THIRD PARTY INSPECTION SERVICES OF PECL



THIRD PARTY INSPECTION

(

PMC

(

TECHNICAL &ALLIED SERVICES

OFFERED BY

PRS EC

PRS ENGINEERING CONSULTANTS

13/ 102 NAMRATA, SEC.NO.-16

KOPARKHARNE, NEW MUMBAI-400709 INDIA

TEL/FAX:+22 27547006 Mobile:+9819199107

E-mail: dpks55@ / prs_ec55@yahoo.co.in

Company Profile PRS EC

THIRD PARTY ENGINEERING INSPECTION, PMC & ALLIED ENGINEERING SERVICES OF PRS EC

PRS Engineering Consultants is a leading Engineering and Consultancy organization, with extensive experience in Design Engineering, implementation and inspection of wide variety of infrastructure project related to petrochemicals, fertilizers, metallurgical and allied projects.

Over the years PRS EC has been rendering PMC, Quality Assurance & Inspection services as well as Geo Technical Services for various projects in Petrochemical, Chemical, Oil & Gas, Power Generation, Ferrous & Non-ferrous, Space, Nuclear Power, Textile, Pharmaceutical, Research & Defence fields. This includes various technological equipment, material handling, utilities, power distribution, instrumentation, tele-communication, distributed control system, PLC, refractories, technological structures, other bought out proprietary items etc.

PRS EC also undertakes Inspection of various plant and equipment as well as Investigations & Confirmation of various activity related to Geo Technical Services at its sub-vendor’s premises with qualified and dedicated professionals. All inspections are carried out with high integrity, strictly adhering to applicable international codes and standards with firm commitment.

Experience of PRS EC in the above areas have led to undertaking Project Management Consultancy & Third Party Inspection( TPI ) Services as well as Geo Technical Services on a large scale during the last few years.

PRS EC’s expertise in the field of Third Party Inspection (TPI) Services and allied engineering services are enumerated in the documents as.

INSPECTION

Third Party Inspection and Certification (TPI &C) of all engineering products.

Inspection activities have wide range under the code guidelines of quality acceptance and purchaser's satisfaction. Which includes -

Checking of Quality Assurance Plan of contractors/ vendors and making suggestions if necessary and approval to final acceptance of quality.

To ensure that contractors / vendors carry out work in accordance with their respective quality assurance programme.

Undertake inspection and witness such tests, which are required to ensure that all equipments and materials procured confirm to the specifications and relevant codes and standards as per approved Quality Assurance Plan (QAP).

Inspection of material, plant equipment and structures at vendors works before despatch.

Inspection of received material at site to assess to start landing, damages and recommend replacement measures.

Company Profile PRS EC

Stages / routine inspection as well as final inspection based on following codes e.g. ASME, BS, DIN, IS and other relevant codes / standards

Testing of material as per approved QAP.

Issue of routine inspection memo.

Checking of compliance report, if any.

Issue of final acceptance certificate.

For quality acceptance we have reliable and approved laboratories for material testing as well as highly motivated and dedicated trained section of NDT Personnel, having highest safety training to carry out jobs of international safety standards.

EXPEDITING

PRS EC offers the expediting services of post order / LOI of vendors and includes:

Interaction with purchaser

Study and scrutiny of vendor's manufacturing schedule

Obtain and review of vendor's manufacturing schedule

Monitor vendor's progress and organise review meeting with vendors whenever necessary.

Expedite with vendors for submission of drawing/documents/spare parts lists etc.

Compilation of items, sub vendors and delivery based on vendors report.

Reporting / co-ordination between purchaser and vendor.

Expediting of despatch based on inspection clearance and as per P.O.

Preparation of monthly progress reports based on the reports of progress of work by vendors.

Expediting services relating to timely delivery of equipments and supplies

Despatch and delivery information from vendors.

DESIGN ENGINEERING

PRS EC have a developed section of engineers for designing and detailing of all types of static/rotary equipments and other general engineering related to petrochemicals, chemicals and metallurgical. We take design work based on purchaser's process/ service specifications/ data supplied. For critical equipment we also use Computer Added Design (CAD). Our design section also prepare mechanical specification sheet and selection of material for required services based on process specification.

