9-1-17 v2.24 Ready for final review

For tasks included in Sections 5.1.10, 5.1.11, 5.1.12, and/or 5.1.13 below, the Contractor shall meet at least weekly with each SME team to determine the specific content and design of each KNART. In the event no VA SMEs are available for a SME team, the Contractor SME(s) shall attend all such meetings. ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download