Concept Development Report Template - New Jersey



INTRODUCTION

A. Foreword

B. Original and Successor Projects

C. Data Reviewed

D. Design Standards

E. Characteristics of the Roadways and Surrounding Area

F. Concept Development Scope Statement

G. CD Public Involvement Action Plan

PURPOSE AND NEED

H. Bridge Needs

I. Scour Needs

J. Maintenance Needs

K. Roadway Needs

L. Goals and Objectives

EXISTING INVENTORY AND CONDITION

M. Existing Bridge Inventory and Condition

N. Scour

O. Maintenance Issues

P. Existing Roadway Inventory and Condition

Q. Summary of Existing Deficiencies

R. List of Substandard Design Elements

S. Management Systems Input

T. As-Built Plans, Right of Way Maps and Jurisdiction Map

TRAFFIC AND CRASH SUMMARY

U. Traffic Operations

V. Traffic Data

W. Traffic Volume Forecasts

X. Crash Data Analysis and Crash Diagram

SOCIAL, ECONOMIC AND ENVIRONMENTAL SCREENING

Y. Community Outreach

Z. Noise and Air Quality

AA. Socioeconomics

AB. Cultural Resources

AC. Section 4(f) Properties

AD. Highlands/Pinelands

AE. Wetlands

AF. Reforestation

AG. Floodplain

AH. Sole Source Aquifer

AI. Threatened/Endangered Species

AJ. Category 1 Waters

AK. Vernal Pools

AL. Stormwater

AM. Hazardous Waste

AN. Anticipated Environmental Permits or Approvals

AO. Complete Street Policy

AP. Environmental Summary with Probable NEPA Document required

EVALUATION OF CONCEPTUAL ALTERNATIVES

AQ. Bridge Rehabilitation versus Bridge Replacement

AR. Temporary Bridge Location and Widening Constraints

AS. Conceptual Alternatives

AT. Traffic Analysis

AU. Hydrology & Hydraulics Analysis

AV. Right of Way Impacts and Review

AW. ITS Facilities

AX. Access Impacts and Review

AY. Constructability and Staging Plans and Detour Plan

AZ. Controlling Substandard Design Elements and Reasonable Assurance

BA. Construction Cost Estimate

BB. Value Engineering Study and Report

BC. Life Cycle Cost Analysis

BD. Alternatives Matrix

BE. Discussions with Subject Matter Experts

BF. Preliminary Preferred Alternative (PPA)

BG. Preliminary Engineering Scope Statement

CONCEPT DEVELOPMENT RECOMMENDATION

BH. Federal Highway Administration (FHWA) Approval of Report

BI. Capital Program Screening Committee (CPSC) Recommendation

BJ. Capital Program Committee (CPC) Approval

Appendices

2 Problem Statement/Charter

3 Bridge Re-evaluation Survey Report (latest cycle)

4 Bridge Scour Evaluation Report (latest cycle)

5 As-Built Plans, ROW Maps, and Jurisdiction Map

6 Tax Maps

7 Crash Data

8 Traffic Counts

9 Aerial Plan and Photographs

10 Straight Line Diagrams

11 Traffic Volumes (VPH) Graph

12 Collision Diagrams

13 Environmental Screening and Constraint Map

14 Conceptual Alignments, Right of Way Impacts, Environmental Constraints, Bridge Staging, Profile and Local Detour

15 Public Communications

16 Design Communications Report (DCR)

17 Resolutions of Support

18 NJDOT Communications

19 Cost Estimates

20 Alternative Comparison Matrices

21 Life Cycle Cost Analyses

22 Systems Engineering Review Form

23 Project Management Plan

24 Preliminary Engineering Public Involvement Action Plan

25 Preliminary Engineering Scope Statement

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download