DRAWING AND APPROVAL

PRS EC's drawing activities includes

a) Preparation of drawing for enquiry floating and detail drawing for fabrication, based on detail design available from design sections/ purchasers. Preparation of bill of materials, detailing of data and legends, revision Incorporation as well as preparation of As Built Drawing.

b) Drawing and design calculation checking and approval activity includes checking of detailing with reference to design as per code/ standards and PRS EC's standards and marking of flaws for incorporation. Checking of bill of materials. Detailing of legends for better follow up of fabrication and safety.

Company Profile PRS EC

FLEXIBILITY ANALYSIS

PRS EC's flexibility analysis group takes the job like study of information/ specifications supplied by the purchaser/ contractors and preparation of isometrics, bill of quantity, General Arrangement drawings, Stress Analysis.

FRACTURE ANALYSIS AND FAILURE ANALYSIS

PRS EC's special section also involved in pipe lines and critical equipment for analysis of special services like life assessment and failure analysis which is based on experimentation and computer results. We follow the technique like CTOD (MOD), K1CC, Stress pattern, Displacement pattern, Simulation Technique, Stress Corrosion Cracking (SCC), Hydrogen corrosion cracking (HCC) for our metallurgical report and decision to use the material for particular services.

SUPPLY

Scope of Supply includes various industrial equipments and accessories e.g

❖ Valves:Ball,Gate,Check,Globe,Butterfly,Diaphragm,NRV,Hammer Blind NRV, Safety etc as well as various types of pressure & Temp. Gauges.

❖ Fasteners, Flanges and Forged items as per Standard

❖ Pipes, Fittings, Vessels, Power Cables, Inst. Cable & Tray , PP and FRP

❖ Fab. items e.g Pressure Vessels,Heat Exch,Tanks,Towers,Strainer, Filter ..

❖ Industrial Equipments/Package (Chlorination System/ DM Plant )

❖ Man Power Supply (Exp.Engr.Mec., Civil/structural, Elec./Instumentation)

GEO TECHNICAL

PRS EC along with their associates M/S Soil Exploration Services undertakes all sorts of Investigation & Confirmation of drilling, boring and sampling for Foundation works as well as various Civil and Infrastructures projects. Our Associates are experienced, with execution of more than 100 projects, and are fully equipped with facilities and having world class devoted geo technologists along with consulting & drilling engineers.

Facilities and Equipment can be enumerated as

Laboratory Facilities: Sieve analysis, Hydrometer, Moisture Content/ Specific Gravity, Liquid limit/ Plastic limit/ Shrinkage limit, Wet & Dry densities, Proctor Compaction CBR- Soaked/ Unsocked, Direct sheer Test, free Swell Index, Tests on rocks, Water, etc

Field Equipment: Seismic and Electrical Resistivity Surveys, Auger with Tripod Derrick, Rotary Core Drilling, Plate load test of 50 ton capacity, Filled Pumping/ Permeability/ Packer Test etc.

PATENTED TECHNIQUE DEVELOPED

PRS EC has developed an state of art technique for Power plant which helps for making coil edge preparation as required by purchaser, fabricator at any angle at OD & ID of Tube for better process control and welding as well as quick & mass production which saves over all fabrication time. Boiler, Economizer plant has well accepted this technique.

Company Profile PRS EC

INFRASTRUCTURE

PRS EC along with Associates undertake various type of infrastructural job like Indian Railway’s bridge construction, rail laying (complete activity) etc.

TQM/ ISO 9001

PRS EC’s Qualified Auditor takes the Internal Auditing for ISO 9001 system and also offering training to the vendor for Total Quality Management and preparation for documentation as well as art of achieving ISO 9001 system.

LIAISON

PRS EC liaison section also takes liaison contract and interaction activity to various Clients/ Industries in India.

INDUSTRIAL CATASTROPHE MANAGEMENT

PRS EC Catastrophe Management team are fully versed to the solution for all sorts of technical catastrophe arises in the industry and their solution. Our highly motivated and dedicated trained personnel are very prompt to carry out jobs of international safety & standards.

