Question 1

A developer is adding a Log Message activity in an Exit section of a single state within a state machine. When will the Log Message activity in the Exit section be executed? Options: A. After the activities in the Entry section and the activities in the trigger are executed. B. After the activities in the Entry section are executed, but only if there are exceptions. C. Immediately after the activities in the Entry section are executed. D. After the activities in the Entry section are executed and the transition to the next state is

confirmed. Answer: D

Question 2

A developer automates a process which has an Excel file as input data; however, Orchestrator is not available. As a result, the developer needs to adapt the Robotic Enterprise (RE) Framework for use with tabular data. Based on UiPath best practices, where should the Excel file be read and stored in a global DataTable variable? Options: A. In the new state in the Main.xaml that transitions from Init. B. In the InitAllApplications.xaml workflow. C. In the Get Transaction Data state in the Main.xaml.



UiPath UiPath-ARDv1

D. In the Ina state of the Main.xaml in the First Run sequence. Answer: C

Question 3

Scheduling a process is done from: Options are : Options: A. Orchestrator Server B. Not Possible C. UiPath Studio D. UiPath Robot Answer: A

Question 4

What is the difference between a Click activity whose SimulateClick property is checked and another one with the same property unchecked? Options are : Options: A. The activity with an enabled SimulateClick flag does not click the target element, it just simulates

the action B. The activity with the SimulateClick flag unchecked moves the mouse cursonr over the target

element, while the one with flag set does not move the mouse cursor C. The activity with an enabled SimulateClick flag does not click the target element, it just simulates

the action Answer: C

Question 5

Which is the best way to delete unreferenced variables?



UiPath UiPath-ARDv1 Options are : Options:

A. Delete them one by one from the Variables panel. UiPath Studio performs the workflow validation

in real time, therefore you can see which variable is being used. B. The unreferenced variables do not utilise memory, therefore you do not have to delete them. C. You can manage your variables from the Design panel > Manage Variables > Remove

Unreferenced. Answer: C

Question 6

Which of the following statements is true regarding Lists and Arrays? Options are : Options: A. You can add any number of elements to an array. B. You can iterate through a List using a For Each loop activity. C. List items can be added using an Add to Collection activity. D. Array and List elements can be accessed by index. Answer: B, C

Question 7

Which activities allow you to iterate through an array of strings? Options are : Options: A. For Each Row B. For Each C. While D. Do While Answer: B, C, D



UiPath UiPath-ARDv1

Question 8

What is Orchestrator used for? Options are : Options: A. Remotely controlling any number of robots and performing workflow management. B. Designing workflows to be run by robots in a supervised mode. C. Designing workflows to be run by robots in an unsupervised mode. D. Running Windows processes on the local machine. Answer: A

Question 9

What is the safest way to close an application? Options are : Options: A. By using the Process Name property of the Kill Process Activity B. By sending the Alt + F4 hotkeys C. By using the Close Application activity Answer: C

Question 10

How can a process be executed on three different robots? Options are : Options: A. By scheduling the process and adjusting the settings in the Execution Target tab accordingly B. By creating a job and selecting all three robots C. By deploying the process in the environment of the robots, which run it automatically D. It is not possible to allocate a process to three different robots Answer: A, B