2ndry Drainage System



UPDATED: 01 MAR 2010

SECONDARY DRAINAGE SYSTEM CHECK SHEET

FOR USS _________________

DATE: __________

REF: (A) PMS Eductor System Valve Leak Test [See Table 1 Below]

(B) PMS 5000/005 Valve & Valve Operators [See Table 2 Below]

(C) PMS 5000/006 Hydraulic Valve Control Station

(D) NSTM 079 VOL-II

(E) NSTM 505

(F) Ship’s EOSS

(G) Ship’s DC BOOK

(H) Joint Fleet Maintenance Manual (JFMM)

(I) Damage Control Readiness Advisory (DCRA) 2005-4

| |IAW |SAT / |SAT / |SAT / UNSAT |SAT / UNSAT |SAT / UNSAT |

| | |UNSAT |UNSAT | | | |

|COMPARTMENT NUMBER: | | | | | | |

|A. HYDRAULIC REMOTE VALVE OPERATING STATION | | | | | | |

|INSPECTION: | | | | | | |

|2. Were the valve position indicator lights |5000/005 A-4 | | | | | |

|operational (close and open)? | | | | | | |

|3. Is proper activation handle / crank | | | | | | |

|located at MVHC station? | | | | | | |

|4. Was relief valve tested and set? |5000/006 60M-1 | | | | | |

|Note: PMS records will require review for | | | | | | |

|relief valve set date. | | | | | | |

|5. Was the MVHC system leaking hydraulic |5000/006 2M-1 | | | | | |

|fluid? | | | | | | |

|B. SECONDARY DRAINAGE SYSTEM INTEGRITY: |EOSS, DC Book, JFMM | | | | | |

| |Operators/Position | | | | | |

| |Indicators IAW MIP | | | | | |

| |5000/005 and Table 2. | | | | | |

| |See Table 1 for leak | | | | | |

| |test MIPs | | | | | |

| |Table 1, MRC A-9 | | | | | |

|2. Missing components (brackets, suction | | | | | | |

|screens/gratings, sweep hose connection caps,| | | | | | |

|operating procedures, valve hand wheels) | | | | | | |

|3. Valve identification/classification | | | | | | |

|labeling. | | | | | | |

|4. Remote operators connected. | | | | | | |

|5. Bilge pockets free of foreign matter. | | | | | | |

|6. Ensure EOSS procedure or local procedure | | | | | | |

|is posted in the vicinity of the eductor | | | | | | |

|operating station (both local and remote). | | | | | | |

|C. SECONDARY DRAIN EDUCTOR SEA-TO-SEA | | | | | | |

|OPERATIONAL DEMONSTRATION: | | | | | | |

| | | | | | | |

|2. Eductor suction gage was correct range. | | | | | | |

|(30” Hg-0-300 psig). | | | | | | |

|3. Fire main actuating water valve leaked by.| | | | | | |

|4. Eductor overboard discharge valve | | | | | | |

|operation (with remote operator, if | | | | | | |

|applicable). Verify position indicators, if | | | | | | |

|installed. (Note: Ensure all suction cut-out,| | | | | | |

|bulkhead isolation and bilge drain well | | | | | | |

|suction valves are closed prior to operating | | | | | | |

|the eductor.) | | | | | | |

|5. Eductor fire main actuating water valve | | | | | | |

|operation (with remote operator, if | | | | | | |

|applicable). Verify position indicators, if | | | | | | |

|installed. | | | | | | |

|6. Fire main supply pressure indication on | | | | | | |

|local and remote gage(s), as applicable and | | | | | | |

|were calibrated. | | | | | | |

|7. Vacuum indication on local and remote | | | | | | |

|suction gage(s), as applicable. | | | | | | |

|D. DRAINAGE SYSTEM VALVE LEAKAGE TESTING: |EOSS, DC Book, JFMM | | | | | |

| |Operators/Position | | | | | |

| |Indicators IAW MIP | | | | | |

| |5000/005 and Table 2. | | | | | |

| |See Table 1 for leak | | | | | |

| |test MIPs | | | | | |

| |Table 1, MRC | | | | | |

| |A-9 | | | | | |

|2. Bilge Drain well valve(s) operation (with | | | | | | |

|remote operator, if applicable). Verify | | | | | | |

|position indicators, if installed. | | | | | | |

|3. Bilge suction valve(s) leak by. (Indicated| | | | | | |

|by water leaking into drain well) | | | | | | |

|4. Eductor suction check valve leak by. | | | | | | |

|(Indicated by water flowing from sweep hose | | | | | | |

|connection, if installed.) | | | | | | |

|5. Eductor overboard discharge valve leak by.| | | | | | |

|(Indicated by a pressure drop of greater than| | | | | | |

|10 PSI in one minute with fire main actuating| | | | | | |

|water valve secured) | | | | | | |

TABLE 1

DRAINAGE VALVE LEAK TEST MIPS

A. LHD-1 CLASS: MIP 5290/010

B. LHA-1 CLASS: MIP 5290/R01

C. LCC-19: MIP 5290/R01

D. LPD-4 CLASS: MIP 5290/R01

E. LPD-17 CLASS: MIP 5291/002

F. LSD-41 AND LSD-49 CLASS: MIP 5291/002

G. MCM-1: MIP 5291/003

H. ARS-50 CLASS: MIP 5290/008

I. CG-47 AND DDG-51 CLASS: MIP 5291/001

J. FFG-7 CLASS: MIP 5290/001

K. CVN-68 CLASS: MIP 5290/006

L. PC-1 CLASS: MIP 5290/013

TABLE 2

REMOTE OPERATOR MRC LISTING

A. PNEUMATIC OPERATED: MIP 5000/005, MRC A-1

B. MANUALLY OPERATED (Note 1)MIP 5000/005, MRC A-2

C. ELECTRICALLY OPERATED: MIP 5000/005, MRC A-3

D. HYDRAULIC OPERATED: MIP 5000/005, MRC A-4

Note 1: Manually operated valves include those operated locally at the valve hand wheel and remotely via Teleflex cables or reach rods.

|REMARKS: |

| |

| |

| |

| |

| |

| |

ASSESSOR(S):____________________ ____________________ DATE: _________________

................
................