NDT SERVICES

PRS EC’s Non Destructive Testing section are fully devoted towards ensuring quality and achieving excellence, employing state of the art in following services

• Radiography Testing (Gamma/ X-Ray )

• Ultrasonic Flaw Detection

• Liquid Dye Penetrant Testing

• Magnetic Particle Testing

• Ultrasonic Thickness Gauging survey

• Positive Material Identification (PMI)

• Coating thickness Gauging & thickness of metal through coating

• Pre & Post Weld Heat Treatment

• Residual Life Assessment (RLA) of Boilers,Horton Spheres & Pres. Vessels

• Cathodic Protection of Pipelines, Ship hulls, underground storage tanks

• Cathodic Protection Monitoring

• In-situ Mettalography

• Destructive and Mechanical Testing

• Training and Certification of Welding and NDT, QA/QC level I & II ( ASNT)

MISCELENIOUS SERVICES

PRS EC also executes various services like Plant Automation Survey & Maintenance, Painting of plants & Terminal equipments & accessories, Internal Painting of pipes, Wrapping coating of pipes for under ground pipelines, Maintenance of Pumps, Valves, Fire Fighting, FRP Ducting & Canopy, Civil Construction of Oil Water Separation (OWS) system, Ethanol Tank, Foam sealing for MS tanks, PCC & RCC work etc, Feasibility Study of Pipelines & Equipments for installation & Revamping, PA System , various contracting & supply.

Company Profile PRS EC

INSPECTION OF EQUIPMENTS AT A GLANCE

PETROCHEMICALS, FERTILISERS, OIL & NATURAL GAS AND POWER ENERGY SECTOR : Complete plant equipment

Pressure Vessels Heat Exchangers (Spiral, Plate, Tubular ) Tanks Stripper Absorber Towers and Columns Filter Reactor Chiller Chlorinator Pumps Compressors

Regenerator Methanator Convertor Condenser Decomposer Cryogenic Vessels

Actuators Forgings Pipes (ERW, API, seamless, Fabricated) Fasteners Blowers

Bullets Horton Spheres Chimney Strainer Weighing Machines Structural Items

Ceramics Rubber Lined Items Refractory Linings-Castables & Hysils Evaporator

Equipments/ Items of CS,SS,Copper, Titanium, Brass, Hastaloy, PP & FRP Turbine

Off shore Plate Form PP, FRP, MDP, HDP Pipes, Fittings, Cable Trays and Gratings

Pipelines CNG Cascade

STEEL SECTOR/NON FERROUS (Al & Cu ): Complete Plant Equipments

Blast Furnace Under Burden Probe Cradle Pig Casting Machine Cranes Skip Hoist Research Ladle and WC roof Furnace BF Valves Actuator Pumps Blowers Dryer

Compressors ( CENTAC, Reciprocating etc) DG Set Elevators Waste Heat Boiler

Converter Blowers Equipments for water Treatment Plant Pipes Tundish Transfer Car

Equipment for Sintered Plant Slag Handling Equipment Converter and Anode Furnace Stacker Reclaimer Hooks Wire rope Ceramics - Refractory Linings,Emery etc.

HOT AND COLD ROLLING MILLS: Complete plant equipment

Mill Stand-Finishing accuracy up to 10 micron with special equipmentsHydraulic Cylinder

Chocks - Backup Chocks and Work Roll Chocks Top Drive Mechanism Rolls Upender

Mill Housing Assembly Hydraulic Mechanism Coupling, Sleeve - Plain and Threaded

Coil Transfer Car Looper Guide Assembly Intermediate and Main Conveyer System

Sprocket Assembly Gear and Motor System Entry and Exit Guide Assembly Coils

Vanishing Stopper Mechanism etc.

ELECTRICAL AND INSTRUMENTATION :

AC/DC Motors Thyrister Control Panels Transformer Switch Gear Transmitters

Power Distribution and Lighting Transformer NE Resistor Dist. Control System DCS & UPS KV Power Cables Power and Control Cables MCC & Bush Duct Battery Aux. D. Boards Prefab. G.I. Tray/ Rack Safety Lighting Lighting Fixtures Industrial /Civil Type Lighting FLPLCs and Canopy Distribution Boards for UPS FLP Switches Socket Plug

Junction Box Cable Glands, KVLBS Battery Charger Lighting Poles etc.

