Alaska DOT&PF

(2) Clean off loose mix from gates, chains, and tires that might fall on the pavement of the haul route. (3) Contain, collect and disposal of (1) and (2). The Contractor is responsible for the inspection plan, the means, and methods used for removal/cleaning and disposal of fugitive materials/debris. ................
................