2013 Summer Projects - Anchorage, Alaska
2016 Summer Projects Completed and 2017 & Beyond projects
Winter Maintenance:
□ Applied 977 yards of traction E-chips to the service area
□ Cold patched roads that where asphalt potholing was constant from the warm and wet winter
□ Plowed and stored snow
□ Steam thaw
Spring projects:
□ Advanced pothole patching before spring grading of all dirt roads
□ Back fill lamp post in Townsquare with pea gravel to keep garbage out
□ Spring street sweeping of all paved roads, week of April 26th
□ Dust control, calcium chloride application all dirt roads, started May1st
□ Vac-truck all storm water system intakes
□ Removed Junk cars for the Fire Department
□ Brushing of bike paths and roadways shoulders
□ Crack sealed 7,111 linear feet of asphalt roads
□ Remove abandon cars around town
Fall Projects:
□ Sweep streets
□ Clean up leaves and clean out storm intakes
□ Grade and compact all roads before freeze
□ Bring in winter sanding chips
□ Grind up brushings
Airport Side:
Arlberg Avenue:
□ Patch repair road with asphalt, completed June 2016
□ Crack seal, completed June 2016
□ Grade and repair shoulders, completed June 2016
□ Clean debris out from under the guard rails to improve drainage, completed June 2016
□ Removed dirt and winter debris build up from Guardrails, completed 6-14
□ Shoulder and drainage repair, completed July 2017
□ Grind Asphalt and repaved 27,000 sq. ft. of roadway, completed 9-1-16
□ Culvert replacement or clean out and ditch clean out from 304 to 450, completed 8-30-16
Alyeska View
□ Remove old steel cross culvert between Cortina and Brighton, completed 6-24
□ Replace cross- Culvert at Cortina and Alyeska View, completed 6-24
□ RAP spread, graded and compacted at the Garmisch intersection, completed 8-18
351 Davos
□ Replace and lower driveway culvert, completed 6-24
Donnner and Davos intersection
□ Spread RAP, Grade and compact, completed 9-27-16
Cortina
□ Install new driveway culverts and ditching at 245 and 257 Cortina, completed 6-29
Alpine Meadows
□ Replace and clean up ditching at 1030 Alpine Meadows, completed 7-5-16
Mt. Hood
□ Clean out drainage area from cross culvert of Mt Hood., completed 6-18-16
Bike path
□ Crack sealing from Alyeska T to Hotel
□ Brushing on bike path, completed Spring 2016
Projects for 2017:
Arlberg
□ Repave the last two remaining section between Nina’s wall and intersection with Tram Way
□ Grade and compact shoulders to maintain drainage
Alyeska View
□ Improve drainage between Davos and Cortina
□ Brushing
Challenge/Mountain Side:
Taos
□ New driveway culverts at 200 & 224 Taos, completed June 2016
Veriber
□ Remove rock out ditch line and reshape ditch to control water, completed June 2016
□ Stabilize bank of ditch to support bike path. , completed June 2016
□ Clean around Beehive in-take and mark beehive for winter, completed June 2016
□ Vac-truck drainage system. Complete 2017
Alyeska Condo’s drainage:
□ Remove all drainage pipe that causing the ground to fail, completed 6-27
Olympic Mountain Loop
□ Installed new berms to control traffic and parking, completed 8-10-16
White Pass
□ Tied ditch into new drainage storm system inlet, completed 7-27-16
□ Removed old abandon storm system culvert behind Alyeska West Condos, completed 7-27-16
Projects for 2017:
Taos
□ Replace cross culvert at intersection of Chrystal mountain
Brighton
□ Dig out road bed and remove organic/wood material that causes constant potholing
□ Ditch both sides of the road and collect water off Chrystal Mt road to send it directly to Alyeska creek
Chrystal Mountain
□ Ditching improvements on several aspects of the road
□ Clean out cross culvert at White pass intersection
Timberline side:
Alyeska View:
□ Removed all pipe and installed new Curtain drain at 244 Alyeska View, completed 6-2
□ RAP spread, graded and compacted at the Garmisch intersection
Alpine Meadows:
