PREMIER POOLS CONSTRUCTION



PREMIER POOLS CONSTRUCTIONEXCAVATION 2/1/11Base Dig for Rancho Cordova Office$XXXX per day + $X per sq. ft. past 400Base Dig for Satellite Office$XXXX per day + $X per sq. ft. past 400Attached Spa or grotto$XXXDetached Spa$XXX Spa Only$XXXX Extra Grading or Layout after form/pre-site$XXX per hrRock/Hard Soil Charge$XXXX per dayWalk out over 100’$X per foot Clean drive way or access over 20’ $XXX per hour Stand By Charge$XXX per hourDirt on Site Credit ($XXX) Deep end ramp$XXXVanishing Edge$XXXPool Cover Box$XXXExtra Skimmer or Leaf Cannister$XX eachExtra Fence Removal(after 1 sections)$XX eachPool Depth $XX per 6” past 6’All Raised Bond Beam $X per Ln. ft. Wing Walls with footings $X per Ln. ft.Waterline Notched Beam (12” to 18”)$X per Ln. ft.Concrete Removal$X per ft.Concrete Removal w/ Steel$X per ft.Trash Haul Each Load$XXXTree/Stump Removal = Grading Time + Trash HaulGravel Pack + Labor$XXXGravel $XX per yardPREMIER POOLS CONSTRUCTIONSTEEL 2/1/11Swimming Pool Steel$XX.XX per perimeter ft.6” Fountain wall (up to 8’)$XXX.XX6” Fountain wall (after 8’) $XX per ft.12” Spa Wall (up to 8’)$XXX12” Spa Wall (after 8’)$XX per ft.Total Bench footage after 8’ $X.XX per ft.Ledge$XXX + $X per sq.ft. after 50Beach$XXX Raised Bond Beam or Wing Walls (per ln. ft.) 6” to 12”$X per ft.18” to 24”$X per ft.30” to 36”$X per ft.(Add $1.00 per foot if notched for flagstone)Footings for Block/Gunite Wall Outside of Pool$X.XX per ft. Depth charge after 6’ 6” $XX per additional ft.Under 12” Notched Beam $X per ft.12 to 18” Waterline Notched Beam$X per ft.Vanish Edge Dam Wall w/ keyway$XX per ft.Pool Cover Box $XX per ft.Extra Skimmer $XX ea.Barstool $XXX ea. (must have In-Floor)Raised Columns $XXX ea.Waterfall Pad $XXCustom water fall pads $XX per ft.Deep Ramp $XXXFree Standing Wall Schedule (Single Curtain) $X per ft.Free Standing Wall Schedule (Double Curtain)$XX per ft.Steel for Deck Steps$X per mercial Recessed Steps $XX per setSteel for Deck 12” on Center $X.XX per sq ft.Gunite Slides Off Contract/Bid OnlyAdditional Labor (Engineering, Keyways, Etc. $XX per hourPREMIER POOLS CONSTRUCTIONROUGH PLUMBING 2/1/11Base Pool Plumbing$XXXX(Includes 300’ total pipe, 1 main drain, 1 skimmer, 1 pump, 1 filter)Base Pool-Spa Combo Plumbing$XXXX(Includes 400’ total pipe, 4 jets, 2 main drains, air loop)Base Spa Only Plumbing$XXXX(Includes 100’ total pipe, 4 jets, 2 main drains, air loop)Floor Cleaning SystemSet Water Valve (labor only)$XXXSet Leaf Canister$XXParamount Equipment(See Equip.)Additional Plumbing Footage$X.XX per ft.Copper Line (Serrano)$X per ftSolar Conduit Run$X.XX per ftAdditional Jandy valves not included in base $XXP.V.B. or R.P.P. valve (Davis/Roseville/Lincoln)$XXXCheck valves/Non Jandy Valves$XXGas Line 1st 30’$XXXAdditional Gas Line-up to 