing BUA to remain (SF): Proposed New BUA (SF):
DA#1 15.63 0 0 0 393,000
DA#2
Proposed % BUA:
58%
Density (High / Low)
High
Total Post-Project BUA for site:
393,000 SF
Development or Redevelopment?
Development
Natural Area Required (ac):
1.56
Natural Area provided, total (ac):
1.56
Undisturbed Treed Natural Area Preserved (ac):
0.17
Total stream buffer protected on-site (ac):
0.84
Transit Station Area? Y/N
No
Distressed Business District? Y/N
No
Mitigation Type (if applicable)
N/A
Natural Area mitigation? Y/N
Y
Buffer Mitigation? Y/N
Y
Total Phosphorous Mitigation? Y/N
N
NC, PLLC NCBELS P-1132
1927 SOUTH TRYON STREET, SUITE 310
CHARLOTTE, NC 28203
Phone: (980) 272-3400
Fax:
(980) 272-3401
NC@
CONTACT:
MICHAEL THEBERGE, P.E.
ISSUED FOR CONSTRUCTION
SIGNATURE DATE
SIGNATURE DATE
SIGNATURE DATE
THIS DOCUMENT IS NOT ISSUED BY BOHLER ENGINEERING FOR CONSTRUCTION WITHOUT (3) SIGNATURES
PROJECT # REVISION DATE:
NOTE:
1. SAVOY CORPORATE DRIVE IS TO BE CITY MAINTAINED.
SHEET INDEX
SHEET TITLE COVER SHEET GENERAL NOTES GENERAL NOTES AND LEGENDS ALTA SURVEY (BY OTHERS) REZONING PLANS (BY OTHERS) EX. CONDITIONS & DEMOLITION PLAN OVERALL SITE PLAN SITE PLAN OVERALL GRADING PLAN GRADING PLAN PRE DRAINAGE AREAS POST DRAINAGE AREAS STORM DRAINAGE SCHEDULES UTILITY PLAN E & SC PHASE I PLAN E & SC PHASE II PLAN E & SC PHASE III PLAN PAVEMENT PLAN TRUCK ROUTE PLAN ROADWAY PLAN AND PROFILE W ARROWOOD ROAD TURN LANES W ARROWOOD ROAD TRUCK TURN W ARROWOOD ROAD SSD PROFILE W ARROWOOD ROAD GRADING PLAN W ARROWOOD ROAD SECTIONS SAVOY CORPORATE DR SECTIONS ROADWAY DETAILS PLANTING PLAN: OVERALL SITE PLANTING PLAN: BUILDING PERIMETER PLANTING PLAN: PCSO BUFFERS PLANTING DETAILS LIGHTING PLAN SITE DETAILS STORM DETAILS UTILITY DETAILS EROSION CONTROL DETAILS
SHEET NUMBER C-1 C-2 C-3 -
RZ-1 - RZ-5 C-4 C-5
C-6 - C-8 C-9
C-10 - C-11 C-12 C-13 C-14 C-15 C-16 C-17 C-18 C-19 C-20
RD-1 - RD-2 RD-3 RD-3A
RD-4 - RD-4A RD-5 - RD-6 RD-7 - RD-15 RD-16 - RD-35 RD-36 - RD-37
L1.0 L1.1 L1.2 L2.0 LI-1 D-1 - D-4 D-5 - D-7 D-8 - D-11 D-12 - D-13
LAND SURVEYING
REVISIONS
REV DATE
COMMENT
BY
10 07/20/16 NCDOT RESUBMISSION
BAB
11 08/15/16 PER ARCHITECT REVISIONS
MAR
12 09/06/16 PCCO REVISIONS
BAB
13 09/07/16 ADDITIONAL PARKING LOT
BAB
14 01/10/17 PER CITY OF CHARLOTTE
BAB
15 01/26/17 PCCO REVISIONS
BAB
16 02/01/17 PCCO/BRIDGE/ LANDSCAPE REVISIONS BAB
WITH C.A
DI G
DIG
.R.E.
