Item 102 - Grubbing
941.2.2.1.4 Rock cuts shall be staked and graded in accordance with Standard Drawing 941-1 at spacing indicated in 941.3.1.6. Prior to requesting cross sections for quantity payment from the Engineer, the Contractor must expose all rock to be excavated within the Work area as indicated in 108.4.3.1.1 over the length of the bedrock cut or 50 m longitudinally, whichever is lesser. ................
................
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related searches
- wow item database
- most sold item in america
- most bought item online
- cheapest item at starbucks
- best item to sell online
- the most purchased item online
- most selling item online
- the most bought item online
- number one selling item on amazon
- minecraft item randomizer
- minecraft item generator command science
- 102 fever after vaccination