2”$X.XX per ft.Additional Gas Line- 3/4”$X.XX per ft.Attic/under house gas run (Additional) $XX.XX per ft.Additional Gas Riser $XXX eachExtra Jets after 4 (standard)$XXUpgrade to Waterway Jets (first 4)$XXXAdditional Waterway spa jets (after 4)$XXAuto Fill$XXXExtra Skimmer$XXXHook up Sheer Descent$XX eachDeck Jets$XXX ea.Laminars $XX ea.Tunneling under concrete up to 3’$XXSaw Cut (Does not include removal)$XX min. ($X per ft.>40’) Relocate Eq. pad in yard (Add per ft. price after 10’)$XXX Relocate Gas Line (Add per ft. price after 10’) $XXXPREMIER POOLS CONSTRUCTIONELECTRIC 2/1/11BASE POOL ELECTRIC$XXXX(Includes 125’ total, GFI at pad, pool light switch, one pool light niche and j-box, bonding, sub-panel, timer box, ?” main conduit and #8 wire)BASE POOL/SPA ELECTRIC$XXXX(Includes 200’ total, spa light)PDA Credit($XXX)Additional Footage$X.XX per ft.Additional Footage ?” to ?” conduit only $X.XX per ft.Extra Light$XXXExtra Time Clock$XXXExtra 110 Outlets$XXInstall 220 Switch$XXFreeze control (No PDA)$XXXInstall Sub-Panel (No available Breakers at Main)$XXXFIBER OPTICSQuote Only from Electrical Dept.PORTABLE SPAS/SUB-PANELSSpa Disconnect/50 amp G.F.I.$XXXFootage from house panel to spa disconnect$X.XX per footHook-up Portable Spa from Disconnect To Spa$X.XX per footMISCELLANEOUS CHARGESMove Equipment Pad$XXX up to 10’( per ft. after 10’)Trip Charge (misc. Elec.) $XXXPREMIER POOLS PRICINGSacramento/Vacaville/StocktonPerimeter Pricing79 perimeter feet and under$XX.XX80 Perimeter Feet to 90 Perimeter Feet$XX.XX91 Perimeter Feet to 106 Perimeter Feet$XX.XX107 Perimeter Feet to 118 Perimeter Feet$XX.XX119 Perimeter Feet to 129 Perimeter Feet$XX.XX130 Perimeter Feet to 139 Perimeter Feet$XX.XX140 Perimeter Feet to 149 Perimeter Feet$XX.XX150 Perimeter Feet or Larger$XXX.XX7 ft Deep Pools – 600sq ft and Under$XXX.XX7 ft Deep Pools – 600sq ft and Over$XXX.XX8ft – 9ft Deep Pools – 600sq ft and under$XXX.XX8ft – 9ft Deep Pools – 600sq ft and over$XXX.XXSpa Perimeter PricingSpa Perimeter$47.50 LFTItemized Extras For Perimeter PricingSpa Only$X,XXX.XXSeparate Spa with Pool $XXX.XXDeep End Loveseat & Bench w/dirt$XX.XX/LFTDeep End Loveseat & Bench no dirt (1yd/4lf)$XX.XX/LFTShallow End Loveseat & Bench no dirt (1yd/8lf)$XX.XX/LFTRaised Bond Beam$X.XXSqFtBaja Ledge no dirt (2 ? - 3 yd avg)$XXX.XXBaja Ledge ? dirt$XXX.XXBaja Ledge w/dirt$XX.XXAutomatic Cover Box up to 15 ft$XXX.XXAutomatic Cover Box 16 ft to 20 ft$XXX.XXExtra Steps over 30 lineal ft$XX.XX/LFTDeep End Ramp 7 ft and Over$XXX.XXButton Board$XX.XX(Page 2 of 4)Itemized Extras For Perimeter Pricing ContinuedOver break after 3 yards$XXX.XXGunite for Slides and Rock$XXX.XX per ydFlash$XXX.XX (3 yd Min)Set-up Fee for Chargeable Returns$XXX.XXStrip and Finish$X.XX LFTColumns$XX.XXCFTNotch Beam$X.XX LFTGrotto$XXX.XXFuel SurchargeSee sliding scaleYardage Pricing*Rockwork, Waterfalls above pool elevation, and remodels over minimum charges will be billed by yard.