CA
LL BEFORE YOU
CALL BEFORE YOU DIG 1-800-632-4949
NORTH CAROLINA
ITS THE LAW
APPROVED FOR CONSTRUCTION
PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.:
NCC152080 KEL MAT
12/04/15 AS NOTED
SD0
PROJECT:
SITE PLAN DOCUMENTS
FOR
LOCATION OF SITE
MOODY LAKE OFFICE PARK WEST ARROWOOD ROAD CITY OF CHARLOTTE, NC MECKLENBURG COUNTY
NC, PLLC NCBELS P-1132
1927 SOUTH TRYON STREET, SUITE 310
CHARLOTTE, NC 28203
Phone: (980) 272-3400
Fax:
(980) 272-3401
NC@
N
I STERED P
BERGE
ANAL ENG I N M I CHA
ORTRHO FCEAS RS OI OLIN
SEAL
020/4306110/17
EER
REG
EL A.
THE
SHEET TITLE:
COVER
SHEET
SHEET NUMBER:
C-1
WARREN, NJ UPSTATE NEW YORK BOSTON, MA NEW YORK METRO PHILADELPHIA/SOUTHERN NJ LEHIGH VALLEY, PA SOUTHEASTERN, PA
PROGRAM MANAGEMENT LANDSCAPE ARCHITECTURE
SUSTAINABLE DESIGN PERMITTING SERVICES TRANSPORTATION SERVICES
T
INTERSTATE HIGHWAY 485 VARIAABSPLHEALWT PIDAVMTEH.DBP.PU3U1B,LBPICLGIR.CO7A2RD1IWGAHYT(7-0OMFP-HW) AY
W. ARRROOAWDOOD VARIAABSLPHEAWLTIPDAVVTPEHDD1PP6UU8B0BL0ILCEAIRCSOTARBDOIWGUNAHYDT(4-5OMFP-HW) AY
15
10
16
10 8
14 14
20
6
MATCHLINE - SHEET C-6 MATCHLINE - SHEET C-7
73 9
7
19
TOPGOLF USA GOLF ENTERTAINMENT FACILITY
3 STORIES ?65,000 SF
REFER TO ARCH PLANS FOR ENTRY AREA
18 7
16 14
15
16 18
18
18 23
16
6
MATCHLINE -3 SHEET C-7.1
13
7
17 25
2
PROPRPO.POSSEDDA80'RVICDVOOTEYR/WCORPORATE
MATCHLINE - SHEET C-6 MATCHLINE - SHEET C-8
ASPHA1L0TV0PP'AMDPVB1EU.5D31B10P,L0UPIWBGCLE.I4SCR0TIR3BG,OO4HAU0D5NT,WD&-AO4Y0F7(4-W5 MAPYH)
LAND USE AND ZONING INFORMATION AND NOTES:
1. DEVELOPER: ARCO/MURRAY NATIONAL CONSTRUCTION COMPANY, INC.
2
3110 WOODCREEK DRIVE
DOWNERS GROVE, IL 60515
CONTACT: BILL KROL
(331) 251-2726
2. OWNER: MOODY LAKE OFFICE PARK DEVELOPMENT LIMITED PARTNERSHIP 5950 FAIRVIEW ROAD, SUITE 200 CHARLOTTE, NC 28210
3. PARCEL: PID: 20145105 MOODY LAKE OFFICE PARK WEST ARROWOOD ROAD CITY OF CHARLOTTE MECKLENBURG COUNTY, NORTH CAROLINA
ZONED: USE:
MUDD-O (REZONING DATE: 10/19/15, 2015-066) EATING, DRINKING, AND ENTERTAINMENT ESTABLISHMENT WITH OUTDOOR ENTERTAINMENT (PERMITTED BY 2015-066 REZONING)
4. BULK REQUIREMENTS:
BULK REQUIREMENTS:
MIN. LOT AREA MIN. BUILDING SETBACK
SETBACK (NORTH)
SETBACK (WEST)
SETBACK (EAST) MIN. PARKING SETBACK
SETBACK (NORTH)
SETBACK (WEST)
SETBACK (EAST) D. PARKING REQUIREMENTS
DRIVING RANGE (1.2 SPACES PER TEE) ACCESSIBLE PARKING SPACES LONG-TERM BICYCLE PARKING
SHORT-TERM BICYCLE PARKING (5%) ON STREET PARKING
REQUIRED
N/A
SEE REZONING PLAN
SEE REZONING PLAN
SEE REZONING PLAN
SEE REZONING PLAN
SEE REZONING PLAN
SEE REZONING PLAN
61 3 (1 VAN)
2 3
N/A
EXISTING ?67 AC
N/A N/A N/A
N/A N/A N/A
0 0 0 0 0
MAX. GROSS FLOOR AREA
75,000 SF
0
MAX. BUILDING HEIGHT
80'
N/A
N/A - NOT APPLICABLE N/S= NOT SPECIFIED (V) = VARIANCE (W) = WAIVER (E) =
EXISTING NON-CONFORMANCE (*) = XXX
PROPOSED 13.94 AC
264' 138' 51.5'
20' 20' 10'
500 9 (2 VAN)
2 21 44 (42 STD.,2 ADA) ?65,000 SF ?55'
5. SITE NOT LOCATED IN WATERSHED OVERLAY DISTRICT. 6. SITE LOCATED WITHIN AIRPORT NOISE OVERLAY DISTRICT. 7. ADJACENT MOODY LAKE IS AN EXISTING REGIONAL STORMWATER MANAGEMENT FACILITY AND IS NOT
SUBJECT TO SWIM BUFFER REQUIREMENTS. 8. NEW IMPERVIOUS AREA: ?12.57 AC 9. STREET PARKING IS TO BE CONSIDERED PUBLIC PARKING, AND NOT PART OF TOPGOLF'S PARKING TOTAL.
