Oil Insulated Switchgear Guide Specification

CPT’s and/or VT’s and associated fuse assemblies shall be fixed mounted inside the switch tank and shall be readily accessible with a removable cover. All leads shall be brought out of the tank using a Ductorseal that is designed to maintain the leak integrity of the tank (1 x 10-5 cubic centimeters per second leak rate) and terminated at ... ................
................