□ Build new headwall on Tanka creek culvert, completed 8-8-16
Garmisch:
□ Install new drainage system from Alyeska Daylodge parking lot to Alyeska View, completed 7-22
Loveland:
□ Build new headwall on Tanka creek culvert, completed 8-9-16
Timberline
□ Asphalt pavement repair from Alyeska Highway to Church, Completed Oct 2016
Culvert markings
□ Mark major culverts, especially ones prone to freezing
172 Kitzbueal
□ New Culvert
□ Improved ditching
Timberline
□ Ditching up on the upper portion of Timberland
□ Brushing Virgin Creek to Turn
Projects for 2017 and beyond:
Alta
□ Remove old culvert closest to 260 Alta and replace with new, creates an overall drainage if the main line plugs up
Alyeska View to Higher Terrace
□ Might need another cross culvert further down the hill
□ Install curtain drain for spring water in front of 270 Alyeska View
□ Alyeska View (Northland to Upper Terrace hill needs ditching improvements)
Alpine Meadows
□ Ditching down left side between Northland and Loveland
□ Cross Culvert at corner of Megeve
□ Several Driveway culverts along this stretch
Bursiel
□ Exam glaciations problem from natural spring at Alyeska Highway, spoke with Right of Away and property owner
Deb’s Way Trailhead
□ Finish Path Improvements
□ Re-set bollards
Townsquare:
□ Brushed alders on Holgrem and park and ride, completed 8-18-16
□ Towed several junk cars, completed over the summer
□ Aphalt repair and cracksealing on all streets, especially to the school, completed June 2016
2017 Project and Beyond
Girdwood Park and Tennis court parking lot area
□ Improve drainage
□ Improve parking surface
Mine Roads:
Ruane Road
□ Brushed both sidehills on each direction of the road, completed 7-7-16
Jewel Mine Road
□ Brought in new road bed material and capped it with RAP to rise the road and improve drainage, completed 6-20-16
Gunnysack Mine and Sproat intersection:
□ New cross culvert installed, completed 8-19-16
2017 Project and Beyond
Gunnysack Mine
□ Replace culvert at intersection
□ Ditch down both sides of the hill to connect with new DOT drainage system
Sproat
□ Ditch and possible culvert replacements from Gunnysack to 383 Sproat
Old Girdwood:
West St
□ Cut back east bank of the road, straighten the road and returned road to the platted right of way, installed a 2 inch layer of recycled Asphalt, completed 8-17-16
Old Dawson:
□ Replace cross culvert at 245 Old Dawson, completed 9-19-16
□ Graded and compacted 3” of new RAP on the entire Old Dawson including the intersection at Gold, completed 9-20-16
Billy’s Alley
□ Brushed entire alley, completed 4-2-16
2017 Project and Beyond
□ Brush dike road
□ Add RAP to Main between Gold and end of road
Road maintenance industrial lot:
□ Built a new Winter chip storage out of cement blocks
□ Started the relocation of the Fire Department to their new lot
2017 Project and Beyond
□ Electric to Bull rail
□ Lights installed
□ Hydroseed
□ Build fence
□ Continue relocating GFD to their new lot
□ Continue stockpile of RAP and high quality road material as it becomes available
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
- objective brighton hove city council
- 2013 summer projects anchorage alaska
- englishcanónigo blog del departamento de inglés del ies
- reforming our railways putting the customer first
- brighton hove local access forum
- sen school travel plans
- emily meager transformation theology
- c subline 13 masox am doku
- liverpool vg m s holiday workshops
Related searches
- anchorage alaska events
- anchorage alaska events calendar
- anchorage alaska entertainment
- events in anchorage alaska 2019
- anchorage alaska events august
- anchorage alaska summer solstice festival
- anchorage alaska events 2020
- events in anchorage alaska today
- anchorage alaska history
- anchorage alaska rentals
- anchorage alaska things to do summer
- anchorage alaska current news