SF330 (1/2004)
|E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT |
|(Complete one Section E for each key person.) |
|12. NAME |13. ROLE IN THIS CONTRACT |14. YEARS EXPERIENCE |
|Marcus H. Bole & Associates |Environmental Consulting | |
| | |a. TOTAL |b. WITH CURRENT FIRM |
| | |30 years |13 years |
|15. FIRM NAME AND LOCATION (City and State) |
|Marcus H. Bole & Associates, Wheatland |
|16. EDUCATION (DEGREE AND SPECIALIZATION) |17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) |
|Masters of Science in Education, NDSU,US Army Corps of Engineers |CAL/EPA Registered Environmental Assessor (06228) |
|Wetland Delineator, Certificate program, Site Assessment and | |
|Remediation, UC Davis | |
|18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) |
|CAL/EPA Registered Environmental Assessor 06228) |
|19. RELEVANT PROJECTS |
|a. |(1) TITLE AND LOCATION (City and State) |(2) YEAR COMPLETED |
| |Northern California Veterans Cemetery, Dixon, CA | |
| | |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| | |2006 |n/a |
| |(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (( Check if project performed with current firm |
| |Environmental evaluation of sensitive wildlife, plants and delineation of waters of the United States, agency coordination. $100,000 |
| | |
|b. |(1) TITLE AND LOCATION (City and State) |(2) YEAR COMPLETED |
| |Grant Line Road Widening Project Elk Grove, CA | |
| | |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| | |2007 |n/a |
| |(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( Check if project performed with current firm |
| |Environmental evaluation of sensitive wildlife, plants and delineation of Waters of the United States, agency permitting for City of Elk Grove road |
| |improvements. $18, 600 |
| | |
|c. |(1) TITLE AND LOCATION (City and State) |(2) YEAR COMPLETED |
| |Squaw Valley Ski Corporation, Squaw Valle, CA | |
| | |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| | |On going |n/a |
| |(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( Check if project performed with current firm |
| |Wetland determination, delineation and re-vegetation. Agency negotiations. $100,000 |
| | |
|d. |(1) TITLE AND LOCATION (City and State) |(2) YEAR COMPLETED |
| |Peterson, Ranch, Fairfield, CA | |
| | |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| | |Ongoing |n/a |
| |(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( Check if project performed with current firm |
| |Wetland determination, agency negotiations, re-vegetation monitoring. $25,000 |
| | |
|e. |(1) TITLE AND LOCATION (City and State) |(2) YEAR COMPLETED |
| |Ryland Homes, Sacramento, CA | |
| | |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| | |Ongoing |n/a |
| |(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (( Check if project performed with current firm |
| |Environmental evaluation of sensitive wildlife, plants and delineation of Waters of the United States, agency negotiations and permitting, biological |
| |monitoring, $150,000 |
|E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT |
|(Complete one Section E for each key person.) |
|12. NAME |13. ROLE IN THIS CONTRACT |14. YEARS EXPERIENCE |
|David H. Bole |Wildlife Biologist and Wetland | |
| |Evaluation/Delineation | |
| | |a. TOTAL |b. WITH CURRENT FIRM |
| | |6 years |6 years |
|15. FIRM NAME AND LOCATION (City and State) |
|David Bole, Bioconsulting, Sacramento, CA |
|16. EDUCATION (DEGREE AND SPECIALIZATION) |17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) |
|Bachelors Degree in Biology |CAL/EPA Registered Environmental Assessor 08099 |
|US Army Corps of Engineers wetland delineator, | |
|18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) |
|19. RELEVANT PROJECTS |
|a. |(1) TITLE AND LOCATION (City and State) |(2) YEAR COMPLETED |
| |Northern California Veterans Cemetery, Dixon, CA | |
| | |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| | |2006 |n/a |
| |(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( Check if project performed with current firm |
| |Wildlife survey and report. $15,000 |
| |Environmental evaluation of sensitive wildlife, plants and delineation of waters of the United States, agency coordination. |
|b. |(1) TITLE AND LOCATION (City and State) |(2) YEAR COMPLETED |
| |Bond Road Widening Project Elk Grove, CA | |
| | |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| | |2007 |n/a |
