C. The shipyard is required to provide the provisioning ...

For demand-based items, the Navy Variable Threshold Model ranks each item. If the cost is higher, the ranking will be lower. Likewise, if the demand is higher during lead-time, the ranking will be higher. The model starts with the highest ranked stockage candidate, computes the amount to buy, and subtracts the value of the buy from the budget. ................
................