$XXX.XX/Yd*Minimum Charge$X,XXX.XX*Pools over 150 Perimeter Ft, over 9ft in depth, out of ground, pools with caves, commercial, & vanishing edges will be billed by the yard$XXX.XX/Yd*Labor (muck out, set frames, tie steel, stand by)$XXX.XX/Hr*Perimeter price per foot includes: steps up to 30 lineal feet and waterfall pads.Itemized Extras for Yardage PricingWing Walls$X.XX/ Sq FtRaised Bond Beam per 6inch raise in elevation$XX.XXSpa and Grotto Labor$XXX.XXVanishing Edge$XX.XX/LFTButton Board$XX.XXStrip Forms$X.XX/LFTNotched Bond Beam$X.XX/LFTWalls Outside of pool$X.XX/Sq Ft(Page 3 of 4)Travel SurchargesTravel – 40 Mile Radius$XXX.XXTravel – 60 Mile Radius$XXX.XXTravel – 80 Mile Radius$XXX.XXFrom Vacaville across Scales (Cordelia)$XXX.XXTo Vacaville$X.XX PFTRemodels, flashes and repairs will be $XXX.XX per yd. With no additional discountsDividing Factor for Gunite is 33 3 yds over break allowed per poolExhibit B(Page 4 of 4)SLIDING SCALEFUEL SURCHARGE CHARTFuel percentage is adjusted the 1st day of each month; based on what the U.S. average price is for DIESEL FUEL at the pump.SOURCE: tonto.eia. then click onto Weekly Retail on Highway Diesel Prices and then click onto Average All Types.Fuel surcharge is based on total invoice amount.$X.XX per gallon = 0%$X.XX per gallon = 1.0%$X.XX per gallon = 1.5%$X.XX per gallon = 2.0%$X.XX per gallon = 2.5%$X.XX per gallon = 3.0%$X.XX per gallon = 3.5%$X.XX per gallon = 4.0%$X.XX per gallon = 4.5%$X.XX per gallon = 5.0%$X.XX per gallon = 5.5%$X.XX per gallon = 6.0%$X.XX per gallon = 6.5%$X.XX per gallon = 7.0%For every .XX cents increase per gallon the surcharge goes up by ? %.PREMIER POOLS CONSTRUCTIONTILE 2/1/11Standard Pool Tile$XX per ln. ft.Glass Pool Tile (Jewels)$XX.XX per ln. ft.Glass Pool Tile (Oceanscapes)$XX.XX per ln. ft.Tile Upgrade #1addtl $X.XX per ft Tile Upgrade #2addtl $X.XX per ft Trim Tile$X.XX per ln. ft.Glass Trim Tile$XX per ln. ft.PebbleTec Spotters (Fire Opals, etc.)$XX ea.Tile Faced Raises$XX per sq. ft.Tile Upgrade #1addtl $X.XX per sq. ft Tile Upgrade #2addtl $X.XX per sq. ft 12” Tile Dam Wall$XXX (up to 10 ft.)Dam Wall Past 10’$XX per ft.12” Tile Dam Wall (Glass-Jewels)$XXX (up to 10 ft.)Dam Wall Past 10’$XX12” Tile Dam Wall (Glass- Oceanscapes)$XXX (up to 10 ft.)Dam Wall Past 10’$XXSpillways$XXX each up to 2’ wideInstall Sheer Descents$XX ea.Wok Pots (Pre Drilled Only)$XXX ea.Extra Skimmer$XX ea.Diamond Inserts$XX ea.Depth Markers$XX ea.Targets$XX ea.Install Sconce$XX eachMosaics (12-18”) $XXX minimum ($XX each after 3)Bar Stools (Must Have In Floor System)$xxx (Top & 6” along sides-penny tile only) $XXX (Entire Stool)3” Handhold$XX per ln. ft. Racing