STRUCTURALS:

GSLV Rocket launching Pad TLT &TLD Structures of Pipe Line Tankage Terminal

FIRE FIGHTING COMPLETE SYSTEM

LABORATORY / HOSPITAL EQUIPMENTS:

Microscope Autoclave loop incinerator Incubator safety cabinet Water Distiller Plate ShakerHot Air Oven Photometer Centrifuge Anaerobic Jar Eliza SystemTrolly Patient Bed Oxygen Cylinder and Oxygen Pipelines Emergency Systems Etc

Company Profile PRS EC

LIST OF PROJECTS / PLANTS IN WHICH OUR ASSOCIATION /

INVOLVEMENT WERE

1. FERROUS / NON FERROUS SECTOR

Copper Smelter Project, Birla Copper/ Indogulf Rajinder Steel Ltd. ( 4 Hi HSM )

National Aluminium Company (NALCO) MALCO BALCO

Rourkela Steel Plant Durgapur Steel Plant Bokaro steel Plant

Bhilai Steel Plant Vizag Steel Plant MECON's Steel Project

Simplex Steel Project JVSL Bangla desh Steel Re Rolling Mill (BSRML)

2. POWER SECTOR

National Thermal power Corporation (NTPC )

National hydro Electric Power corporation (NHPC)

Gujarat Industrial Power Corporation (GIPCL )

Nuclear Power Corporation (NPC ) TAPP 3&4

Chlorination Plant & DM Plant

Jharkhand State Electricity Board (JSEB )/ BSES

3. PETROCHEMICALS AND FERTILISERS

Rastriya Chemical and Fertilisers Ltd (RCFL)

Indian Farmers and Fertlisers Corporation (IFFCO)

National Fertilisers Ltd (NFL)

Indogulf Fertilisers and Chemicals Corporation (IGFCC)

Shree Ram Chemicals and Fertilisers, Kota and Delhi

Punjab National Fertlisers, Naya Nangal

Tata Chemicals Ltd (TCL)

Chambal Fertilisers Ltd, Kota

Gujrat Narmada Fertilisers Corporation (GNFC)

Hindustan fertilizers and Chemicals Ltd (HFCL), Namrup-III

CO2 Recovery Plant

Lubrizol India Ltd (MTBE Cracker Plant)

IOCL Tankage Terminal

4. OIL AND NATURAL GAS SECTOR

Oil & Natural Gas Projects/ GGS On Shore

Indian Oil Corporation Ltd( IOCL)

LPG Bottling plant,Delhi, Kanpur, Ballabhgarh,Sabai madhopur,Karnal

Indian Petrochemicals Corporation Ltd (IPCL)-Different Projects

Gas Authority of India Ltd (GAIL)-Plants & Pipe lines Projects

Off Shore Plate Form ( ONGC/ MDL)

5. SPACE/ INFRASTRUCTURE

Second Launch Pad (GSLV Project), Shrihari Kota

6. TEXTILE

Export order for South Africa

7. DRUGS & PHARMACEUTICAL EQUIPMENT

Govt. Of India ANTI TB DRUGS- LUPIN & MACLEODS

Company Profile PRS EC

DETAILS OF MAN POWER (Degree holders/ Skilled/ Unskilled manpower)

|S.No | Name of Employee |Designation |Qualification |Experience |

| | | | |(in years) |

| 1 |DR. P.K.Singh |Chief Executive |Ph.D (IIT), M. Tech(IIT), B.Tech(BIT), |29years |

| | | |PGDHRM | |

| | | |Mechanical | |

| 2 |DR. F. Sinha |Chief Engg. Manager |Ph.D(IIT), M. Tech(BIT) B.Tech(BIT) |36 years |