| |(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (Check if project performed with current firm |
| |Biological resources inventory, turbidity monitoring, wildlife monitoring during construction. $10,000 |
|c. |(1) TITLE AND LOCATION (City and State) |(2) YEAR COMPLETED |
| |Squaw Valley Ski Corporation, Squaw Valle, CA | |
| | | |
| | |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| | |Ongoing |n/a |
| |(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( Check if project performed with current firm |
| |Wildlife survey, wetland delineation, re-vegetation monitoring $10,000 |
|d. |(1) TITLE AND LOCATION (City and State) |(2) YEAR COMPLETED |
| |Burrowing owl Survey, City of Dixon, CA | |
| | |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| | |2007 |n/a |
| |(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (Check if project performed with current firm |
| |Survey, monitor and report on the presence of burrowing owls. $2,000 |
|e. |(1) TITLE AND LOCATION (City and State) |(2) YEAR COMPLETED |
| |Western Aggregate, Marysville, CA | |
| | |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| | |2005 | |
| |(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( Check if project performed with current firm |
| |Wetland and Vernal Pool evaluation and monitoring. Wildlife study. $10,000 |
|E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT |
|(Complete one Section E for each key person.) |
|12. NAME |13. ROLE IN THIS CONTRACT |14. YEARS EXPERIENCE |
|Katrina Smolen |Hydrologist | |
| | |a. TOTAL |b. WITH CURRENT FIRM |
| | |6 years |2 years |
|15. FIRM NAME AND LOCATION (City and State) |
|Hydro Restoration, Grass Valley, CA |
|16. EDUCATION (DEGREE AND SPECIALIZATION) |17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) |
|M.S. Hydrology, B.A. Geology |Society of Wetland Scientists |
|18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) |
|Us Army Corps of Engineers Project Manager |
|19. RELEVANT PROJECTS |
|a. |(1) TITLE AND LOCATION (City and State) |(2) YEAR COMPLETED |
| |Squaw Valley Ski Corporation, Squaw Valley, CA | |
| | |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| | |Ongoing |n/a |
| |(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (( Check if project performed with current firm |
| |Hydrological studies, bank stabilization studies and wetland delineation $21,0000 |
|b. |(1) TITLE AND LOCATION (City and State) |(2) YEAR COMPLETED |
| |City of Elk Grove, Elk Grove, CA | |
| | |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| | |2007 |n/a |
| |(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (( Check if project performed with current firm |
| |Delineation of waters of the United States and hydrological studies of Laguna Creek $10,000 |
|c. |(1) TITLE AND LOCATION (City and State) |(2) YEAR COMPLETED |
| |Nevada City Engineering, Grass Valley, CA | |
| | |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| | |2006 |n/a |
| |(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (( Check if project performed with current firm |
| |SWEPP plans, hydrological studies, bank stabilization studies, $5,000 |
|d. |(1) TITLE AND LOCATION (City and State) |(2) YEAR COMPLETED |
| |ryland homes, sacramento, ca | |
| | |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| | |Ongoing |n/a |
| |(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (( Check if project performed with current firm |
| |Hydrological studies, wetland determination and delineation, bank stabilization, SWEPPE plans for road widening. $21,000 |
|e. |(1) TITLE AND LOCATION (City and State) |(2) YEAR COMPLETED |
| |Somerset Schools, auburn, ca | |
| | |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| | |2004 |n/a |
| |(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (( Check if project performed with current firm |
| |Wetland delineation, hydrological studies, pond construction plans, and re-vegetation monitoring. $12,000 |
|E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT |
|(Complete one Section E for each key person.) |
|12. NAME |13. ROLE IN THIS CONTRACT |14. YEARS EXPERIENCE |
|Tina Costella |Botanist, Wetland Delineator | |
| | |a. TOTAL |b. WITH CURRENT FIRM |
| | |7 years |3 |
|15. FIRM NAME AND LOCATION (City and State) |
|Tina Costella, Biologist |
|16. EDUCATION (DEGREE AND SPECIALIZATION) |17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) |