CONCRETE CURB & GUTTER
CURB AND GUTTER SPILL CURB TRANSITION CURB DEPRESSED CURB AND GUTTER
HATCH LEGEND
CONCRETE SIDEWALK
OUTFIELD TURF (6" BASE, 2" FINES, 0.5" TURF)
TM
SITE CIVIL AND CONSULTING ENGINEERING
LAND SURVEYING
PROGRAM MANAGEMENT LANDSCAPE ARCHITECTURE
REVISIONS
REV DATE
COMMENT
BY
10 07/20/16 NCDOT RESUBMISSION
BAB
11 08/15/16 PER ARCHITECT REVISIONS
MAR
12 09/06/16 PCCO REVISIONS
BAB
13 09/07/16 ADDITIONAL PARKING LOT
BAB
14 01/10/17 PER CITY OF CHARLOTTE
BAB
15 01/26/17 PCCO REVISIONS
BAB
16 02/01/17 PCCO/BRIDGE/ LANDSCAPE REVISIONS BAB
WITH C.A
DI G
DIG
.R.E.
CA
LL BEFORE YOU
CALL BEFORE YOU DIG 1-800-632-4949
NORTH CAROLINA
ITS THE LAW
APPROVED FOR CONSTRUCTION
PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.:
NCC152080 KEL MAT
12/04/15 1" = 60' SS0
PROJECT:
SITE PLAN DOCUMENTS
FOR
SUSTAINABLE DESIGN PERMITTING SERVICES TRANSPORTATION SERVICES
WARREN, NJ UPSTATE NEW YORK BOSTON, MA NEW YORK METRO PHILADELPHIA/SOUTHERN NJ LEHIGH VALLEY, PA SOUTHEASTERN, PA
BALTIMORE, MD SOUTHERN MARYLAND NORTHERN VIRGINIA CENTRAL VIRGINIA CHARLOTTE, NC RALEIGH, NC WASHINGTON, DC
13
MATCHLINE - SHEET C-7
3
MATCHLINE - SHEET C-7.1
7 31
16 12
16 9
60
30 15 0
60
1"= 60'
LOCATION OF SITE
MOODY LAKE OFFICE PARK WEST ARROWOOD ROAD CITY OF CHARLOTTE, NC MECKLENBURG COUNTY
NC, PLLC NCBELS P-1132
1927 SOUTH TRYON STREET, SUITE 310
CHARLOTTE, NC 28203
Phone: (980) 272-3400
Fax:
(980) 272-3401
NC@
N
I STERED P
BERGE
ANAL ENG I N M I CHA
ORTRHO FCEAS RS OI OLIN
SEAL
020/4306110/17
EER
REG
EL A.
THE
SHEET TITLE:
OVERALL SITE PLAN
SHEET NUMBER:
C-5
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related searches
- on lot financing near me
- used car lot finance companies
- radicais gregos e latinos e seus sentidos
- free used car lot software
- on lot financing fayetteville nc
- losartan recall 2019 lot numbers
- on lot financing car lots
- parking lot management software
- asphalt parking lot pavement design
- beaufort sc obituaries south carolina
- sc map south carolina
- asphalt parking lot contractors