Emergency Care and Transportation of the Sick and Injured ...

The contractor shall replace one set of single wall AST with a new double wall AST including air vent, level gauge, water trap, saddle, and piping system as per the drawing A-01, A-02, and A-03. The double wall AST shall have 500 gallon capacity and be designed, built, labeled and tested per UL142 requirements. ................
................