|M.S. Botany | |
|U.S. Corps of Engineers Wetland Delineator | |
|18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) |
|19. RELEVANT PROJECTS |
|a. |(1) TITLE AND LOCATION (City and State) |(2) YEAR COMPLETED |
| |Empire Meadows, Auburn, CA | |
| | |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| | |2006 |n/a |
| |(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm |
| |Vegetation assessment, mammal survey. $2,500 |
|b. |(1) TITLE AND LOCATION (City and State) |(2) YEAR COMPLETED |
| |Ukiah air attack base, ukiah, ca | |
| | |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| | |2005 |n/a |
| |(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ((Check if project performed with current firm |
| |Wetland determination, botanical survey $3,000 |
|c. |(1) TITLE AND LOCATION (City and State) |(2) YEAR COMPLETED |
| |Squaw Valley Ski Corporation, Squaw Valley, CA | |
| | |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| | |Ongoing |n/a |
| |(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm |
| |Field survey, wetland delineation, transect analysis and vegetation mapping, monitoring $6,000 |
|d. |(1) TITLE AND LOCATION (City and State) |(2) YEAR COMPLETED |
| |Northern California Veteran’s Cemetery | |
| | | |
| | |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| | |2006 |n/a |
| |(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ((Check if project performed with current firm |
| |Wetland determination and delineation, botanical survey. $10,000 |
|e. |(1) TITLE AND LOCATION (City and State) |(2) YEAR COMPLETED |
| |Grant Line Road project | |
| | |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| | |2005 |n/a |
| |(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (( Check if project performed with current firm |
| |Botanical field surveys, wetland determination, rare plant identification, $14,000 |
|E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT |
|(Complete one Section E for each key person.) |
|12. NAME |13. ROLE IN THIS CONTRACT |14. YEARS EXPERIENCE |
|[Insert response here] |[Insert response here] | |
| | |a. TOTAL |b. WITH CURRENT FIRM |
| | |[Insert] |[Insert] |
|15. FIRM NAME AND LOCATION (City and State) |
|[Insert response here] |
|16. EDUCATION (DEGREE AND SPECIALIZATION) |17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) |
|[Insert response here] |[Insert response here] |
|18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) |
|[Insert response here] |
|19. RELEVANT PROJECTS |
|a. |(1) TITLE AND LOCATION (City and State) |(2) YEAR COMPLETED |
| |[Insert response here] | |
| | |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| | |[Insert here] |[Insert here] |
| |(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (( Check if project performed with current firm |
| |[Insert response here] |
| | |
|b. |(1) TITLE AND LOCATION (City and State) |(2) YEAR COMPLETED |
| |[Insert response here] | |
| | |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| |(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (( Check if project performed with current firm |
| |[Insert response here] |
| | |
|c. |(1) TITLE AND LOCATION (City and State) |(2) YEAR COMPLETED |
| |[Insert response here] | |
| | |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| |(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (( Check if project performed with current firm |
| |[Insert response here] |
| | |
|d. |(1) TITLE AND LOCATION (City and State) |(2) YEAR COMPLETED |
| |[Insert response here] | |
| | |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| |(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (( Check if project performed with current firm |
| |[Insert response here] |
| | |
|e. |(1) TITLE AND LOCATION (City and State) |(2) YEAR COMPLETED |
| |[Insert response here] | |
| | |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| |(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (( Check if project performed with current firm |
| |[Insert response here] |
| | |
|F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S |20. EXAMPLE PROJECT KEY |
|QUALIFICATIONS FOR THIS CONTRACT |NUMBER |
|(Present as many projects as requested by the agency, or 10 projects, if not specified. | |
|Complete one Section F for each project.) | |
|21. TITLE AND LOCATION (City and State) |22. YEAR COMPLETED |