| | | |Mechanical | |

| 3 |A.K. Singh |Manager Engg |B.Tech. Metallurgy |16 years |

| 4 |V. K PATEL |Manager Engg |B.Tech. Mechanical |12+ years |

| 5 |B.K. Suresh |Manager Engg |B.Tech. Mechanical |12+ years |

| 6 |A.Asif Musebhai |Asst Manager |B.E, Mechanical |8+ years |

| 7 |Samuel Goldwin |Sr.Engr, QC |B.E, Mechanical |7+ years |

| 8 |Nandan Kumar |Asst. Engr, Engg |B.E, Mechanical |8+ years |

| 9 |Vasanth Kersone |Asst. Engr, QC |B.E, Mechanical |7+ years |

|10 |P.S.Sonawane |Manager, QC |B.E, Mechanical |9 years |

|11 |Mukesh Kumar |Asst. Engr, QC |B.E, Mechanical |6+ years |

|12 |P.K.Parmar |Asst. Engr, Engg |B.E, Civil |8+ years |

|13 |V.S.Rao |Manager, Engg |B.E, Electrical/ Instruntation |17+ years |

|14 |P. Shankerlingham |Sr. Engr, QC |B.E, Instrumentation |8+ years |

|15 |Ghanshyam. K |Sr, Engr, QC |B.E, Electrical |8+ years |

|16 |Altamash Shaikh |Asst. Engr, QC |B.E, Mechanical |6+ years |

|17 |K.K. Singh |Manger |B.Sc, MBA |18+ years |

| | | |Marketing | |

|18 |N.K.Singh |Manager |, ICA |10+years |

| | | |Finance | |

|19 |Skilled Staff (NDT): 13 Nos. + Variable| |ITI, I.Sc | |

| |Staffs(Requisite) | | | |

|20 |Secretarial Staff/CAD | |Graduate/ Under graduate | |

| |Computer Operator & Office Assistant 5 | | | |

| |nos | | | |

Company Profile PRS EC

PROJECT/ TPI EXECUTED – AT A GLANCE

QUALIFYING PARAMETERS PROJECT- STATUS & EXECUTED

Details of Important Jobs on Single Work Order Value- carried out in Last FIVE Years

|SR. NO. |NAME OF WORK, LOCATION AND EMPLOYERS |WORK ORDER REF. & DATE |Project VALUE |YEAR OF Completion & |

| | | |Rs. In Lac |Ref. |

|36.0 |Consultancy (PMC) & Supervision for construction of |MSO/ENG/WO: 04/08-09/ | 72.00 | Cont… |

| |Additional Tank & allied job at IOCL Loni Terminal (MSO |LONI-ADDL. TANK-TPI | | |

| |Engg.) IOCL |Dtd:20.04.08 | | |

|35.0 |Third Party Inspection against fabri cation and supply of |SHEL/NGP/PEC/WO/2007/3961DATE: |1361.00 | Cont… |

| |Economizer Coil Blocks I & II in Utility Boiler of Power |16.11.2007 | | |

| |Plant at GAIL Pata, TNEB, Tuticorin GP, etc (Sunil | | | |

| |HiTech-Nagpur) | | | |

|34.0 |Rate contract for Process/ Distilla- tion Column |GAIL/PA07/12128/ 5309000 7695/ | PLANT | 2007 |

| |Inspection at GAIL (India) Ltd., Pata |LK/07 Dt 1.06.07 | |Completed |

|33.0 |Preparation of as built drawing of Fire Water System, |GAIL/PATA/C&P/ 2000983/ LK/)7 | PLANT | 2007 |

| |GAIL (India) Ltd., Pata |DT: 20.02.2007 | |Completed |

|32.0 |Third Party Inspection services at vendors Premises |SHEL/NGP/WO-26/2006/ 1338 / |592.00 | 2007 |

| |against supply items and for Fabrication of Boiler of |DATE: 08.02.2007 | |Completed |

| |Power Plant for MSED, Bhusawal (Sunil HiTech-Nagpur) | | | |

|31.0 |Consultancy (PMC) & TPI for Additional Tanks & various |MSO/ENG/WO-51/06-07/SAHAR AFS | 278.00 | 2007 |

| |engg. Work SAHAR AFS (ATF Tanks) & CS Intrntionl Airport |DATE: 28.12.2006 | |Completed |

| |(Pipe line) Indian Oil Corporation, Mumbai | | | |

|30.0 |Third Party Inspection/ Quality Surveill -ance at Vendors |GAIL/PSER/7062/5300006195/SKD | - | Cont… |

| |Premises GAIL (India) Ltd., Pata |DT: 01.11.06 | | |

|29.0 |Third Party Inspection( TPI ) for inventory of Plates, |GSO/ENG/LT/WO- 57/06-07 DATE: |1500.00 | 2007 Completed |

| |pipes, Flanges, Fittings, pumps, valves & other engg. |07.12.2006 | | |

| |materials)Indian Oil Corpn.-GSO- Engg, Ahmedabad | | | |

|28.0 |Non Destructive Testing (NDT) |SAA/PRS/RIL /NDT/06-07/01 | - | 2006 |

| |Inspection services at maintenance site at Reliance |DTD:28.06. 06 | |Completed |

| |Industries, M/S S.A | | | |

|27.0 |Consultancy for Project Managmnt (PMC) & Supervision for |GSO/ENG/LT/WO- 533/05-06 DATE: | 301.00 | 2007 Completed |