Lanes (6” wide)$XX per ln. ft.Pool Cover Weir$XX per sq. ft.Negative Edge Weir$XX per sq. ft. ($XXon radius)Prep Wall for Double Cantilever$X.XX per ln. ft. (Raised Spas, Pool and Walls)PREMIER POOLS CONSTRUCTIONROCK 2/1/11Moss/ El Do Blue Granite Sierra BoulderBond Beam Rock $XX $XX $XXNotched Bond Beam Rock w/sealing $XX $XX $XXSet Rock Beyond Bond Beam $XX $XX $XX“A” Waterfall (beam bubbler) $XXX $XXX Not Available“B” Waterfall 3’ tall 4’ wide $XXXX $XXXX $XXXX“C” Waterfall 4’ tall 5’ wide $XXXX $XXXX $XXXX“D” Waterfall 5’ tall 6’ to 7’ wide $XXXX $XXXX $XXXXOther Specialty Rock is now Per BidLARGER FALLS BID ONLY(Note: Waterfalls with notched beam rock: Do not subtract width of waterfall from footage of beam covered by rock)Deep end rock cluster $XXX (Must meet diving standards)Cantilevered Grotto Rock$XXXStandard Flagstone: (Three Rivers, Boquet Canyon, Cold Water Canyon, Silver/Gold Quartzite, Blonde Rainbow, High Desert, Mexican Multi) Flagstone Coping$XX per sq. ft.Flagstone Facing (includes sealing)$XX per sq. ft.Tumbled Flagstone$XX per sq. ft.Flagstone Grinding for Pool Edge $X per ln. ft.Flagstone Hand Holds $XX per ln. ft.Upgrade Coping/Facing (All other choices)$XX per sq. ft.Ledge Stone$XX per sq. ft.Fire pits 3’ diameter (10-12” high)$XXXXAdditional Size for Fire Pit$XXX per ft.Access charge: Hand haul rock for difficult access $XX per ln. ft. beam rock $XXX per waterfallExtra rock left on site$XXX per ton (Moss & El Do Blue)$xxx per ton (Sierra Boulder/ Other Specialty Rock)Labor Rate$XX per hourPREMER POOLS CONSTRUCTIONBRICK, BLOCK, STUCCO 2/1/11BrickBullnose Brick Coping 12”15 per ft.Mitered Corner (Doesn’t include l.f.)$XX eachBrick Facing (sealing included)$XX per sq. ft.Brick Paving (base not included)$XX per sq. ft.Brick Expansion Joints $XX per ln. ft. (forming not included) Mastic$ X per ln. ft.Block Retaining WallsBlock Retaining Wall w/steel and concrete$XX.XX per sq. ft.Footing for block wall with steel$XX per ln. ft.Block Wall no steel/concretew/ existing footing$XX per ft. StuccoStucco Face$ X per sq. ft.Wall Prep when required$ X per sq. ft.Seal Wall Only$ X per sq. ft.Drainage Must Be Installed. Not Responsible for Water Damaged Stucco.CopingTravertine or PreCast$XX per sq. ft.Mitered Corner for all coping stones$XX ea.Cuts – Brick Mitered Corner$XX ea.EARTHSCAPES CUSTOM CONCRETE1. 400 SQ. FT. includes 80’ LN Cantilever$X,XXX2. 1 Color Stamp$X.XX per sq.3. 