HYDROLOGY & HYDRAULICS REPORT …

HYDROLOGY & HYDRAULICS REPORT (PRELIMINARY)

TOPGOLF ONTARIO

N. Archibald Ave. and Fourth Street

Ontario, California APN 0210-181-45, 0210-181-34

Prepared For Topgolf 8750 N. Central Expressway, Suite 1200 DALLAS, TEXAS 75231

Prepared By

Moyenuddin Sirajee, PE Fuscoe Engineering, Inc. 2850 Inland Empire Blvd. Building B Ontario, California, 91764 909.581.0676

Project Manager: Steven L. Ellis

Date Prepared: October 2018 Date Revised: February 2019

Job Number: 1774.001.02

HYDROLOGY REPORT (PRELIMINARY)

TOP GOLF, ONTARIO

Located at the southeast corner of N. Archibald Avenue and 4th Street in the City of Ontario County of San Bernardino, California APN 0210-181-45, 0210-181-34

Prepared for:

TOPGOLF 8750 N. CENTRAL EXPRESSWAY, SUITE 1200 DALLAS, TEXAS 75231 832.515.0150

By Osvaldo Roque at 11:13 am, Mar 15, 2019

Prepared by: Moyenuddin Sirajee, PE, Senior Engineer FUSCOE ENGINEERING, INC. 2850 Inland Empire Blvd. Building B Ontario, CA 91764 909.581.0676

Date Prepared: October 2018 Revision Date: February 2019

APN: 210-181-45, 210-181-34

1

TOP GOLF, ONTARIO

Table of Contents

1.0 INTRODUCTION .............................................................................................................3 1.1 GEOGRAPHIC SETTING .................................................................................................3 1.2 PURPOSE OF THIS REPORT ............................................................................................3 1.3 REFERENCES..................................................................................................................3 1.3 PROJECT SITE LOCATION MAP ......................................................................................4 1.5 NRCS SOIL MAP & NOAA PRECIPITATION DATA .............................................................5

2.0 PRE-DEVELOPMENT TOPOGRAPHIC & HYDROLOGIC CONDITIONS................................6 2.1 PRE-DEVELOPMENT TOPOGRAPHY ................................................................................6 2.2 PRE-DEVELOPMENT DRAINAGE SYSTEM ........................................................................6

3.0 PROPOSED DEVELOPMENT AND DRAINAGE FACILITIES ...................................................6 3.1 PROPOSED DEVELOPMENT............................................................................................6 3.2 POST-DEVELOPMENT DRAINAGE FACILITY .....................................................................7

4.0 HYDROLOGY AND HYDRAULIC STUDY ............................................................................7 4.1 METHODOLOGY ..........................................................................................................7

5.0 RESULTS AND CONCLUSIONS.........................................................................................8 5.1 PRE-DEVELOPED CONDITIONS 100 YEAR STORM EVENT ...............................................8 5.2 POST-DEVELOPMENT CONDITIONS 100 YEAR STORM EVENT........................................9 5.3 POST-DEVELOPMENT WQMP, MITIGATION AND FLOW RATE ......................................10

6.0 APPENDICES ........................................................................................................................12

APN: 210-181-45, 210-181-34

2

TOP GOLF, ONTARIO

1.0 INTRODUCTION

1.1 GEOGRAPHIC SETTING

The proposed Top Golf project will be developed on land consisting of two vacant parcels totaling approximately 15.8-acres in the City of Ontario. The project is located on the southeast corner of N. Archibald Avenue and 4th Street and north of Deer Creek Channel. The Dear Creek Channel is flowing along the south boundary of the project.

1.2 PURPOSE OF THIS REPORT

The purpose of this report is to determine the storm water runoff generated from a 100-year storm event due to the proposed development and to determine if there is any significant impact on existing storm drain system that received the runoff from the development. The 100year storm runoff will also be used to size all the proposed on-site drainage pipes and structures.

1.3 REFERENCES

? San Bernardino County Hydrology Manual 1986 ? The Urban Drainage Design Manual (Federal Highway Administration)

APN: 210-181-45, 210-181-34

3

TOP GOLF, ONTARIO

1.3 PROJECT SITE LOCATION MAP

APN: 210-181-45, 210-181-34

4

TOP GOLF, ONTARIO

................
................

In order to avoid copyright disputes, this page is only a partial summary.