PROJECT TITLE - Six Sigma
PROJECT TITLE:
Travan TR7 Dynamic Electrical Test Failure Reduction
TEAM : Elite Sigma
MEMBERS: Name Joel Amil Johnny Ledesma Ernesto Manuel Eric Maligaya Lito Suba Marvin Marte
Position Process Eng'g. Manager Process Engineer Process Engineer Customer Interface Test-Section Manager QA Manager
MEETING TIME / VENUE: Place: Schedule: Time: Attendance: Start Date: End Date:
Joel Amil's room Monday's through Fridays 1245H to 1400H 88.7% Dec. 2002 Feb. 2003
Responsibility Team Leader Mechanical Issues (FA/CA) Electrical Test Issues (FA/CA) Mechanical Issues (FA/CA) Electrical Test (Equipment and Setup Customer Interface
1.0 INTRODUCTION:
Read-Rite Philippines is the manufacturing site for Tape Head Business Unit,and the core competency is assembly and test. Read-Rite (Tape Head Business Unit) manufactures magnetoresistive (MR) tape heads to the entry level through mid-range tape drive markets, with products such as Travan, DLT (Digital Linear Tape), SLR (Scalable Linear Recording) and SDLT (Super DLT).
In order to become competitive in the market, QUALITY, COST and DELIVERY performance must be world-class. This case study describes the low first pass yield problem at Final Test station (Travan TR7), which is one of the major sources of high-cost-manufacturing, and how it was solved.
1.1 Yield
TR7 tape heads are used for Travan 40 tape drives which offer up to 20 Gbytes native storage capacity (40 Gbytes compressed). Seagate Line, Travan TR7 product First Pass Yield at Dynamic Electrical Test (DET) shows a stable but low trend at an average of 61% as shown in the graph below.
Electrical Test First Pass Yield Trend
90.00%
80.00%
70.00%
60.00%
50.00%
40.00% FPY
may 02 65.42%
jun 02 62.99%
jul 02 62.27%
aug 02 63.67%
No Build
sep 02
oct 02
nov 02 56.31%
dec 02 57.49%
1.2 Pareto of Defect
Pareto chart shows the dominant failures are Low Output (f_out and r_out), Fwd_rev ratio (f_r ratio) and Forward Resolution (fwd_res). These three defects comprise the vital few equivalent to 85% of the problem.
Pareto of Defects (First Pass Yield)
10000 9000 8000 7000 6000 5000 4000 3000 2000 1000
0 low f_r ratio fwd_res asym oW
output
120.0% 100.0%
80.0% 60.0% 40.0% 20.0%
0.0% 2H rev_res tens- Iwrite no signal
sens
Defect Distribution
others 15%
fwd_res 18%
low output 46%
f_r ratio 21%
1.3 Defect Rate
- Chart below shows the hierarchy per defect (Average defect rate from May to Dec). 1. low output = 22% failure rate 2. f_r ratio = 9% failure rate 3. fwd_res = 5% failure rate 4. Others = 3% failure rate
50.00% 45.00% 40.00% 35.00% 30.00% 25.00% 20.00% 15.00% 10.00%
5.00% 0.00%
9.41% 10.35% 10.25%
May
8.19% 9.37% 14.14% June
Defect Rate (First Pass)
7.53% 8.64%
6.84% 8.96%
15.44%
13.70%
July
Aug
No Build
Sep
Oct
3.69% 5.36%
5.81% 7.41%
31.49%
22.66%
Nov
Dec
2H No Signal Iwrite rev_res oW As ym fwd_res f_r ratio low output
1.4 Definition:
Output Voltage is defined as the quotient between the High Frequency measurement output by the gain of the test pre-amp and filter circuit.
Forward/Reverse ratio mismatch is calculated from the signal output in the forward and reverse direction.
Fwd/Rev Ratio (%) = (MAX Output - MIN Output) * 100 / MAX Output
Resolution shall be measured as the ratio of the Fd signal amplitude, divided by the write-equalized Fd/8 signal amplitude.
Physical manifestations and engineering attributes:
Output is a measure of the output voltage at the head's highest Recording Density. Output depends on the ability of the head to read a very small (weak) signal that was written to and stored on the magnetic tape. The closer the tape is to the head or the better the contact between the tape and the head, the stronger (large) the signal is and the higher the output. Resolution and output are quite related. The process induced parameters that will affect them are: PTR (Pole Tip Recession), stripe height, spacing (contour affecting tape/head interface). PTR will affect both the output and resolution (resolution is ratio of HF output to LF output) while, contour in particular how the gap is centered will affect relative response in FWD or REV direction.
TBS PTR
P2 P1
Shield
Cross-sectional view of TR7 head
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
- success story i3070 inline ict improves functional test
- lessons learned on how to increase oee performance
- manufacturing insights report
- building an effective supplier control program
- understanding lean principles that dramatically impact
- measuring overall equipment effectiveness oee and the
- project title six sigma
Related searches
- project manager title levels
- lean six sigma tools
- alternative title for project manager
- six sigma measure phase tools
- six sigma measure phase case study
- six sigma study material
- six sigma performance measures
- six sigma problem statement examples
- six sigma standard deviation explained
- six sigma calculator
- lean six sigma standard deviation
- title for project manager