Construction Safety & Health Management System

The consultant should be prepared to validate the overhead costs with a certified statement from the sponsor's auditor, state's auditor, or consultant's accountant. A firm can demonstrate that the non-allowable costs are not included in its overhead calculation rather than requiring a complete audit in advance of contracting. ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download