General Self-Inspection Worksheet (February 2021)

If the supply scheme for the plant auxiliary load is such that there is a possibility that auxiliary power is not taken from the generator bus of a unit at any given time, the capacity of the corresponding main step up transformer shall be selected to allow delivery of the gross output of the unit to the power system under the conditions ... ................
................