TABLE OF CONTENTS

Introduction A. Planning Procedures

1.0 Designer's Relationship to the University 2.0 Initial Planning Conference 3.0 Site and Existing Conditions Information

3.1 Survey Criteria 3.2 Geotechnical Engineer 4.0 Project Development Schedule 5.0 Review of Design 5.1 Conference Memoranda 5.2 Submittals for Outside Review 5.3 Submittals for University Review 5.4 Payments to Designer 6.0 Project Development Phases 6.1 Schematic Design Phase 6.2 Design Development Phase 6.3 Construction Documents Phase 6.4 Bidding Phase 7.0 Construction Phase 7.1 Pre-Construction Conference 7.2 Periodic Observations 7.3 Submittal Review 7.4 Project Close-out Responsibilities

B. Design Guidelines

1.0 General Considerations 1.1 Campus Design 1.2 Drawings and Specifications Formats 1.3 Design Within Available Funds 1.4 Building Codes & Project Standards 1.5 Energy and Materials Conservation 1.6 Flexibility 1.7 Maintainability 1.8 Accessibility 1.9 Exterior Windows

1.10 Standard Stock Items 1.11 Recruitment and Selection of Minority Businesses 1.12 Dangerous Chemicals. Liquids, and Gases 1.13 Radiation Sources 1.14 Special Scheduling and Construction Constraints 1.15 Usage of Color

ii

Page 2 3 3 3 3 3 4 4 4 4 4 5 5 5 5 6 6 7 7 7 7 8 8 9 9 9 9 9 9 10 10 11 11 11 11 11 11 11 11 11

2.0 Site Design

11

2.1 Project Site

11

2.2 Site Limits

12

2.3 Walks, Ramps, steps, and Building Entry

12

2.4 Parking

12

2.5 Paving

12

2.6 Outdoor Spaces

12

2.7 Site Drainage

12

2.8 Erosion and Sediment Control

13

2.9 Landscaping

13

2.10 Exterior Lighting

34

2.11 Outdoor Recycling and Solid Waste Collection Site

35

2.12 Site Accessories

36

2.13 Exterior Signage

37

2.14 Site Utilities

37

2.15 Shielding of Equipment

38

2.16 Protection of Underground Tanks and Pipes

38

2.17 Emergency Phones

38

3.0 Building Envelope

38

3.1 Exterior Materials

38

3.2 Glazing

40

3.3 Doorways

40

3.4 Exterior Storefronts

40

3.5 Roof Access

40

3.6 Ledges and Bird Roosts

40

4.0 Superstructures

40

4.1 Special Foundations

40

5.0 Interior Layout and Construction

40

5.1 General

40

5.2 Space Organization

42

5.3 Office Standards

42

5.4 Classrooms

42

5.5 Custodial Closets

43

5.6 Hazardous Materials Room

43

5.7 Mail Service Facilities

43

5.8 Mechanical and Electrical Equipment Rooms

43

5.9 Recycling Alcoves

43

5.10 Telecommunications

43

5.11 Building Address

48

5.12 Room Numbering

48

5.13 Temporary Egress

48

5.14 Laboratory Buildings

48

5.15 Asbestos in Buildings

48

5.16 Interior Signage

48

5.17 Millwork

48

iii

6.0 Finishes and Equipment

49

6.1 Selection and Procurement

49

6.2 Floor Materials

49

6.3 Interior Wall Finishes

50

6.4 Safety Color Coding

50

6.5 Window Covering

50

6.6 Elevators

50

6.7 Elevator Controller

51

6.8 Elevator Equipment Rooms

51

6.9 Door Hardware

51

7.0 Furniture and Equipment

52

7.1 Furniture Selection and Procurement

52

7.2 Furniture Lighting

52

7.3 Furniture Coordination

52

7.4 Furniture Installation

52

7.5 Power Clusters at Private Offices

53

7.6 Modesty Panels on Modular Furniture

53

7.7 Fixed Equipment 53

7.8 Moveable Equipment

Building Service Systems

53

8.0

8.1 General

53

8.2 Energy Conservation

53

8.3 HVAC System

54

8.4 Air Handling System

55

8.5 Water Cooling Systems

58

8.6 Central Utility Distribution System

59

8.7 Plumbing Systems

60

8.8 Fire Suppression System

62

8.9 Power Distribution System

62

8.10 Interior Lighting

67

8.11 Fire Alarm and Detection Systems

69

8.12 Rooftop Equipment

70

8.13 Lightning Protection

70

C. The Construction Contract

71

1.0 General

71

2.0 Shop Drawings, Submittals, Samples, Data

71

2.1 Selection of Brick or Cast Panels for Exterior Walls

71

3.0 Materials, Equipment, Employees

71

3.1 Specification of Competitive Materials

71

3.2 Condition of Contiguous Work

71

4.0 Permits, Inspection, Fees, Regulations

71

iv

4.1 Permits and Fees

71

5.0 Protection of Work, Property, and the Public

71

5.1 Protection of Underground Utilities Lines

71

5.2 Protection of Storm Drainage System

72

5.3 Protection of Existing Landscape

72

5.4 Protection of Campus Buildings, Streets, and Sidewalks

72

5.5 Shutdown of Existing Fire Protection Systems

73

5.6 Generating Smoke, Heat, or Dust

73

5.7 Safety Measures

73

5.8 Security Measures

73

5.9 Hazard Communication Measures

73

5.10 Asbestos Containing Materials

73

6.0 Inspection and Testing

73

7.0 Use of Premises

74

7.1 Use of Owner's Drinking and Toilet Facilities

74

7.2 Contractor's Working Hours

74

7.3 Noise-Making Activities

74

7.4 Temporary Interruption of Utilities and Traffic Movement

74

7.5 Site Limits

74

7.6 Contractor Parking and Storage

74

8.0 Utilities, Structures, and Signs

75

8.1 Utilities

75

8.2 Signs and Construction Sites

75

8.3 Identification by Room Number

75

9.0 Cleaning Up

75

10.0 HUB Subcontracting Plan

75

D. Selection and Evaluation Policy

77

1.0 Architect Selection Process

77

1.1 General

77

1.2 Evaluation

77

2.0 Contractor Selection Process

77

2.1 General

77

2.2 Evaluation

77

Appendix A Peripheral Campuses Standards

78

Appendix B Telecommunications

81

Appendix C Fire Alarm Specifications

82

Appendix D Distributed Learning Videoconference Room Design Consideration

89

Appendix E Guide For The Standardization Of The Campus Automation System

94

Appendix F Interior Signage Standards

96

v

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download