2 Color Stamp$X.XX per sq.4. Grey Broom$X.XX per sq.5. Thickened Edge (1st 12”)$X.XX per sq.6. Cantilever Edge$X.XX per sq.7. Cantilever Edge w/ Extension$XX per ln.8. Footings$XX per ln.9. Step Face$XX per ln.10. Bullnose Step Face$XX per ln.11. Deck-O-Drain$XX per ln.12. Steel$XX per sq.PREMIER POOLS CONSTRUCTIONEQUIPMENT SETS 2/1/11Pool Only$XXX (Includes 1 Jandy Valve)Pool/Spa$XXX (Includes 3 Jandy Valves)Set Extra Pump$ XX (includes electric at pad)Extra Jandy Valve$ XXAll Other Valves$ XXSheer Descent Install$ XXBubbler Install$ XXInstall Waterways Jets$ XX each.Fusion Salt w/ PDA$ XXFusion Salt w/o PDA$XXXFusion Tab Feeder$ XXHeater Install Pool Only$XXXManifold Change$ XXSolar Ready Plumbing Only$XXXVanishing Edge Water Leveler $XXXSet Extra Filter – Vanishing Edge$ XXBW Valve and Sep Tank$ XXFire Pit/BBQ Hookup $XXXInstall MDX Drain$XXSet In-Floor Heads $XX per headJandy RS install $XXXPDA Pool Only $XXPDA Pool and Spa $XXXTrip Charge to install items not on equipment order $XXPREMIER POOLS CONSTRUCTIONCLEAN-UP 2/1/11Pool Clean-upPool/Spa Clean-up$XXX up to 400 sq. ft.$XXX up to 400 sq. ft.$X.XX per sq. ft. after 400 sq. ft.$X.XX per sq. ft. after 400 sq. ft. *Clean Up Includes 1 section of fence, no post Spa Only Prep$XXXInstall/Reverse Gate$XXXSection of Fence (w/ New Post)$ XXRebuild Fence$ XX per ft.Misc. Extra Labor per Crew$ XX per hr.Grading w/ Small Tractor$ XX per hr.5 Yard Trash Haul$XXXSand Trenches – Pool$XXXSand Trenches – Pool/Spa$XXXMastic$ X per ln. ft.Acid Wash Decking$ .XX per sq. ft.Concrete Removal$ X per sq. ft.STANDARD PLASTER (WHITE) - "11"201-800$X,XXX add $X.XX sq.ft. after 400OVER 800BID ONLY(up to 35' of steps, two anti vortex drains, four eyeball fittings, up to 6' deep. $XX for each additional 6" over 6 feetSPAS,GROTTOS,FOUNTAINS,NEGATIVE EDGE POOLS(WITH POOLS)$XX.XX per sq.ft.Includes 2 anti vortex drains, 4 eyeball fittingsSPA, FOUNTAINS, PONDS(WITHOUT POOLS)0-200$X,XXX.XX (Includes 2 anti vortex drains, 4 fittings)TAHOE BLUE / SILICONE SHIELDTahoe Blue$XXX.XX Silicone Shield$X.XX sq.ft.EXTRASSet mosaics at plaster - up to 3$XXX.XX Plaster around mosaics - up to 6$XXX.XX Main drains over 2$XX.XX / ea.Umbrella Sleeves$XX.XX / ea.Total steps over 35'$XX.XX per ft.Bar Stools$XXX.XX eachCabo ledge$XXX.XX eachFinish to Floor Cleaning System$XXX.XX Pebbled beach entry$X,XXX.XX / standard color only(see pebble list for upgrade cost)MISCELLANEOUSTaping of colored grout or rock$XXX.XX Install recessed steps$XX / setPEBBLE FINA PRICES AND UPGRADES - "11"STANDARD COLORS:$X,XXX.XX (Add an additional $4.00 sq.ft. over 400)ClassicoGrigioBella BlueCielo BlueAcquos#1 UPGRADE COLORS:$X,XXX.XX (Add an additional $4.75 sq.ft.over 400)Black GalaxySapphire GalaxyEmerald GalaxyBermuda ShoresSPAS, GROTTOS, NEG. EDGE & FOUNTAINS$XX.XX SQ.FT.Premium colors, add the additional $ sq.ft. noted above.SPAS, PONDS, FOUNTAINS W/O POOLup to 50 sq.ft.$X,XXX.XX (Stand. colors only - add the above $ for upgrades)over 50 sq.ft.Bid OnlyEXTRASSame as Plaster except:Pebble Main Drains$XX ea.Abalone Shells$0.XX per sq. ft.