Department of Environment and Natural Resources



|Requirements for New Application (Gasoline Station) |

|Letter request address to EMB Regional Director (ENGR. MARIA DORICA NAZ-HIPE) |

|Duly accomplished application form |

|Engineering Report prepared, signed and sealed by a Mechanical Engineer with Photocopy of PRC ID and Managing Head/ Owner and duly |

|notarized.(w/initials every pages of report) |

|Description of processes including the amount of raw materials and finished products, all emissions into the atmosphere and/or material |

|balance. |

|Process Flow Diagram indicating all possible sources of air emission. |

|List of Air Pollution Sources Installations (APSI) and its corresponding Air Pollution Control Facilities (APCF) with complete specifications.|

|Discussion of each APSI showing the process/mode of operations, design criteria and efficiencies of the APCF including the types and |

|quantities of pollutants emitted. |

|Plant Layout and specifications duly signed and sealed by PME |

|Plans and Specifications of the proposed Air Pollution Source and Control Installations (APSCI) |

|Plant and Machinery layout showing the connection of the APSI to the APCF. |

| |

|Note: For stand-by Generator Sets with less than 300 kW / capacity submit copy of manual/picture of the name plate of engine and alternator |

|(specifically nameplate of engine and alternator) |

|Copy of DTI Certificate/ SEC Certificate |

|Vicinity map identifying the address, location of the plant premises |

|Geo-Tagged Pictures of the Site and Equipment |

|Site Development Plan |

|PCO designation signed by the Managing Head/ Copy of Certificate of PCO Accreditation |

|Copy of ECC/CNC |

|Filing Fee : P640.00 |

|Requirements for Amendment (Gasoline Station) |

|Letter request address to EMB Regional Director (ENGR. MARIA DORICA NAZ-HIPE) |

|Duly accomplished application form |

|Engineering Report prepared, signed and sealed by a Mechanical Engineer with Photocopy of PRC ID and Managing Head/ Owner and duly |

|notarized.(w/initials every pages of report) |

|Description of processes including the amount of raw materials and finished products, all emissions into the atmosphere and/or material |

|balance. |

|Process Flow Diagram indicating all possible sources of air emission. |

|List of Air Pollution Sources Installations (APSI) and its corresponding Air Pollution Control Facilities (APCF) with complete specifications.|

|Discussion of each APSI showing the process/mode of operations, design criteria and efficiencies of the APCF including the types and |

|quantities of pollutants emitted. |

|Vicinity map identifying the address, location of the plant premises |

|Geo-Tagged Pictures of the Site and Equipment |

|Site Development Plan |

|PCO designation signed by the Managing Head/ Copy of Certificate of PCO Accreditation |

|Copy of ECC/CNC |

|Filing Fee : P640.00 |

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download