| |Fabricatn of new Tanks at IOCL Asoj BBOT, Savli Rd.( FO, |03.03.2006 | | |

| |LDO Tanks, TLF, Pipelines, Pump House etc) Indian Oil | | | |

| |Corpn. GSO-Engg Ahmedabad | | | |

|26.0 |Consultancy (PMC) & Site Super vision for Additional |MSO/ENG/WO-171/05-06/SAHAR AFS | 253.00 | 2007 |

| |Tanks&various engg. Work SAHAR AFS (ATF Water Tanks, |DT: 10.02.2006 | |Complted |

| |Pipeline) IOCL Mumbai | | | |

|25.0 |NDT Inspection of vessels, Tanks and Plant Piping using |SLPP/MECH./NDT-TPI/687 DATE: | | 2006 |

| |Ultrasonic Thickness measurement and Dye penetrant at |28.10.2005 |---- |Completed |

| |SLPP. GIPCL, | | | |

|24.0 |Third Party Inspection services for Health Check Up and |SLPP/STR/INV-TPI/362 DATE: | | 2005 |

| |valuation of surplus Inventry Material at differ ent |14.06.2005 |--- |Completed |

| |stores at GIPCL Installtion SLPP | | | |

|23.0 |Ultrasound Thickness measure ment and Dye Penetrant for |BTPL/A/1204/279/05 DATE: | | 2005 |

| |Tanks Vessels & Piping at NTPC, Paricha Petron-BANACO |06.05.2005 |--- |Completed |

| |Mumbai | | | |

|22.0 |Consultancy (PMC) & Supervision of Additional Tank, Pipe |MSO/ENG/WO-119/04-05/ GAIGON | 71.00 | 2005 |

| |line Projct for MS at TT, Akola (MSO-Engg ) Indian Oil |DATE: 11.10.04 | |Complted |

| |Corporation, Mumbai | | | |

|21.0 |Consultancy (PMC) & Supervision/ TPI for laying and |MSO/ENG/LT-16 /06-07/ VASCO | 118.15 | 2007 Completed |

| |welding of400mm Dia Piggable Pipeline for Tanker Discharge|Date: 14.07.2006 | | |

| |at VASCO Terminal Goa Indian Oil Corporation Mumbai | | | |

|20.0 |Consultancy (PMC) & Supervision of ATF Pipe line |MSO/ENG/WO-207/04-05/ SAHAR AFS| 49.65 | 2005 |

| |Proj-Phase 1 for extensi on of HRS to Bravo 3 at SAHAR |DATE:24.06.05 | |Complted |

| |AFS IOCL Mumbai | | | |

|19.0 |Consultancy (PMC) & Supervision of ATF Pipe line |MSO/ENG/WO-17/06-07/ SAHAR AFS | 24.22 | 2006 |

| |Project-Phase 2 for extension of HRS to Bravo 3 at AFS |Dtd:20.04.06 | |Complted |

| |SAHAR(MSOEngg.Aviation) IOCL | | | |

|18.0 |Preliminary Consultancy for Tankage Terminal & Pipelines |AV/KA/04 DT 02.01.2006 | 235.00 | 2006 |

| |for AFS Pune (MSO-Aviation Dept) Indian Oil Corporation | | |Complted |

| |Mumbai | | | |

|17.0 | Supervision & Third Party Inspec- tion (TPI) for Steam |MSO/ENG/WO-159/04-05/ TROMBAY | 23.00 | 2006 |

| |Pipeline work at TATA Power, Trombay (MSO-Engg.) Indian |DATE:05.01.05 | |Completed |

| |Oil Corpn. Mumbai | | | |

|16.0 |Consultancy (PMC) & Supervision for Ethnol Tank & |MSO/ENG/WO-167/04-05/ GAIGON | 7.00 | 2005 |

| |Pipelines at Gaigon TT (MSO-ENGG) IOCL, MSO |DATE:14.02.05 | |Completed |

|15.0 |Consultancy (PMC) & Supervision of Oil Water separation |MSO/ENG/WO-173/04-05/ | 15.61 | 2005 |

| |plant (OWS) & Pipeline at Additional Tankage Project, |GAIGON | |Completed |

| |Gaigon TT, Akola Indian Oil Corporation, Mumbai |Date:07.03.05 | | |

|14.0 |Third Party Inspection (TPI) & Quality Surveillance for |BTPL/A/1104/610/04 DATE: | 196.2 | 2005 Completed |