(2 separate trips are needed for this)Included in Base PriceMain drain grate (2 for pool - 2 for spa) & 4 return fittings for pool and for spaRemoval of slurry boxPEBBLE TEC PRICES AND UPGRADES - "11"STANDARD COLORS:$X,XXX.XX+(An addtional $4.00 sq.ft. over 400)Black PearlMajestic PlumWhite PearlSandy BeachTahoe BlueBlack MarbleCaribbean Blue#1 UPGRADE COLORS:$X,XXX.XX+(An additional $4.50 sq.ft. over 400)JadeSoft WhiteMoonlight GreyCrème de MentheBlue LagoonJet BlackSedona Red#2 UPGRADE COLORS:$X,XXX.XX +(An additional $5.00 sq.ft. over 400)Emerald BayMidnight BlueSky BlueTropical BreezeSPAS, GROTTOS, NEG. EDGE, & FOUNTAINS W/ POOL$15.00 SQ.FT.Premium colors add the additional $ sq.ft. noted aboveSPAS, PONDS, FOUNTAINS W/O POOLup to 50 sq.ft.$X,XXX.XX (Stand. colors only - add the above $ for upgrades)over 50 sq.ft.Bid OnlyEXTRASSame as Plaster except:Pebble Main Drains$XX ea.Abalone Shells$0.XX per sq. ft.Beach Entry$XXX.XX / ea.Beach entry / spa not same color as pool$X,XXX.XX (2 separate trips are needed for this)Included in Base PriceMain drain grate (2 for pool - 2 for spa) & 4 return fittings for pool and for spaRemoval of slurry boxPEBBLE SHEEN PRICES AND UPGRADES - "11"STANDARD COLORS:$X,XXX.XX (Add an additional $4.50 sq.ft. over 400)Blue GraniteBlack OnyxWhite DiamondsAqua BlueFrench GreyBordeauxDesert GoldIrish Mist#1 UPGRADE COLORS:$X,XXX.XX (Add an additional $5.00 sq.ft.over 400)Arctic WhiteBlack SatinSeafoam GreenCool Blue#2 UPGRADE COLORS:$X,XXX.XX(Add an additional $5.50 sq.ft. over 400)Ocean BlueSlate BlueSky BluePrism BlueTurtle BaySPAS, GROTTOS, NEG. EDGE & FOUNTAINS$XX.XX SQ.FT.Premium colors, add the additional $ sq.ft. noted above.SPAS, PONDS, FOUNTAINS W/O POOLup to 50 sq.ft.$X,XXX.XX (Stand. colors only - add the above $ for upgrades)over 50 sq.ft.Bid OnlyEXTRASSame as Plaster except:Pebble Main Drains$XX ea.Abalone Shells$0.XX per sq. ft.Beach Entry$XXX.XX / ea.Beach entry / spa not same color as pool$X,XXX.XX (2 separate trips are needed for this)Included in Base PriceMain drain grate (2 for pool - 2 for spa) & 4 return fittings for pool and for spaRemoval of slurry boxPREMIER POOLS CONSTRUCTIONSTART UP & SERVICE 2/1/11START UPPool $XXXPool/Spa $XXXWaterway Jets (includes 6)$XXXWaterway Jets (after 6)$XX ea.Paramount In-Floor Setup$XXXNegative Edge Setup$XXXSERVICEMonthly Pool Service(see retail sheet)50 lb. Bag of salt$XX ea.40 lb. Bag of salt$XX ea.Door Alarm$XXFire Ring (Includes 5 bags of rock)$XXXExtra Lava Rock$ X per bagHook Up Slide $XXInstall Diving Board$XXDeck Jets (up to 4)$XXMastic$ X per ln. ft.Handrail Install $XXAutofill$XXAutofill Extender$XXHose Bib Backflow and Preventer Extras$XXTan/Grey Skimmer Lids$XXTan/Grey Letro Lids$XXSkimmer Baskets$XXSkimmer Basket Handles$X.XXSkimmer Weir$XXFloat Valve Assembly$XXLeaf Master Bag/Leaf Master Lid$XXRoman Fountain $XX ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download