|Sacramento Area National Cemetery, Dixon, CA | |
| | |
| |PROFESSIONAL SERVICES |CONSTRUCTION (If applicable) |
| |2006 |n/a |
|23. PROJECT OWNER’S INFORMATION |
|a. PROJECT NAME |c. POINT OF CONTACT NAME |c. POINT OF CONTACT TELEPHONE NUMBER |
|Sacramento Area National Cemetery, Project No. |Carter Burgess |916-929-3323 |
|921PC2001 |Attn: William Romzick | |
| | | |
|24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.) |
|Conducted preliminary onsite evaluation of 560 acre Dixon site for development of the Sacramento area National Cemetery for potential impacts to sensitive |
|wildlife, sensitive plant species and to “waters of the United States.” |
| |
| |
| |
| |
|25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT |
|a. |(1) FIRM NAME |(2) FIRM LOCATION (City and State) |(3) ROLE |
| | | | |
| | | | |
|b. |(1) FIRM NAME |(2) FIRM LOCATION (City and State) |(3) ROLE |
| | | | |
| | | | |
|c. |(1) FIRM NAME |(2) FIRM LOCATION (City and State) |(3) ROLE |
| | | | |
| | | | |
|d. |(1) FIRM NAME |(2) FIRM LOCATION (City and State) |(3) ROLE |
| | | | |
| | | | |
|e. |(1) FIRM NAME |(2) FIRM LOCATION (City and State) |(3) ROLE |
| | | | |
| | | | |
|f. |(1) FIRM NAME |(2) FIRM LOCATION (City and State) |(3) ROLE |
| | | | |
| | | | |
|H. ADDITIONAL INFORMATION |
|30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. |
| |
|[Insert response here] |
| | |
|[These cells and rows are to facilitate the layout of your page. Rows can be | |
|added or deleted as needed.] | |
| | | |
| | | |
| |
| |
|31. SIGNATURE |32. DATE |
| |November 4, 2007 |
| | |
|33. NAME AND TITLE |
|[Insert response here] |
|ARCHITECT – ENGINEER QUALIFICATIONS |1. SOLICITATION NUMBER (If any) |
|PART II – GENERAL QUALIFICATIONS |
|(If a firm has branch offices, complete for each specific branch office seeking work.) |
|2a. FIRM (OR BRANCH OFFICE) NAME |3. YEAR ESTABLISHED |4. DUNS NUMBER |
|Marcus H. Bole & Associates |10/01/1993 |943646430 |
|2b. STREET |5. OWNERSHIP |
|104 Brock Drive | |
| |a. TYPE |
| |Sole proprietorship |
|2c. CITY |2d. STATE |2e. ZIP CODE |b. SMALL BUSINESS STATUS |
|Wheatland |CA |95692 |DVBE |
|6a. POINT OF CONTACT NAME AND TITLE |7. NAME OF FIRM (If block 2a is a branch |
|Marcus H. Bole, Principal |office) |
| |Marcus H. Bole $ Associates |
|6b. TELEPHONE NUMBER |6c. E-MAIL ADDRESS | |
|530-633-0117 |mbole@ | |
|8a. FORMER FIRM NAME(S) (If any) |8b.YR ESTABLISHED |8c. DUNS NUMBER |
|n/a | | |
|n/a |n/a |n/a |
|9. EMPLOYEES BY DISCIPLINE |10. PROFILE OF FIRM’S EXPERIENCE AND |
| |ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS |
|a. Function |b. Discipline |c. No. of Employees |a. Profile |b. Experience |c. Revenue Index |
|Code | | |Code | |Number |
| | | | | |(see below) |
| | |(1) FIRM |(2) BRANCH | | | |
| |Project manager |1 | | | | |
| |Biologist |1 | | | | |
| |Botanist |1 | | | | |
| |Hydrologist |1 | | | | |
| | | | | | | |
| | | | | | | |
| | | | | | | |
| | | | | | | |
| | | | | | | |
| | | | | | | |
| | | | | | | |
| | | | | | | |
| | | | | | | |
| | | | | | | |
| | | | | | | |
| | | | | | | |
| | | | | | | |
| | | | | | | |
| |Other Employees | | | | | |
|Total |4 | | | | |
|11. ANNUAL AVERAGE PROFESSIONAL |PROFESSIONAL SERVICES REVENUE INDEX NUMBER |
|SERVICES REVENUES OF FIRM |1. |Less than $100,000 |6. |$2 million to less than $5 million |
|FOR LAST 3 YEARS(Insert revenue index number shown at right) |2. |$100,000 to less than $250,000 |7. |$5 million to less than $10 million|
| |3. |$250,000 to less than $500,000 |8. |$10 million to less than $25 |
| |4. |$500,000 to less than $1 million |9. |million |
| |5. |$1 million to less than $2 million|10. |$25 million to less than $50 |
| | | | |million |
| | | | |$50 million or greater |
|a. Federal Work |2 | | | | |
|b. Non-Federal Work |5 | | | | |
|c. Total Work |5 | | | | |
|12. AUTHORIZED REPRESENTATIVE |
|The foregoing is a statement of facts. |
|a. SIGNATURE |b. DATE |
|[pic] |July 17, 2007 |
|c. NAME AND TITLE |
|Marcus H. Bole, Principal |
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related searches
- 2004 f150 5.4 belt diagram
- 2004 facts and events
- 2004 ford 4.6 engine problems
- 2004 f 150 engine problems
- 2004 ford f 150 problems
- ford f150 2004 engine problems
- 2004 ford 4 6 engine problems
- 2004 f150 5 4 crate engine
- 2004 ford 4 0 engine diagram
- 2004 f150 5 4 belt diagram
- 2004 f150 5 4 engine
- 2004 f150 5 4 replacement motor