| |Paricha Power Project On BANCO Techn ology Mumbai |29.08.04 | | |

|13.0 |Third Party Inspection (TPI) & Quality Surveillance for |BBTPL/A/1101/316/04 | 149.63 | 2005 |

| |Vemagiri Power Project through L & T Vemagiri Power |DATE:30.05.04 | |Completed |

| |Project On BANCO Technology Mumbai | | | |

|12.0 |Third Party Inspection (TPI)& Qlty Surveillance for NPCIL, |BNC/M/920/2004 DATE: | 465.00 | 2005 |

| |DAE,IOC ,L&T,NTPC, KRIBH CO etc ISO 9000 QUALITY SURVILENCE|15.09.2004 | |Completed |

| |for BANACO Technology,Mumbai | | | |

| | | | | |

|11.0 |Third Party Inspection (TPI)-Control Cable Gujarat Industrial|SLPP/ELECT/CONTROL CABLE/ | 148.27 | 2004 |

| |Power Corp. Co. Ltd (GIPCL) on Polycab Wire Ltd.& Diamond |INSP/14620 DATE: 10.12.2003 | |Completed |

| |Cable Ltd, BARODA | | | |

|10.0 |Third Party Inspection (TPI)- Refinery equipments MUTAWA |OR-10402/03 DATE:08.06.03 | 03.67 | 2003 |

| |Trading Co. LLC Sultanate of Oman On Steel Tube India, |STI/AMT/TPI/PRS-01 DATE |($7401) |Completed |

| |MUMBAI |: 11.07.2003 | | |

| 9.0 |Third Party Inspection (TPI)- Refinery equipments SHAHIG Co.|PO-440 DATE:27.10.2003 | 14.5 ($30100) | 2003 |

| |LLC Saudi Arabia on Steel Tube (I), MUMBAI | | |Completed |

|8.0 |Third Party Inspection (TPI), QS & Enforcing QA for Cl dosing|BNC/A/1094/2004 DATE: | 58.4 | 2005 |

| |system for Dep. of Atomic Energy (DAE), KOTA Dept. of Atomic |03.08.2004 | |Completed |

| |Energy, Kota On BANCO Technlgy Mumbai | | | |

| 7.0 |Third Party Inspection (TPI) –Refinery equipments BEC |0115PO345/OF-15101 DATE: | 05.38 | 2004 |

| |Sultanate of Oman on Steel Tube (I), Mumbai |11.05.2004 |($11200) |COMPLETED |

| | |STI/BEC/TPI/PRS-8216 | | |

| | |DT:04.06.2004 | | |

| 6.0 |Third Party Insp. (TPI) for Chlori nation Plant at NTPC, |BNC/A/1304/279/05 DATE: | 37.00 | 2005 |

| |Kahalgon National Thermal Power Corpn./ Petron Engg/ BANACO, |06.03.2005 | |Completed |

| |Mumbai | | | |

| 5.0 |Third Party Inspection (TPI)& Qlty Surveillance for Krnataka |BTPL/A/1082/516/04 DATE: | 63.20 | 2005 |

| |Water Supply&Sewerage Board Krnataka Water Supply & Sewerage|03.12.2004 | |COMPLETED |

| |Board on BANCO Technology, Mumbai | | | |

|4.0 |Third Party Inspection (TPI)-Items for BSES 2x250 MW TDTPS |BNC/A/1090/812/03 DATE: | 83.00 | 2004 |

| |U7x8 BSES PO on Babubhai Narotamdas & Co, MUMBAI, |21.11.03 | |Completed |

| 3.0 |Third Party Inspection (TPI)& Qlty Surveillance for IOCL |BTPL/A/1098/446/04 DATE: | 77.5 | 2004 |

| |Panipat throu gh REL IOCL Panipat Project On BANCO |26.03.2004 | |Completed |

| |Technology, Mumbai | | | |

| 2.0 |Third Party Inspection (TPI) – for EOT Crane for 4x250 MW |BM/JPL/4X250MW/INS/006 | 240.00 | 2006 |

| |Raigarh Thermal Power Plant. Jindal Power Ltd | | |Completed |

| 1.0 |Radiography of Storage Tank & Pipelines at IOCL Site Quality |QFE/PRS/WO-112/LN-AK/05 | | 2005 |

| |Fabricators & Erectors, Mumbai |DATE:19.05.05 | |Completed |

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download